Sie sind auf Seite 1von 14

CIF Post processing is one of the routine activities done by our team during our production

support. I would like to share this information within SCN Community Members.
Before introducing CIF post processing it is better to understand CIF error handling. Data is
transferred between SAP ECC and SAP APO by means of queued remote function call (q RFC)
technology. Faulty ones can lead to extended queue blocks and inconsistencies between SAP
APO and SAP ECC. We can use CIF error handling to avoid queue blocks of this type during the
transfer of transaction data. CIF error handling ensures that all CIF queue entries are processed
during the data transfer. Faulty queues no longer lead to queue blocks. Instead, they are logged
in Post Processing records in the relevant target system for the data transfer.
Here lies the importance of CIF Post processing. CIF post processing is used to display and
process post processing records which are automatically generated during CIF. We will
manually remove plant status which are not in OK status. Once the error has been corrected my
marking this incorrect combinations as Obsolete and remaining planned orders/Purchase
requisitions will be sent to the relevant target system.
Prerequisites for doing CPP
1. SMQ1 (Outbound Queue)

2. SMQ2 (Inbound Queue)


Ensure all the inbound/Outbound queues are empty .It is quite essential as during the pushing
of orders it will consume much CPU/Memory. So we have to be very alert while doing this
process and have to facilitate easy flowing of queues.

3. As discussed above CIF error handling must be active.

Once we are clear with the above 3 we can proceed with CPP.

CIF Post Processing can be opened via tcode /N/SAPAPO/CPP.


Choose the target system by pressing an F4 on the target system. Choose respective ECC
system here.

Note: CIF Post Processing can only be processed by single user. IF others try to enter the
processing screen he/she will get an information popup like this.

On entering we can see the CIF purchase requisitions/planned orders available. We need to
process External procurement, In-house production (AP1 –>R3P) and In-house production
(R3P–>AP1).
Note: AP1 –>APO Production R3P –> ECC Production.

Let’s start with External procurement.


Click on the highlighted button and choose “Local File” from the list.

Select Spreadsheet from the list.

Give a suitable file name and click on generate.

You will get a message on the status bar stating so and so data has been downloaded.

Open the downloaded Excel File and perform the operations as follows.
Remove all entries except Prod. Desc and Location name. Duplicate product location
combination can be removed by clicking on the highlighted Remove Duplicate Button.

Choose both product and location and click OK.

Information will confirm so and so duplicates are removed and remaining unique values will be
left out.

Open ECC system and navigate to the Data browser via SE16.
Give the table name as Marc.

Add the product by clicking on the highlighted option.


Copy all the products and paste it in the space by clicking on the highlighted Copy to Clipboard
button.

Repeat the same procedure for Location also.

Note: Blank out the maximum No of hits.


Once all parameters are entered click on Execute or press F8.
Choose plant-Sp.material status (MS) field and click on the highlighted filter button.

Press F2 and choose Not Equal to from the list.

Give the status as OK and click on the highlighted button.


Table will list out the material-plant combination which are not in OK Status.

Open the Excel and put a filter for Product and location by using the highlighted button.

Choose the first incorrect combination and highlight in some color for easy reference.
All incorrect product-location combinations have been highlighted as above.

Now lets go back to CPP screen in APO as we are ready with incorrect material location
combination.

Choose product and location and click on Highlighted filter. Select Set Filter option from the
drop down list.

Product and location can be entered via highlighted buttons.


Copy and paste the values from the already prepared excel and click on execute.

Once values are entered click on the highlighted button.


Now those entries needs to remove and will make it as obsolete using the highlighted button.
Click on select all button and press on the highlighted Set entry as obsolete button.

On clicking obsolete buttons those entries will be marked as obsolete.

Note:We can see a reduction in the no of entries in the external procurement after the
removal of obsolete entries.

Now delete the filter by clicking on the Delete filter option.


Now choose the remaining entries and click on select all button (Highlighted left) and click on
send to R/3.

Note:Ensure Maximum entries have been pushed. Depending on the system performance we
can experience a change in speed of processing. But overall we should ensure CPU utilization
needs to be on the lower side while doing this activity.

Once external is done repeat the same procedure for in-house production to R/3.Ensure
maximum entries are pushed.

Now the final one In-house to APO.


For In-house production just click on select all options and click on APO button.Ensure
maximum planned orders are pushed to APO system.

Once the CPP Activity is complete ensure


1. SMQ1, SMQ2 are empty.
2. Perform CIF Reconciliation (CCR) process.

Das könnte Ihnen auch gefallen