SECTION VI

BILL OF QUANTITY

CONTENTS

PREAMBLE ……………………………………………………………………… BOQ – 1

1. Intoduction ……………………………………………………………………… BOQ – 1


2. Estimated Quantities ……………………………………………………………. BOQ – 1
3. Works To Be Measured ………………………………………………………… BOQ – 1
4. Pricing of Items ………………………………………………………………… BOQ – 1
5. Works and Services Not Separately Measured ………………………………… BOQ – 1
6. Currency ……………………………………………………………………….. BOQ – 1
7. Provisional Sums ………………………………………………………………. BOQ – 2
8. Value Added Tax ………………………………………………………………. BOQ – 2
9. Overhead and Profit ……………………………………………………………. BOQ – 2
10. Description of Work in The Bill Of Quantities ………………………………... BOQ – 2
11. Method of Measurement ………………………………………………………. BOQ – 2
12. Arithmetic Correction …………………………………………………………. BOQ – 2
13. Numbering of Items in The Bill Of Quantities ………………………………… BOQ – 3
14. Abbreviations ………………………………………………………………….. BOQ – 3
15. Summary Of Bill Of Quantities ……………………………………………….. BOQ – 4
16. Bill Of Quantities ……………………………………………………………… BOQ - 5

BOQ - i
March , 2004

Section VI. Bill of Quantities

PREAMBLE

1. Introduction

The Bill of Quantities includes this Preamble, the Divisions of the Bill of Quantities, the
Schedule and the Summary shall be read in conjunction with the Instructions to Bidders,
Conditions of Contract, Specifications and Drawings.

2. Estimated Quantities

The quantities set out in the Bill of Quantities are the estimated quantities of the Works and
provide a common basis for Bidding and they are not to be taken as the actual and correct
quantities of the Works to be executed by the Contractor in fulfillment of his obligations under
the Contract.

3. Works to be Measured

For the purpose of ascertaining the value and amount of work done, the Works shall be
measured as provided for in Measurement and Payment of the Specifications at such
frequency as may be necessary for the purpose of payment under Clause 42 of the Conditions
of Contract. The Permanent Works shall be measured net, notwithstanding any general or local
custom except where otherwise specifically described or prescribed in the Contract.

The quantities in the respective items in the Bill of Quantities shall be measured in accordance
with the method of measurement described in Clause 11 of this Preamble.

4. Pricing of Items

The prices in the Bill of Quantities shall, except where otherwise provided in the Contract,
cover all the Contractor's obligations under the Contract and all matters and things necessary
for the proper execution, completion and repair of the Works, as set out in the Conditions of
Contract, including the overhead and profit. If no price is entered against any quantified item
of the Bill of Quantities and the Bid is accepted notwithstanding Sub-Clause 13.2 (Item not
priced) in the Instructions to Bidders, the cost of the work covered by the item shall be
deemed to be covered by the prices for other items.

5. Works and Services not Separately Measured

Except where otherwise detailed in the Bill of Quantities or specified in the Contract, labour,
including the supervision thereof, materials, Constructional Plant and Equipment, Temporary
Works, transport to and from the Site and in and about the Works and other things of every
kind required for the execution, completion and repair of the Works shall not be measured and
the cost thereof shall be deemed to be included in the prices in the Bill of Quantities.

6. Currency

Where the Contract provides for part of the Contract Price to be payable in Foreign
Currency(ies) and part in Indonesian Rupiahs, the total price shall be the sum of the Foreign
Currency(ies) and Indonesian Rupiah portions.

BOQ - 1
March , 2004

7. Provisional Sums

Not applicable.

8. Value Added Tax

Indonesian Value Added Tax (PPN) is payable by the Contractor to the Government on the
total cost of the Works prior to PPN. Where the Contract provides for part of the Contract
Price to be payable in foreign currency(ies), the Indonesian Rupiah portion of the total cost of
the Works prior to PPN is enhanced in the Summary of the Bill of Quantities by the amount of
PPN payable on the combined Foreign and Indonesian currency portions.

9. Overhead and Profit

Overheads and profits are entered in any price analysis of the Unit Price and Lump Sum and
are not included in the unit rates and lump sum items.

Overhead are defined as the costs of:


- Insurance of all kinds;
- Head office establishment and operation and all goods, staff, services and materials of all
kind that are neither used on the site nor form part of the cost of providing materials, labour,
equipment or finance for any pay item;
- Superintendence, management, accounting, training and auditing;
- Complying with legal requirements of licensing, registering and forming companies, Joint
Operations and Joint Ventures;
- Advertising, public relations and company promotional costs;
- Complying with the Section 3 Conditions of Contract and Section 4 Contract Data except
where these documents refer to the execution of the works;
- etc.

The payments made for completed accepted work paid for as pay items at the Contract Unit
Price or as Contract Lump Sum for that item shall be full compensation to the Contractor for
all costs of any kind whatsoever, including the overheads and profits.

10. Description of Work in the Bill of Quantities

The descriptions of work covered by the respective items are to identify the location and
nature of the work, but the exact nature and extent of the works is to be ascertained from the
Drawings, Specification and Conditions of Contract as the case may be, read in conjunction
with the method of measurement.

Where references are made in the Bill of Quantities to specific Drawings or parts of the
Specifications or Conditions of Contract, unless otherwise stated, such references shall not
limit general requirements stated elsewhere in the Contract.

11. Method of Measurement

If a method of measurement is set out in the Technical Specifications or elsewhere in the


Contract Documents such method of measurement shall govern.

12. Arithmetic Correction

Errors will be corrected by the Employer for any arithmetic errors in computation or
summation as provided for in Sub-Clause 27.2 (Amount of the Bid) of the Instructions to
Bidders.

BOQ - 2
March , 2004

13. Numbering of Items in the Bill of Quantities

The Devisions of the Bill of Quantities are numbered in accordance with the corresponding
sections of the Technical Specifications. The items in each part of the Priced Bill of
Quantities shall be read in conjunction with the Measurement and Payment Clauses in the
relevant sections of the Specifications.

13. Abbreviations

The following abbreviations of units of measurement have been and shall be used in the Bill
of Quantities.

cu.m .......................................................................................................... Cubic metre

sq.m ......................................................................................................... Square metre

km ................................................................................................................. kilometre

dm ................................................................................................................. decimetre

l.m ............................................................................................................ Linear Metre

dm ................................................................................................................. decimetre

cm ................................................................................................................ centimetre

mm ............................................................................................................... millimetre

kg ............................................................................................................... kilogramme

tonne ........................................................................................... metric tonne/1,000 kg

l .............................................................................................................................. litre

each ................................................................................................................. Number

hour ...................................................................................................................... Hour

Rp. ................................................................................. Rupiah (Indonesian Currency)

BOQ - 3
March , 2004

SUMMARY OF BILL OF QUANTITIES

No. Package : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Division Description Total Bid Price


No. (Rupiah)
1 General 116.023.787,50
2 Drainage 6.144.373.568,49
3 Earthworks 1.747.427.320,53
4 Pavement Widening and Shoulders 23,235,502,117.46
5 Granular Pavement 7,281,502,049.83
6 Asphalt Pavement 24,648,752,218.74
7 Structures 1,341,322,691.49
8 Reinstatement and Minor Works 1,071,208,097.74
9 Daywork 23,657,672.46
10 Routine Maintenance Works 545,363,091.05
(A) Sum of Divison 1 to 10 ( including overhead and profit) 66,155,132,615.29
(B) Value Added Tax ( PPn ) = 10% x (A) 6,615,513,261.53
(C) TOTAL BID PRICE = (A) + (B) 72,770,645,876.82
Written in words : …
Seventy Two Billion Seven Hundreds Seventy Million Six Hundreds Fourty Five Thousands
Eight hundreds Seventy Six 82/100 Rupiah………………………………………………….........…………
BID PRICE COMPONNETS CARRIED TO BID :
(D) Local Currency Component of Total Bid Price { ……. % x (C) + (B) }
Written in words : ………………………………………………………………………………………………….........…………
(E) Foreign Currency Component of Total Bid Price { …… % x (C)} / Exchange Rate
Written in words : ………………………………………………………………………………………………….........…………
BID PRICE COMPONENTS :
(i) Portion of Loan { ….. % x (C) } :
Written in words : ………………………………………………………………………………………………….........…………
(ii) Portion of GOI { ….. % x (C) – (B) } :
Written in words : ………………………………………………………………………………………………….........…………
(iii) VAT ( 10% ), consists of :
- Portion of Loan ( not taken ) = 10% x (i)
- Portion of GOI ( taken) = 10% x (ii)
Written in words : ………………………………………………………………………………………………….........…………

Exchange Rate, as specified in the Instructions to Bidders, .............…., ................. 20 …...


used to convert the foreign currency component to Rupiah;

1 .................... (FC) = Rp. ......................... Signature and Seal

( ...........................…………. )

BOQ - 4
March , 2004

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a B c d e f = (d x e)

Division 1. GENERAL

1.2 Mobilisation LS 1 116,023,787.50 116,023,787.50


‘1.18(1) Maintenance and Protection of Traffic
1.18(2) Ducth CPT Including Report Each
1.18(3) Boring Test including SPT and Report Each
116,023,787.50
Total Bid Price for Division 1 (carry to Summary of Bill Of Quantities)

Division 2. DRAINAGE

2.1 Excavation for Drainage Ditches & Waterways Cu.M 53.389,00 21.179.83 1.130.769.745.12
18.828,32 266,279.93 5,013,603,823.37
2.2 Mortared Stoneworks Cu.M

2.3 (1) Reinforced Concrete Pipe, inner diameter < 45 cm LM

2.3 (2) Reinforced Concrete Pipe, inner diameter 45 - < 75 cm LM

2.3 (3) Reinforced Concrete Pipe, inner diameter 75 - 120 cm LM

2.3 (4) Corrugated Steel Pipe tonne

2.3 (5) Unreinforced Concrete Pipe, inner diameter 20 cm LM

2.3 (6) Unreinforced Concrete Pipe, inner diameter 25 cm LM

2.3 (7) Unreinforced Concrete Pipe, inner diameter 30 cm LM

2.4 (1) Porous Backfill or Filter Material Cu.M

2.4 (2) Plastic Filter Fabric Cu.M

2.4 (3) Perforated Pipe for Sub-surface Drainage LM

6,144,373,568.49
Total Bid Price for Division 2 (carry to Summary of Bill Of Quantities)

BOQ - 5
March , 2004

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c d e f = (d x e)

Division 3. EARTHWORKS

3.1 (1) Common Excavation Cu.M 85,812.00 20,363.44 1,747,427,320.53

3.1 (2) Rock Excavation Cu.M

3.1 (3) Structure Excavation, 0 - 2 metres in depth Cu.M

3.1 (4) Structure Excavation, 2 - 4 metres in depth Cu.M

3.1 (5) Structure Excavation, 4 – 6 metres in depth Cu.M

3.1 (6) Cofferdam, Shoring, Bracing and related works LS

3.1 (7) Excavation on Existing Asphaltic Pavement with Cold Milling Cu.M
Machine

3.1 (8) Excavation on Existing Asphaltic Pavement without Cold Cu.M


Milling Machine

3.1 (9) Extra for Haulage of Excavated Material in excess more than 5 CuM /
km Km

3.2 (1) Common Embankment Cu.M

3.2 (2) Selected Embankment Cu.M

3.2 (3) Selected Embankment in Swampy Area Cu.M


(measured by truck volume)

3.3 Grade Preparation Sq.M

1,747,427,320.53
Total Bid Price for Division 3 (carry to Summary of Bill Of Quantities)

BOQ - 6
March , 2004

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c d e f = (d x e)

Division 4. PAVEMENT WIDENING AND SHOULDERS

4.2 (1) Aggregate Base Class A Cu.M 10,046.00 165,628.48 1,663,903,726.88

4.2 (2) Agggegate Base Class B Cu.M 140,115.80 153,955.50 21,571,598,390.58

4.2 (3) Soil Cement Base Cu.M

4.2 (4) Cement for Soil Cement Base tonne

4.2 (5) Single Surface Dressing Sq.M

4.2 (6) Bituminous Material for Surface Dressing litre

4.2 (7) Prime Coat litre

23,235,502,117.46
Total Bid Price for Division 4 (carry to Summary of Bill Of Quantities)

Division 5. GRANULAR PAVEMENT

5.1 (1) Aggregate Base Class A Cu.M

5.1 (2) Aggregate Base Class B Cu.M

5.2 (1) Unsealed Road Base Class C Cu.M

5.4 (1) Cement for Soil Cement Base tonne

5.4 (2) Soil Cement Base Cu.M

Total Bid Price for Division 5 (carry to Summary of Bill Of Quantities)

BILL OF QUANTITIES

BOQ - 7
March , 2004

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c d e f = (d x e)

Division 6. ASPHALT PAVEMENT

6.1 (1) Prime Coat litre 90,090.00 3,406.46 306,887,577.95

6.1 (2) Tack Coat litre 23,465.50 4,220.51 793.653.301,62

6.2 (1) Single Surface Dressing Aggregate Sq.M

6.2 (2) Double Surface Dressing Aggregate Sq.M

6.2 (3) Bituminous Material for Surface Dressing litre

6.3 (1) Sand Sheet (SS) Class A Sq.M

6.3 (2) Sand Sheet (SS) Class B Sq.M

6.3 (3) Hot Rolled Sheet – Wearing Course (HRS-WC) Sq.M

6.3 (4) Hot Rolled Sheet – Base (HRS-Base) Cu.M

6.3 (5) Asphaltic Concrete – Wearing Course (AC - WC) Sq.M 218,266.00 40,756.89 8,895,843,166.71

6.3 (6) Asphaltic Concrete – Binder Course (AC - BC) Cu.M 17,066.00 899,272.53 15,346,985,063.02

6.3 (7) Asphaltic Concrete – Base (AC - Base) Cu.M

6.4 (1) Lasbutag Sq.M

6.4 (2) Latasbusir Class A Sq.M

6.4 (3) Latasbusir Class B Sq.M

6.4 (4) Asbuton Bitumen tonne

6.4 (5) Modifier Bitumen tonne

6.4 (6) Anti-Stripping Agent litre

6.5 Cold Mix Asphalt for Resurfacing Cu.M

6.6 Penetration Macadam Levelling Cu.M

24,648,752,218.74
Total Bid Price for Division 6 (carry to Summary of Bill Of Quantities)

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)

BOQ - 8
March , 2004

Province / Kabupaten :JAWA BARAT


Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c D e f = (d x e)

Division 7. STRUCTURES

7.1 (1) Structural Concrete Class K500 Cu.M


7.1 (2) Structural Concrete Class K400 Cu.M
7.1 (3) Structural Concrete Class K350 Cu.M
7.1 (4) Structural Concrete Class K300 Cu.M
7.1 (5) Structural Concrete Class K250 Cu.M 326.46 522.331,54 170.520.616,36
7.1 (6) Unreinforced Concrete Class K175 Cu.M
7.1 (7) Cyclopean Concrete Class K175 Cu.M
7.1 (8) Concrete Class K125 Cu.M

7.2 (1) Precast Unit Type I Girder Span 16 metres each


7.2 (2) Precast Unit Type I Girder Span 20 metres each
7.2 (3) Precast Unit Type I Girder Span 22 metres each
7.2 (4) Precast Unit Type I Girder Span 25 metres each
7.2 (5) Precast Unit Type I Girder Span 28 metres each
7.2 (6) Precast Unit Type I Girder Span 30 metres each
7.2 (7) Precast Unit Type I Girder Span 31 metres each
7.2 (8) Precast Unit Type I Girder Span 35 metres each
7.2 (9) Strand for Cast in-Situ Post-tensioned Concrete Work kg
7.2 (10) Precast Hollow Slab span 21 meteres each
7.2 (11) Diapgraghm Concrete Class K350 including Post Tensioning Cu.M
Work

7.3 (1) Reinforcing Steel Plain Bar U24 Kg 40.143,28 8,782.70 352,566,374.54
7.3 (2) Reinforcing Steel Plain Bar U32 Kg
7.3 (3) Reinforcing Steel Deform Bar D32 Kg
7.3 (4) Reinforcing Steel Deform Bar D40 Kg 48.772,8 10.629,00 518.405.950,56
7.3 (5) Reinforcing Steel Deform Bar D48 Kg
7.3 (6) Welded Wire Mesh Kg

7.4 (1) Structural Steel, yield point of 2500 kg/cm2 Kg


7.4 (2) Structural Steel, yield point of 2800 kg/cm2 Kg
7.4 (3) Structural Steel, yield point of 3500 kg/cm2 Kg

7.5 (1) Erection of Steel Bridge Structures Kg


7.5 (2) Transportation of Steel Bridge Materials Kg

7.6 (14) Grouping of Mini Timber Piles (Cerucuk), furnished and driven LM
7.6 (2) Untreated Timber Sheet Pile Sq.M
7.6 (3) Treated Timber Sheet Pile Sq.M

Division 7 to be continued in the following page.

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT

BOQ - 9
March , 2004

Bidder Name :

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c d e f = (d x e)

7.6 (4) Structural Steel Sheet Pile Sq.M


7.6 (5) Precast Concrete Sheet Pile Sq.M
7.6 (6) Untreated Timber Pile, furnished Cu.M
7.6 (7) Treated Timber Pile, furnished Cu.M
7.6 (8) Steel Pipe Pile, furnished Kg
7.6 (9) Precast Reinforced Concrete Pile, furnished Cu.M
7.6 (10) Precast Prestressed Concrete Pile, furnished LM
7.6 (11) Timber Pile, driven LM
7.6 (12) Steel Pipe Pile, diameter 400 mm, driven LM
7.6 (13) Steel Pipe Pile, diameter 500 mm, driven LM
7.6 (14) Steel Pipe Pile, diameter 600 mm, driven LM 864,00 458.571,41 396,205,698.24
7.6 (15) Precast Concrete Pile : 30 cm x 30 cm or diameter 30 cm, LM
Driven
7.6 (16) Precast Concrete Pile : 16 cm x 16 cm, Driven LM

7.6 (17) Precast Concrete Pile : 50 cm x 50 cm or diameter 50 cm, LM


Driven
7.6 (18) Cast in Place Concrete Pile, diameter 600 mm LM
7.6 (19) Cast in Place Concrete Pile, diameter 800 mm LM
7.6 (20) Cast in Place Concrete Pile, diameter 1000 mm LM
7.6 (21) Cast in Place Concrete Pile, diameter 1200 mm LM
7.6 (22) Cast in Place Concrete Pile, diameter 1500 mm LM
7.6 (23) Additional Prices to Prices Nos.7.6.(11) – 7.6.(17) when the LM
pile is executed in the Water Stream.
7.6 (24) Additional Prices to Prices Nos.7.6.(18) – 7.6.(22) when the LM
pile is executed in the Water Stream.
7.6 (25) Load Test for diameter pile up 600 mm each
7.6 (26) Load Test for diameter pile of more than 600 mm each

7.7 (1) Caisson 250 cm diameter, furnished LM


7.7 (2) Caisson 300 cm diameter, furnished LM
7.7 (3) Caisson 350 cm diameter, furnished LM
7.7 (4) Caisson 400 cm diameter, furnished LM
7.7 (5) Caisson 250 cm diameter, sunk LM
7.7 (6) Caisson 300 cm diameter, sunk LM
7.7 (7) Caisson 350 cm diameter, sunk LM
7.7 (8) Caisson 400 cm diameter, sunk LM

Division 7 to be continued in the following page.

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

BOQ - 10
March , 2004

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a b c d e f = (d x e)

7.9 Stone Masonry Cu.M

7.10 (1) Grouted Rip Rap Cu.M


7.10 (2) Rip Rap Cu.M
7.10 (3) Gabions Cu.M

7.11 (1) Expansion Joint Torma Type LM


7.11 (2) Expansion Joint Rubber Type 1 LM
7.11 (3) Expansion Joint Rubber Type 2 LM
7.11 (4) Expansion Joint Rubber Type 3 LM
7.11 (5) Joint Filler for Construction Joint LM
7.11 (6) Expansion Joint Steel Angle Type LM

7.12 (1) Metal Bearing each


7.12 (2) Elastomeric Bearing Type 1 each
7.12 (3) Elastomeric Bearing Type 2 each
7.12 (4) Elastomeric Bearing Type 3 each
7.12 (5) Strip Bearng LM

7.13 Steel Bridge Railing LM

7.14 Bridge Name Plate each

7.15 (1) Demolition of Stone Masonry Cu.M


7.15 (2) Demolition of Concrete Cu.M
7.15 (3) Demolition of Prestressed Concrete Cu.M
7.15 (4) Demolition of Building Sq.M
7.15 (5) Demolition of Steel Truss Sq.M
7.15 (6) Demolition of Steel Stringers LM
7.15 (7) Demolition of Timber Deck Sq.M
7.15 (8) Demolition of Timber Bridge Sq.M
7.15 (9) Haulage in excess of 5 km Cu.M/
km
7.16.(1) Concrete Pavement Cu.M/
7.17(1) Wet Lean Concrete Sq.M. 8.75 364,769.94 3,191,736.93
7.17(2) Sand fILL ( t=10 Cm ) Sq.M. 17.5 88,481.39 1,548,424.36

713 (3) Geo-grid Sq.M.


1,568,191,522.23
Total Bid Price for Division 7 (carry to Summary of Bill Of Quantities)

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

BOQ - 11
March , 2004

Estimated Unit Total


Pay Item Description Unit Quantity Price Bid Price
(Rupiah) (Rupiah)
a B c d e f = (d x e)

Division 8. REINSTATEMENT AND MINOR WORKS

8.1 (1) Aggregate Base Class A for Minor Works Cu.M


8.1 (2) Aggregate Base Class B for Minor Works Cu.M
8.1 (3) Aggregate for Minor Works for Unsealed Roads Cu.M
8.1 (4) Waterbound Macadam for Minor Works Cu.M
8.1 (5) Hot Asphatic Mixture for Minor Works Cu.M
8.1 (6) Lasbutag atau Latasbusir for Minor Works Cu.M
8.1 (7) Penetration Macadam for Minor Works Cu.M
8.1 (8) Cold Asphaltic Mixture for Minor Works Cu.M
8.1 (9) Residual Bitumen for Minor Works litre

8.2 (1) Excavation for Shoulders and other Minor Works Cu.M
8.2 (2) Selected Tree Removal, diameter 15 - 30 cm each
8.2 (3) Selected Tree Removal, diameter 30 - 50 cm each
8.2 (4) Selected Tree Removal, diameter 50 - 75 cm each
8.2 (5) Selected Tree Removal, diameter > 75 cm each

8.3 (1) Stabilization by Vegetation Sq.M


8.3 (2) Shrubs Sq.M
8.3 (3) Trees each

8.4 (1) Pavement Markings Thermoplastic Type Sq.M 9,720.00 76,033.99 812,955,417.36
8.4 (2) Pavement Markings Non Thermoplastic Type Sq.M
8.4 (3) Road Signs with Reflector of Engineering Grade each 143 201,604.44 28,829,435.21
8.4 (4) Road Signs with Reflector of High Intensity Grade each
8.4 (5) Guide Posts each
8.4 (6) Kilometre Posts each 25 197,070.22 4,926,755.41
8.4 (7) Guard Rail LM 900 315,740.59 284,166,527.70
8.4 (8) Road Studs each 219 65,000.00 14,235,000.00
8.4 (9) Cat Eyes each
8.4 (10) Precast Portland Cement Concrete Curb LM
8.4 (11) Re-used Existing Precast Portland Cement Concrete Curb LM
8.4 (12) Block Paving on Sidewalks or Medians Sq.M

8.5 (1) Reinstatement of Concrete Bridge Deck Sq.M


8.5 (2) Reinstatement of Timber Bridge Deck Sq.M
8.5 (3) Reinstatement of Structural steel Bridges Sq.M

1,071,208,097.74
Total Bid Price for Division 8 (carry to Summary of Bill Of Quantities)

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total

BOQ - 12
March , 2004

Pay Item Description Unit Quantity Price Bid Price


(Rupiah) (Rupiah)
a b c d e f = (d x e)

Division 9. DAYWORK

9.1 Foreman hour 21 8.214.29 172.500.00

9.2 Genral Labour hour 84 4.928.57 414.000.00

9.3 Cartenper, Mason, etc hour 42.00 6.571.43 276.000.00

9.4 Dump Truck 3 - 4 M3 hour 21.00 166.485.94 3.496.204.72

9.5 Flat Bed Truk 3 - 4 tonnes hour

9.6 Water Tank 3000 - 4500 litres hour

9.7 Bulldozer 100 - 150 HP hour

9.8 Motor Grader min 100 HP hour 21.00 335.522.26 7.045.967.4

9.9 Wheel Loader 1.0 - 1.6 M3 hour

9.10 Track Loader 75 - 100 HP hour

9.11 Excavator 80 - 140 HP hour

9.12 Crane 10 - 15 Ton hour

9.13 Steel Wheel Roller 6 - 9 tonnes hour

9.14 Vibratory Roller 5 - 8 tonnes Hour 21.00 288.319.81 6.054.716.02

9.15 Vibratory Compactor 1.5 - 3.0 HP hour 21.00 130.4400 2.282.248.20

9.16 Tired Roller 8 - 10 tonnes hour 21.00 227.192.18 4.771.035.76

9.17 Compressor 4000 - 6500 litre/minute hour 21.00 86.836.31 1.823.562.52

9.18 Concrete Mixer 0.3 - 0.6 M3 hour

9.19 Water Pump 70 – 100 mm hour

26.042.373,31
Total Bid Price for Division 9 (carry to Summary of Bill Of Quantities)

BILL OF QUANTITIES

Package No. : PENINGKATAN & PEMBANGUNAN JALAN


Package Name : PEMBANGUNAN/PENINGKATAN JALAN RUAS CILEUNYI-SUMEDANG (24.85km)
Province / Kabupaten :JAWA BARAT
Bidder Name :

Estimated Unit Total

BOQ - 13
March , 2004

Pay Item Description Unit Quantity Price Bid Price


(Rupiah) (Rupiah)
a b c d e f = (d x e)

Division 10. ROUTINE MAINTENANCE WORKS

10.1 (1) Routine Maintenance of Pavement LS/Km 28.465 18.490.994.33 526.438.608,60

10.1 (2) Routine Maintenance of Shoulder LS/Km 28.465 1.710.791.97 48.697.693,53

10.1 (3) Routine Maintenance of Ditches, Drains, Cuttings & LS/Km 28.465 1.340.470.88 38.156.503,53
Embankments

10.1 (4) Routine Maintenance of Road Furniture & Road Markings LS/Km 28.465 332.543.91 9.465.862,38

10.1 (5) Routine Maintenance of Bridges LS/Km

622.758.668,05
Total Bid Price for Division 10 (carry to Summary of Bill Of Quantities)