CHECKLIST TANK

No. Data Washing Tank 2


1 General Data
Owner/operator BOB PT Bumi Siak Pusako – Pertamina Hulu
Location Terantam GS
Service Crude Oil
Tag no.
Serial no. WT.01.CP.BOB.06.2011
Code API 650 10th Edition
Operating pressure 1 Atm
Operating Temperture F
Internal vacuum 0.18 Psig
Storage capacity 1000 BBL
Liquid specific gravity 0.86
Manufacturer CV. Citra Perdana
Year built / operating 2011
PWHT -
RT
Painting (internal, external) Painting
Max. / min. Liquid level 4.57 M

2 Shell data
Material
Diameter (OD) 6.5554 M
Height 4.88 M
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency

3 Roof data
Type Cone Roof
Material
Diameter (OD)
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency
Roof slope
CHECKLIST TANK

4 Bottom data
Material
Diameter (OD) 6.5554 M
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency
Bottom slope

5 Nozzle data
Service
Diameter
Schedule
Material
Flange type & rating # 150

6 Visual inpection
Shell
Deskripsi : Shell tangki terdiri dari 3
courses dengan ketebalan minimum 5.4 mm
Proteksi coating shell menggunakan
painting dengan kondisi masih baik
Tangki dilengkapi dengan stairway

Roof
Deskripsi : Tipe roof adalah cone roof
dengan ketebalan minimum 5.1 mm
Proteksi coating roof berupa painting
dengan kondisi masih baik

Level Indikator Gauge

Rekomendasi : Pasang Level indicator


gauge Tidak terpasang
CHECKLIST TANK

Manway/flush drain out door


Deskrpisi : Kondisi pada pada manway
masih baik.
Ketebalan pad dan nozzle serta pelat
manway masih baik

Sample Cock

Grounding System
Deskripsi : Pada tangki terpasang
grounding system.
Rekomendasi : Lakukan
pemeriksaan/pengukuran garounding system
secara berkala,

Temperature gauges
Deskripsi : Pada tangki terpasang
temperature gauge dengan kondisi masih baik
dan beroperasi
Rekomendasi : Lakukan kalibrasi
temperature gauge secara berkala

Safety Device
Deskripsi : Pada roof tangki terpasang
safety device berupa breather valve dan
venting.
Rekomendasi : lakukan pemeriksaan
safety device secara berkala.
CHECKLIST TANK

Name Plate

7 Drawings (Sketches)
Side view, complete with dimensions

Top view, complete with dimensions

Nozzle orientation, complete with


dimensions

Rekoendasi :

1. Lakukan pengukuran/pemeriksaan grounding sytem


2. Lakukan pengukuran kemiringan (plumbness} dan settlement
3. Lakukan kalibrasi volume tangki

Inspected by : Reviewed by :
PT .Trihasco Utama BOB PT. BSP- Pertamina Hulu

Holidi akhmad sukron


Storage Tank Inspector