Sie sind auf Seite 1von 1

QATAR DESIGN CONSORTIUM

ARCHITECTS, ENGINEERS, PROJECT MANAGERS & CONSULTANTS

Ref. No: CONCRETE CUBE TESTS SUMMARY Date:


PROJECT:
CLIENT:
CONTRACTOR:
Visual
Part of
Cube RMC Concrete Testing Cast Test Age Strength Density observations
Structure
Ref no. Supplier Mix Laboratory Date Date Days N/mm2 kN/m3 and notes on
poured
concrete at site.

NOTE: CONCRETE CUBE TESTS SUMMARY TO BE MADE ATLEAST AT


FOLLOWING STAGES
(1) FOUNDATION, COLUMN NECKS, GROUND BEAMS
(2) SLAB/ BEAM AT EACH LEVEL
(3) COLUMNS AT INDIVIDUAL FLOORS

CONTRACTOR
QDC’S REMARKS:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

ENGINEER
Note: This form must be submitted within 9 days of pour for 7 days strength and within 30 days for
28 days strength.

Doc. No: F 320 Rev. No: 00 Dated 30th March 2005 Page 1 of 1

Das könnte Ihnen auch gefallen