Beruflich Dokumente
Kultur Dokumente
PROJECT:
CLIENT:
CONTRACTOR:
AREA PREPARED FOR BACK-FILLING
BACK-FILLED
GRID REFERENCE: STATUS CHECKED BY
NAME SIGNATURE
a. Necessary protection for concrete done as per Yes/No
specifications and inspected.
b. Complete area cleared of debris. Yes/No
c. Backfilling material is approved. Yes/No
d. Compaction method as per specification Yes/No
Doc. No: F 321 Rev. No: 00 Dated 30th March 2005 Page 1 of 1