Unit Price Averages Reports

12/7/2015

UNIT PRICE AVERAGES REPORT

Disclaimer

The information provided in the following Unit Price Averages Report is only for the use of
Alberta Infrastructure & Transportation staff and its Consultants for the development of
construction cost estimates on Department construction projects.

The unit price averages presented in this report are based on the cumulative average of the
unit prices from the three lowest bids received for the period from August 1, 2014, to
September 30, 2015 for 2015 construction projects. As well, the unit price averages are
weighted by bid quantity.

These unit price averages are provided for information only and, while thought to be accurate,
are provided without warranty of any kind, either expressed or implied. The Crown, its agents,
employees or contractors will not be liable for any damages, direct or indirect, or lost profits
arising out of the use of this information, and as such, any user of this information shall assume
all associated risks.
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 1 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00


A805 Supply of Aggregate - No Option 10 $539,107 564,197 t $0.96
B100 Subgrade Excavation 19 $589,895 19,845 m3 $29.73
B152 Granular Fill (Pit-run) - Des. 6 17 $2,731,173 95,705 t $28.54
B153 Granular Fill - Des. 2 11 $410,654 10,955 t $37.49
B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35
B155 Granular Fill , 6, 125 1 $15,730 500 t $31.46
B175 Granular Fill , 6, 125 1 $42,501 300 m3 $141.67
B180 Preparing Subgrade Surface (First Layer) 20 $1,177,452 705,630 m2 $1.67
B181 Preparing Subgrade Surface (Second Layer) 3 $153,974 121,400 m2 $1.27
B282 Granular Base Course - Des. 2 Cl. 25 29 $24,615,654 784,804 t $31.37
C055 Topsoil and Subsoil Stripping 4 $834,055 163,500 m3 $5.10
C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86
C060 Common Excavation - Civil Projects 3 $992,910 124,000 m3 $8.01
C062 Borrow Area Excavation 2 $3,532,800 640,000 m3 $5.52
C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63
C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68
C065 Impervious Fill Zone 1A 3 $1,445,435 254,500 m3 $5.68
C069 Random Fill Zone 2A 2 $525,550 355,000 m3 $1.48
C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07
C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67
C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00
C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33
C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84
C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26
C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00
C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $135.00
C143 Salvage and Reinstall Existing Riprap 1 $3,900 60 m3 $65.00
C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83
C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45
C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33
C200 Geotextile 3 $15,217 3,960 m2 $3.84
C225 Erosion Control Blanket 1 $3,528 900 m2 $3.92
C230 Drill Seeding 3 $208,800 320,000 m2 $0.65
C232 Hydroseeding 3 $54,540 40,000 m2 $1.36
C248 Temporary Fencing 1 $38,340 2,000 m $19.17
C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03
C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65
C265 Vehicle Access Control Gate 1 $20,800 4 Each $5,200.00
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 22 $250,416 2,248 m $111.40
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 19 $85,061 581 m $146.41
D200 Granular Backfill - Culverts 3 $13,817 170 m3 $81.28
D235 Granular Backfill - Culverts 8 $55,788 998 t $55.90
D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8,181 13 m $629.30
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 3 $67,686 216 m $313.36
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 2 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 21 $1,101,095 3,255 m $338.28
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 13 $722,249 1,285 m $562.06
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 9 $126,092 237 m $532.03
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 3 $37,663 52 m $724.29
D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 2 $8,111 19 m $431.43
D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49,187 28 m $1,756.67
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 4 $425,196 286 m $1,486.70
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 5 $736,722 490 m $1,503.51
D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258,375 235 m $1,099.47
D540 Grouting of Abandoned Culverts 19 $678,133 982 m3 $690.56
D555 Riprap - Random - Supply and Place 1 $11,307 60 m3 $188.45
D607 Filter Material 1 $30,334 140 m3 $216.67
D615 Perforated Pipe 2 $34,567 190 m $181.93
D732 Adjust Manholes 2 $5,333 3 units $1,777.78
D733 Adjust Catch Basins 1 $1,083 1 units $1,083.33
D734 Ajust Water Valve 2 $20,067 12 units $1,672.22
D795 Leads - Supply and Install 1 $8,633 14 m $616.67
D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7,051 10 m $705.11
D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 2 $62,830 98 m $641.12
E003 Misc. Environmental Work 3 $57,514 545 plantings $105.53
E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95
E331 Gabion Mattress - Supply and Install 1 $83,691 450 m2 $185.98
E420 Stone Barrier 1 $65,101 180 m3 $361.67
E435 Geotextile Fence Barrier - Ditch 25 $180,449 11,770 m $15.33
E452 Geotextile - Nonwoven (Supply and Install) 7 $839,295 306,860 m2 $2.74
E453 Geogrid - Supply and Install 1 $1,469 550 m2 $2.67
E454 Geotextile for Materials Separation - Supply and Install 4 $15,334 2,805 m2 $5.47
E456 Geotextile for Stabilization - Supply and Install 8 $178,397 38,940 m2 $4.58
E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04
E505 Soil Covering (Medium Flow) 7 $192,251 67,135 m2 $2.86
E510 Soil Covering (High Flow) 13 $263,482 35,779 m2 $7.36
E515 Synthetic Permeable Ditch Barrier 5 $73,073 4,200 m $17.40
E607 Drill Seeding 7 $44,019 16 ha $2,832.64
E608 Broad-Cast Seeding 12 $140,588 180 ha $782.00
E609 Hydro-Seeding 4 $58,306 6 ha $9,669.27
E610 Slope Texturing 3 $78,464 166,400 m2 $0.47
F169 Haul of Bridge Materials 1 $5,682 1 t.km $5,682.38
F189 Excavation - Channel 1 $6,755 500 m3 $13.51
F195 Backfill - Non-Granular 2 $36,976 500 m3 $73.95
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 2 $87,544 690 m3 $126.87
F203 Backfill - Crushed Granular, 2, 25 3 $58,641 500 m3 $117.28
F495 CSP with Couplers - Supply 1 $38,738 74 m $523.48
F496 CSP - Assembly 2 $63,612 244 m $260.70
F500 Heavy Rock RipRap (Class 1) 20 $947,465 3,996 m3 $237.10
F505 Heavy Rock RipRap (Class 1M) 3 $127,126 450 m3 $282.50
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 3 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

F515 Heavy Rock RipRap (Class 2) 5 $191,481 898 m3 $213.23


F525 Heavy Rock RipRap (Class 3) 3 $859,820 6,180 m3 $139.13
F755 Surface Removal 5 $299,632 13,223 m2 $22.66
F760 Partial Depth Repair 8 $474,133 437 m2 $1,084.97
F765 Full Depth Repair 4 $43,679 24 m2 $1,819.95
F770 Sandblasting (Deck Surface) 3 $59,190 2,675 m2 $22.13
F775 Deck Overlay Concrete 3 $314,967 197 m3 $1,598.82
F776 Placement Deck Overlay Concrete 3 $268,526 2,665 m2 $100.76
F812 Supply of Piling - H-Pile 4 $126,729 881 m $143.85
F814 Supply of Piling - Pipe Pile 3 $101,723 311 m $327.08
F816 Pile Set-up 7 $413,524 156 piles $2,650.79
F818 Pile Driving 7 $213,963 1,903 m $112.43
F820 Loading Tests 3 $32,276 7 tests $4,610.87
F822 Pile Concrete 6 $1,294,645 3,465 m3 $373.63
F824 Drill Rig Set-up 5 $344,033 162 piles $2,123.66
F826 Pile Installation 4 $727,783 3,132 m $232.37
F834 Concrete - Class C 8 $1,116,800 789 m3 $1,415.46
F836 Concrete - Class D 1 $3,439,418 3,550 m3 $968.85
F838 Concrete - Class S 1 $469,735 620 m3 $757.64
F841 Concrete - Class HPC 5 $739,629 324 m3 $2,282.81
F850 Plain Reinforcing Steel - Supply 8 $665,950 409,398 kg $1.63
F854 Reinforcing Steel - Place 11 $2,110,830 796,936 kg $2.65
F974 Deck Waterproofing 4 $158,966 1,977 m2 $80.41
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 7 $768,875 2,535 t $303.30
F982 Asphalt Concrete Pavement - Mix Type M1 (200-300A) 1 $52,083 75 t $694.44
G100 Clearing 6 $25,004 2 ha $12,256.81
G220 Channel Excavation 13 $270,832 41,385 m3 $6.54
G225 Common Excavation 20 $14,523,242 2,493,247 m3 $5.83
G230 Borrow Topsoil Excavation 4 $1,342,487 376,497 m3 $3.57
G235 Borrow Excavation 2 $4,764,944 832,800 m3 $5.72
G236 Borrow Excavation - Contractor's Supply 12 $2,278,156 131,437 m3 $17.33
G239 Overhaul 1 $1,642,816 1,235,200 m3.km $1.33
G248 Common and/or Borrow Excavation Loaded to Trucks 4 $1,542,395 116,350 m3 $13.26
G270 Sideslope Improvement 13 $3,371,070 75 km $44,726.95
G300 Topsoil Placement 20 $1,452,712 1,928,253 m2 $0.75
G320 Topsoil (Supply and Place) 2 $17,133 1,775 m2 $9.65
G452 Remove and Dispose of Existing Fence 10 $76,544 19 km $4,113.04
G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17,894.79
G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00
G475 New Fence - Supply and Install - Class B 9 $169,286 14 km $11,691.03
G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20,867.30
M102 Crack Repair - Spray Patch 5 $764,410 130,255 m $5.87
M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96
Q185 Gravel Surfacing - Des. 4 Cl. 20 4 $49,014 1,510 t $32.46
Q186 Gravel Surfacing - Des. 4 Cl. 25 11 $543,123 13,555 t $40.07
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 4 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

Q510 Asphalt Mix For Others 9 $560,561 9,025 t $62.11


Q560 Cold Milling Asphalt Pavement 3 $668,605 20,543 m3 $32.55
Q565 Cold Milling Asphalt Pavement 20 $3,539,343 1,246,192 m2 $2.84
Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91
Q722 Supply and Place Fog Coat 5 $86,553 101,910 m2 $0.85
Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 3 $2,646,265 747,831 m2 $3.54
Q771 Graded Aggregate Seal Coat - Bridge Decks 3 $79,891 3,805 m2 $21.00
Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 3 $4,512,548 1,183,331 m2 $3.81
Q798 Chip Seal Coat - Bridge Decks 3 $115,671 4,262 m2 $27.14
Q987 Asphalt Concrete Pavement - EPS Mix Type H1 (PG58-34) 1 $4,761,792 50,400 t $94.48
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 17 $88,064,606 1,103,323 t $79.82
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 14 $37,828,722 453,267 t $83.46
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 16 $71,492,708 908,615 t $78.68
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 4 $7,098,713 85,135 t $83.38
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 12 $14,494,627 158,740 t $91.31
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 16 $42,125,869 585,850 t $71.91
S261 Concrete Base - Supply and Install 9 $226,150 141 units $1,603.90
S270 Supply of Signs, 3/4" Plywood 9 $35,182 124 m2 $283.72
S271 Supply of Signs, Extruded Aluminum 9 $162,210 411 m2 $394.62
S272 Supply of Signs, Aluminum 20 $39,415 155 m2 $253.93
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 19 $111,336 352 m2 $316.75
S275 Removal and Reinstallation or Disposal of Existing Signs - One 25 $122,773 592 signs $207.39
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 18 $36,846 77 signs $478.52
S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $933.33
S288 Install Sign - Less than 1 m2 26 $69,015 848 signs $81.39
S289 Install Sign - 1 m2 to 3 m2 16 $35,619 116 signs $307.06
S290 Install Sign - over 3 m2 8 $40,578 53 signs $765.62
S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $675.00
S292 Remove and Dispose - Breakaway Steel Posts 5 $10,229 28 posts $365.31
S309 Pavement Messages - Gore Area 10 $83,800 80 messages $1,047.50
S310 Pavement Messages - Turn Arrow (Single or Double) 11 $32,422 219 messages $148.05
S315 Pavement Messages - Stop Bar 16 $17,271 96 messages $179.91
S320 Pavement Messages - Stop Ahead 5 $3,093 11 messages $281.21
S321 Pavement Messages - STOP 2 $612 3 messages $203.89
S326 Pavement Messages - Railway Crossing 2 $2,400 4 messages $600.00
S327 Pavement Messages - Pedestrian Crossing 2 $724 3 messages $241.45
S341 Durable Pavement Messages - Turn or Straight Arrows (Single 17 $95,404 379 messages $251.72
S342 Durable Pavement Messages - Stop Bar 18 $93,305 132 messages $706.86
S343 Durable Pavement Messages - Railway Crossing 3 $7,572 8 messages $946.48
S344 Durable Pavement Messages - Stop Ahead 6 $11,035 12 messages $919.58
S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14,761 11 messages $1,341.93
S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1,650.00
S347 Durable Pavement Messages - STOP 10 $22,363 50 messages $447.25
S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $877.66
S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $305.46
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 5 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 33 $481,005 571 km $843.09
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 14 $350,204 465 km $752.98
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 14 $19,362 42 km $458.61
S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 2 $3,460 6 km $571.91
S360 Intersection Lines - Supplying Paint and Painting 32 $51,186 261 intersection $196.11
S370 Interchange Lines - Supplying Paint and Painting 4 $50,350 14 interchange $3,596.41
S375 Removal of Existing Painted Lines 2 $3,132 616 m $5.08
S376 Removal of Existing Roadway Lines 2 $72,082 25 km $2,835.63
S400 Underground Electrical Conduit - Supply and Install - Trench Ex 6 $275,830 6,487 m $42.52
S405 Underground Electrical Conduit - Supply and Install - Pushed C 8 $119,464 996 m $119.94
S700 Milled Rumble Strips for Stop Conditions 10 $44,367 21 sets $2,112.72
S706 Milled Rumble Strips 25 $939,158 1,212 km $774.58
S730 Supply and Install Breakaway Steel Posts - W150 X 14 8 $123,486 106 m $1,164.96
S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19,825 19 m $1,043.40
S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38,757 22 m $1,761.67
S765 Cluster Frames - Supply and Install 3 $3,477 7 frames $496.67
S770 Supply and Install - Wooden Post 4 $21,425 111 posts $193.02
S772 Supply and Install Post (100mm X 150mm) 26 $163,746 780 posts $209.93
S775 Removal and Reinstallation or Disposal of Existing Signs 2 $1,826 4 signs $456.48
S800 W-Beam Guardrail - Supply and Install 1 $14,500 75 m $193.33
S805 Strong Post W-Beam Guardrail - Supply and Install 23 $1,952,034 14,029 m $139.15
S815 Cable Barrier - Supply and Install 3 $1,113,500 10,231 m $108.84
S820 Remove, Salvage and Reinstall Existing Guardrail 9 $182,312 1,407 m $129.58
S822 Supply of Guardrail Posts 5 $29,556 298 posts $99.18
S825 Remove and Dispose of Existing Guardrail 30 $1,102,782 37,725 m $29.23
S830 Flexible Guide Post/Delineators - Round - Supply and Install 32 $452,571 5,349 posts $84.61
U100 Trenching and Backfilling 9 $315,379 16,972 m $18.58
U105 Secondary Cable - Supply and Install 10 $506,754 50,921 m $9.95
U110 Removal and Salvage of Existing Standards 2 $5,393 8 units $674.17
U115 Removal and Disposal of Existing Light Fixures 4 $27,697 34 units $814.60
U120 Cast In Place Concrete Base - Supply and Install 6 $420,136 152 units $2,764.05
U125 Street Light Standard - Supply and Install 8 $506,848 186 units $2,724.99
U130 Salvaged Street Light Standard - Install 2 $7,073 8 poles $884.17
U135 Distribution Enclosure - Supply and Install 7 $163,286 13 units $12,560.47
X215 Removing Curb and Gutter 1 $75,201 282 m $266.67
X220 Removing Concrete Surface 1 $1,333 5 m2 $266.67
X225 Removing Manhole 1 $4,667 1 units $4,666.67
X230 Removing Catch Basin 1 $17,333 4 units $4,333.33
X235 Removing Curb 1 $1,800 9 m $200.00
X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50
X325 Curb and Gutter (all heights) 3 $442,434 3,218 m $137.49
X346 Rock Rip-Rap - Hand Laid 2 $14,370 136 m2 $105.66
X350 Solid Concrete Islands 2 $111,065 690 m2 $160.96
X400 Solid Concrete Medians 1 $31,020 99 m2 $313.33
X415 Granular Fill for Medians 2 $51,660 1,280 t $40.36
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 6 of 6
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

X435 Median Asphalt Concrete Surfacing 2 $194,402 1,185 t $164.05


X440 Median Concrete Surfacing 3 $486,553 5,205 m2 $93.48
X510 Cutting of Pavement Edge 25 $360,167 45,609 m $7.90

____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 1 of 4
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 2 $120,951 197,330 t $0.61


B100 Subgrade Excavation 6 $126,936 6,670 m3 $19.03
B152 Granular Fill (Pit-run) - Des. 6 7 $1,105,338 51,515 t $21.46
B153 Granular Fill - Des. 2 2 $10,462 265 t $39.48
B155 Granular Fill , 6, 125 1 $15,730 500 t $31.46
B180 Preparing Subgrade Surface (First Layer) 1 $14,820 11,060 m2 $1.34
B282 Granular Base Course - Des. 2 Cl. 25 8 $1,028,420 39,840 t $25.81
C055 Topsoil and Subsoil Stripping 4 $834,055 163,500 m3 $5.10
C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86
C060 Common Excavation - Civil Projects 3 $992,910 124,000 m3 $8.01
C062 Borrow Area Excavation 2 $3,532,800 640,000 m3 $5.52
C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63
C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68
C065 Impervious Fill Zone 1A 3 $1,445,435 254,500 m3 $5.68
C069 Random Fill Zone 2A 2 $525,550 355,000 m3 $1.48
C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07
C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67
C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00
C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33
C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84
C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26
C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00
C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $135.00
C143 Salvage and Reinstall Existing Riprap 1 $3,900 60 m3 $65.00
C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83
C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45
C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33
C200 Geotextile 3 $15,217 3,960 m2 $3.84
C230 Drill Seeding 3 $208,800 320,000 m2 $0.65
C232 Hydroseeding 3 $54,540 40,000 m2 $1.36
C248 Temporary Fencing 1 $38,340 2,000 m $19.17
C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03
C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65
C265 Vehicle Access Control Gate 1 $20,800 4 Each $5,200.00
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $20,334 193 m $105.36
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 4 $15,040 122 m $123.28
D200 Granular Backfill - Culverts 2 $12,983 150 m3 $86.56
D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8,181 13 m $629.30
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 2 $57,519 196 m $293.46
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $75,784 222 m $341.37
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 2 $41,549 87 m $477.57
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $26,955 61 m $441.88
D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $2,386 4 m $627.83
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 2 $134,452 68 m $1,977.24
D540 Grouting of Abandoned Culverts 5 $122,837 169 m3 $726.84
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 2 of 4
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

D555 Riprap - Random - Supply and Place 1 $11,307 60 m3 $188.45


D734 Ajust Water Valve 1 $1,917 1 units $1,916.67
D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7,051 10 m $705.11
D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $17,950 30 m $598.33
E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95
E435 Geotextile Fence Barrier - Ditch 8 $88,488 6,075 m $14.57
E454 Geotextile for Materials Separation - Supply and Install 2 $1,876 405 m2 $4.63
E456 Geotextile for Stabilization - Supply and Install 2 $29,268 5,350 m2 $5.47
E505 Soil Covering (Medium Flow) 1 $8,145 500 m2 $16.29
E510 Soil Covering (High Flow) 1 $64,416 9,600 m2 $6.71
E607 Drill Seeding 3 $21,089 6 ha $3,739.22
E609 Hydro-Seeding 2 $26,310 1 ha $23,283.08
F203 Backfill - Crushed Granular, 2, 25 1 $22,950 150 m3 $153.00
F495 CSP with Couplers - Supply 1 $38,738 74 m $523.48
F496 CSP - Assembly 2 $63,612 244 m $260.70
F500 Heavy Rock RipRap (Class 1) 2 $19,582 105 m3 $186.50
F505 Heavy Rock RipRap (Class 1M) 2 $69,178 377 m3 $183.50
F515 Heavy Rock RipRap (Class 2) 2 $114,820 518 m3 $221.66
F525 Heavy Rock RipRap (Class 3) 1 $99,682 480 m3 $207.67
F755 Surface Removal 1 $14,756 228 m2 $64.72
F760 Partial Depth Repair 1 $172,869 116 m2 $1,490.25
F765 Full Depth Repair 1 $10,574 4 m2 $2,643.45
F812 Supply of Piling - H-Pile 2 $62,872 412 m $152.60
F814 Supply of Piling - Pipe Pile 1 $12,823 30 m $427.44
F816 Pile Set-up 2 $125,584 56 piles $2,242.57
F818 Pile Driving 2 $99,935 575 m $173.80
F820 Loading Tests 2 $14,898 2 tests $7,449.17
F822 Pile Concrete 2 $20,241 31 m3 $652.94
F824 Drill Rig Set-up 2 $134,724 24 piles $5,613.49
F826 Pile Installation 2 $96,850 177 m $547.18
F834 Concrete - Class C 2 $49,737 43 m3 $1,156.67
F836 Concrete - Class D 1 $3,439,418 3,550 m3 $968.85
F838 Concrete - Class S 1 $469,735 620 m3 $757.64
F850 Plain Reinforcing Steel - Supply 2 $11,982 3,511 kg $3.41
F854 Reinforcing Steel - Place 3 $1,541,095 324,011 kg $4.76
F974 Deck Waterproofing 1 $30,499 366 m2 $83.33
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 2 $94,645 191 t $495.52
G220 Channel Excavation 2 $18,897 1,530 m3 $12.35
G225 Common Excavation 4 $517,001 35,930 m3 $14.39
G230 Borrow Topsoil Excavation 1 $4,305 350 m3 $12.30
G235 Borrow Excavation 1 $46,000 2,000 m3 $23.00
G236 Borrow Excavation - Contractor's Supply 2 $83,558 3,550 m3 $23.54
G248 Common and/or Borrow Excavation Loaded to Trucks 1 $52,272 4,800 m3 $10.89
G270 Sideslope Improvement 5 $711,653 22 km $32,916.44
G300 Topsoil Placement 4 $93,893 62,100 m2 $1.51
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 3 of 4
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

G320 Topsoil (Supply and Place) 1 $14,677 1,300 m2 $11.29


M102 Crack Repair - Spray Patch 2 $62,655 9,255 m $6.77
Q185 Gravel Surfacing - Des. 4 Cl. 20 1 $3,503 50 t $70.06
Q186 Gravel Surfacing - Des. 4 Cl. 25 3 $21,116 545 t $38.74
Q510 Asphalt Mix For Others 3 $157,010 3,000 t $52.34
Q565 Cold Milling Asphalt Pavement 4 $178,298 43,841 m2 $4.07
Q722 Supply and Place Fog Coat 5 $86,553 101,910 m2 $0.85
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 6 $36,973,490 534,280 t $69.20
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 2 $2,240,402 30,600 t $73.22
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 1 $4,447,328 65,450 t $67.95
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 2 $2,518,760 33,425 t $75.36
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 4 $4,602,755 54,540 t $84.39
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 4 $8,053,489 132,550 t $60.76
S261 Concrete Base - Supply and Install 1 $43,377 22 units $1,971.67
S270 Supply of Signs, 3/4" Plywood 1 $2,352 6 m2 $408.33
S271 Supply of Signs, Extruded Aluminum 1 $53,905 133 m2 $406.68
S272 Supply of Signs, Aluminum 5 $7,327 29 m2 $254.06
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $6,146 21 m2 $295.75
S275 Removal and Reinstallation or Disposal of Existing Signs - One 5 $40,294 107 signs $376.58
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $11,698 16 signs $731.12
S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $933.33
S288 Install Sign - Less than 1 m2 5 $10,592 99 signs $106.99
S289 Install Sign - 1 m2 to 3 m2 2 $5,707 17 signs $335.68
S290 Install Sign - over 3 m2 1 $6,050 6 signs $1,008.33
S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $675.00
S292 Remove and Dispose - Breakaway Steel Posts 1 $6,160 14 posts $440.00
S309 Pavement Messages - Gore Area 4 $45,297 42 messages $1,078.49
S341 Durable Pavement Messages - Turn or Straight Arrows (Single 7 $35,167 154 messages $228.36
S342 Durable Pavement Messages - Stop Bar 8 $28,057 45 messages $623.49
S343 Durable Pavement Messages - Railway Crossing 1 $1,738 2 messages $869.24
S344 Durable Pavement Messages - Stop Ahead 3 $6,205 7 messages $886.42
S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14,761 11 messages $1,341.93
S347 Durable Pavement Messages - STOP 7 $19,686 44 messages $447.41
S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $877.66
S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $305.46
S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 9 $59,178 66 km $894.74
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 5 $115,653 149 km $773.96
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $3,938 11 km $346.63
S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 1 $1,202 2 km $534.31
S360 Intersection Lines - Supplying Paint and Painting 8 $13,919 65 intersection $214.14
S370 Interchange Lines - Supplying Paint and Painting 3 $39,173 11 interchange $3,561.17
S375 Removal of Existing Painted Lines 2 $3,132 616 m $5.08
S376 Removal of Existing Roadway Lines 1 $2,415 0 km $5,750.00
S400 Underground Electrical Conduit - Supply and Install - Trench Ex 2 $1,862 32 m $58.19
S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $12,959 150 m $86.39
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 4 of 4
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S700 Milled Rumble Strips for Stop Conditions 3 $12,125 5 sets $2,425.10
S706 Milled Rumble Strips 7 $257,444 337 km $763.97
S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38,757 22 m $1,761.67
S772 Supply and Install Post (100mm X 150mm) 5 $24,930 122 posts $204.35
S775 Removal and Reinstallation or Disposal of Existing Signs 1 $763 2 signs $381.28
S800 W-Beam Guardrail - Supply and Install 1 $14,500 75 m $193.33
S805 Strong Post W-Beam Guardrail - Supply and Install 7 $988,999 8,214 m $120.41
S820 Remove, Salvage and Reinstall Existing Guardrail 4 $54,530 496 m $109.94
S822 Supply of Guardrail Posts 2 $1,764 22 posts $80.18
S825 Remove and Dispose of Existing Guardrail 8 $367,072 11,491 m $31.94
S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $83,764 984 posts $85.13
U100 Trenching and Backfilling 2 $29,452 1,257 m $23.43
U105 Secondary Cable - Supply and Install 2 $26,757 2,645 m $10.12
U110 Removal and Salvage of Existing Standards 1 $2,143 2 units $1,071.67
U115 Removal and Disposal of Existing Light Fixures 1 $4,700 6 units $783.33
U120 Cast In Place Concrete Base - Supply and Install 1 $4,000 2 units $2,000.00
U125 Street Light Standard - Supply and Install 1 $65,303 16 units $4,081.43
U130 Salvaged Street Light Standard - Install 1 $2,143 2 poles $1,071.67
U135 Distribution Enclosure - Supply and Install 1 $12,700 1 units $12,700.00
X325 Curb and Gutter (all heights) 1 $237,518 1,765 m $134.57
X350 Solid Concrete Islands 1 $6,785 30 m2 $226.17
X415 Granular Fill for Medians 1 $18,636 650 t $28.67
X440 Median Concrete Surfacing 1 $143,948 1,400 m2 $102.82
X510 Cutting of Pavement Edge 8 $92,780 15,209 m $6.10

____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00


A805 Supply of Aggregate - No Option 2 $103,586 129,365 t $0.80
B100 Subgrade Excavation 1 $3,322 45 m3 $73.83
B152 Granular Fill (Pit-run) - Des. 6 3 $219,066 7,550 t $29.02
B153 Granular Fill - Des. 2 1 $32,563 970 t $33.57
B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35
B175 Granular Fill , 6, 125 1 $42,501 300 m3 $141.67
B180 Preparing Subgrade Surface (First Layer) 6 $115,937 77,820 m2 $1.49
B181 Preparing Subgrade Surface (Second Layer) 1 $11,055 16,500 m2 $0.67
B282 Granular Base Course - Des. 2 Cl. 25 6 $3,065,306 91,318 t $33.57
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $87,427 838 m $104.33
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16,186 106 m $152.69
D235 Granular Backfill - Culverts 3 $18,226 333 t $54.73
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $384,949 1,136 m $338.86
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $58,893 103 m $571.78
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $37,967 98 m $387.42
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 1 $7,000 6 m $1,166.67
D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $5,725 15 m $381.67
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $163,500 109 m $1,500.00
D540 Grouting of Abandoned Culverts 4 $71,059 135 m3 $526.36
D732 Adjust Manholes 1 $4,167 2 units $2,083.33
D734 Ajust Water Valve 1 $18,150 11 units $1,650.00
E003 Misc. Environmental Work 3 $57,514 545 plantings $105.53
E331 Gabion Mattress - Supply and Install 1 $83,691 450 m2 $185.98
E435 Geotextile Fence Barrier - Ditch 9 $42,015 2,660 m $15.80
E452 Geotextile - Nonwoven (Supply and Install) 2 $38,909 10,950 m2 $3.55
E453 Geogrid - Supply and Install 1 $1,469 550 m2 $2.67
E456 Geotextile for Stabilization - Supply and Install 2 $87,903 21,140 m2 $4.16
E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04
E505 Soil Covering (Medium Flow) 2 $9,705 4,550 m2 $2.13
E510 Soil Covering (High Flow) 4 $21,261 2,244 m2 $9.47
E607 Drill Seeding 2 $18,700 7 ha $2,671.43
E608 Broad-Cast Seeding 5 $22,630 12 ha $1,813.32
E609 Hydro-Seeding 1 $14,233 2 ha $7,116.67
E610 Slope Texturing 1 $14,444 31,400 m2 $0.46
F169 Haul of Bridge Materials 1 $5,682 1 t.km $5,682.38
F189 Excavation - Channel 1 $6,755 500 m3 $13.51
F195 Backfill - Non-Granular 2 $36,976 500 m3 $73.95
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 1 $54,968 400 m3 $137.42
F203 Backfill - Crushed Granular, 2, 25 2 $35,691 350 m3 $101.97
F500 Heavy Rock RipRap (Class 1) 7 $305,893 1,395 m3 $219.28
F505 Heavy Rock RipRap (Class 1M) 1 $57,948 73 m3 $793.81
F525 Heavy Rock RipRap (Class 3) 2 $760,138 5,700 m3 $133.36
F755 Surface Removal 1 $31,041 670 m2 $46.33
F760 Partial Depth Repair 4 $113,337 118 m2 $960.48
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

F765 Full Depth Repair 1 $9,908 5 m2 $1,981.67


F770 Sandblasting (Deck Surface) 1 $12,951 670 m2 $19.33
F775 Deck Overlay Concrete 1 $63,617 55 m3 $1,156.67
F776 Placement Deck Overlay Concrete 1 $93,351 670 m2 $139.33
F816 Pile Set-up 1 $5,020 40 piles $125.50
F818 Pile Driving 1 $26,364 409 m $64.46
F820 Loading Tests 1 $17,378 5 tests $3,475.55
F834 Concrete - Class C 1 $27,501 13 m3 $2,115.43
F854 Reinforcing Steel - Place 1 $2,779 1,570 kg $1.77
F974 Deck Waterproofing 1 $22,506 330 m2 $68.20
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 1 $213,410 964 t $221.38
F982 Asphalt Concrete Pavement - Mix Type M1 (200-300A) 1 $52,083 75 t $694.44
G100 Clearing 1 $4,571 0 ha $114,264.00
G220 Channel Excavation 4 $29,541 2,555 m3 $11.56
G225 Common Excavation 7 $1,546,856 160,080 m3 $9.66
G230 Borrow Topsoil Excavation 1 $98,315 26,500 m3 $3.71
G236 Borrow Excavation - Contractor's Supply 4 $833,309 43,127 m3 $19.32
G248 Common and/or Borrow Excavation Loaded to Trucks 1 $1,065,750 87,000 m3 $12.25
G270 Sideslope Improvement 1 $439,267 11 km $39,933.33
G300 Topsoil Placement 7 $250,828 179,003 m2 $1.40
G452 Remove and Dispose of Existing Fence 7 $17,195 4 km $4,287.96
G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17,894.79
G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00
G475 New Fence - Supply and Install - Class B 6 $69,166 5 km $14,469.85
G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20,867.30
Q185 Gravel Surfacing - Des. 4 Cl. 20 1 $6,726 200 t $33.63
Q186 Gravel Surfacing - Des. 4 Cl. 25 1 $55,539 1,700 t $32.67
Q560 Cold Milling Asphalt Pavement 1 $154,000 3,500 m3 $44.00
Q565 Cold Milling Asphalt Pavement 4 $465,734 204,700 m2 $2.28
Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 3 $5,832,218 72,470 t $80.48
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 4 $13,150,358 157,220 t $83.64
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 3 $12,365,876 172,880 t $71.53
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,025,051 27,410 t $73.88
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 1 $497,988 5,800 t $85.86
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 6 $15,704,840 225,250 t $69.72
S261 Concrete Base - Supply and Install 4 $69,866 51 units $1,369.93
S270 Supply of Signs, 3/4" Plywood 3 $2,825 13 m2 $217.28
S271 Supply of Signs, Extruded Aluminum 3 $68,386 183 m2 $374.10
S272 Supply of Signs, Aluminum 5 $7,545 41 m2 $184.47
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $43,818 147 m2 $297.27
S275 Removal and Reinstallation or Disposal of Existing Signs - One 6 $19,389 111 signs $174.68
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $9,408 25 signs $376.31
S288 Install Sign - Less than 1 m2 6 $14,751 200 signs $73.75
S289 Install Sign - 1 m2 to 3 m2 5 $6,153 23 signs $267.51
____________________________________________________________________________________________________
Tender Administration Section
10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S290 Install Sign - over 3 m2 3 $17,966 27 signs $665.40


S292 Remove and Dispose - Breakaway Steel Posts 2 $1,053 6 posts $175.42
S309 Pavement Messages - Gore Area 1 $1,970 2 messages $985.00
S310 Pavement Messages - Turn Arrow (Single or Double) 1 $8,417 50 messages $168.33
S315 Pavement Messages - Stop Bar 3 $3,213 19 messages $169.12
S320 Pavement Messages - Stop Ahead 3 $2,072 8 messages $258.96
S321 Pavement Messages - STOP 2 $612 3 messages $203.89
S341 Durable Pavement Messages - Turn or Straight Arrows (Single 5 $25,491 76 messages $335.41
S342 Durable Pavement Messages - Stop Bar 4 $13,303 22 messages $604.70
S343 Durable Pavement Messages - Railway Crossing 1 $3,600 4 messages $900.00
S344 Durable Pavement Messages - Stop Ahead 1 $2,880 3 messages $960.00
S347 Durable Pavement Messages - STOP 1 $953 2 messages $476.67
S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 5 $56,002 70 km $801.17
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $60,133 82 km $733.33
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 1 $1,625 5 km $325.00
S360 Intersection Lines - Supplying Paint and Painting 5 $11,750 58 intersection $202.58
S400 Underground Electrical Conduit - Supply and Install - Trench Ex 3 $18,523 260 m $71.24
S405 Underground Electrical Conduit - Supply and Install - Pushed C 4 $49,899 505 m $98.81
S700 Milled Rumble Strips for Stop Conditions 4 $21,542 11 sets $1,958.33
S706 Milled Rumble Strips 4 $145,250 195 km $746.79
S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $40,009 32 m $1,250.29
S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19,825 19 m $1,043.40
S765 Cluster Frames - Supply and Install 1 $683 1 frames $683.33
S772 Supply and Install Post (100mm X 150mm) 6 $38,766 183 posts $211.84
S805 Strong Post W-Beam Guardrail - Supply and Install 4 $176,125 1,194 m $147.51
S815 Cable Barrier - Supply and Install 1 $43,501 180 m $241.67
S825 Remove and Dispose of Existing Guardrail 7 $232,529 6,796 m $34.22
S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $96,734 1,310 posts $73.84
U100 Trenching and Backfilling 4 $75,125 5,015 m $14.98
U105 Secondary Cable - Supply and Install 5 $130,740 6,917 m $18.90
U110 Removal and Salvage of Existing Standards 1 $3,250 6 units $541.67
U115 Removal and Disposal of Existing Light Fixures 3 $22,997 28 units $821.31
U120 Cast In Place Concrete Base - Supply and Install 3 $121,113 57 units $2,124.79
U125 Street Light Standard - Supply and Install 4 $202,406 78 units $2,594.95
U130 Salvaged Street Light Standard - Install 1 $4,930 6 poles $821.67
U135 Distribution Enclosure - Supply and Install 4 $68,768 6 units $11,461.33
X235 Removing Curb 1 $1,800 9 m $200.00
X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50
X325 Curb and Gutter (all heights) 1 $139,380 1,000 m $139.38
X346 Rock Rip-Rap - Hand Laid 1 $9,870 126 m2 $78.33
X350 Solid Concrete Islands 1 $104,280 660 m2 $158.00
X400 Solid Concrete Medians 1 $31,020 99 m2 $313.33
X435 Median Asphalt Concrete Surfacing 1 $139,500 900 t $155.00
X440 Median Concrete Surfacing 1 $341,582 3,800 m2 $89.89
X510 Cutting of Pavement Edge 5 $90,480 12,410 m $7.29
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 3 $126,380 223,930 t $0.56


B100 Subgrade Excavation 5 $224,223 8,490 m3 $26.41
B152 Granular Fill (Pit-run) - Des. 6 4 $327,493 10,500 t $31.19
B153 Granular Fill - Des. 2 3 $183,333 5,570 t $32.91
B180 Preparing Subgrade Surface (First Layer) 4 $46,437 15,250 m2 $3.05
B282 Granular Base Course - Des. 2 Cl. 25 4 $251,304 8,780 t $28.62
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $32,594 182 m $179.09
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 3 $20,834 64 m $325.52
D235 Granular Backfill - Culverts 1 $7,149 165 t $43.33
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 1 $10,167 20 m $508.33
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 3 $79,707 169 m $471.64
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $37,400 55 m $680.00
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $34,000 36 m $944.45
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 2 $338,772 219 m $1,546.91
D540 Grouting of Abandoned Culverts 4 $181,300 240 m3 $755.42
D607 Filter Material 1 $30,334 140 m3 $216.67
D615 Perforated Pipe 1 $29,200 120 m $243.33
D732 Adjust Manholes 1 $1,167 1 units $1,166.67
D733 Adjust Catch Basins 1 $1,083 1 units $1,083.33
D795 Leads - Supply and Install 1 $8,633 14 m $616.67
D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $44,880 68 m $660.00
E435 Geotextile Fence Barrier - Ditch 1 $567 20 m $28.33
E454 Geotextile for Materials Separation - Supply and Install 1 $4,923 900 m2 $5.47
E456 Geotextile for Stabilization - Supply and Install 3 $15,342 2,950 m2 $5.20
E505 Soil Covering (Medium Flow) 1 $11,997 900 m2 $13.33
E510 Soil Covering (High Flow) 3 $25,410 2,705 m2 $9.39
E607 Drill Seeding 1 $1,000 1 ha $1,000.00
F500 Heavy Rock RipRap (Class 1) 3 $118,315 443 m3 $267.08
F515 Heavy Rock RipRap (Class 2) 2 $52,974 260 m3 $203.75
F755 Surface Removal 2 $195,692 11,813 m2 $16.57
F760 Partial Depth Repair 2 $167,696 150 m2 $1,117.97
F765 Full Depth Repair 1 $15,367 10 m2 $1,536.67
F770 Sandblasting (Deck Surface) 1 $34,832 1,493 m2 $23.33
F775 Deck Overlay Concrete 1 $125,033 97 m3 $1,289.00
F776 Placement Deck Overlay Concrete 1 $121,426 1,493 m2 $81.33
F834 Concrete - Class C 1 $344,491 146 m3 $2,359.53
F841 Concrete - Class HPC 1 $96,300 50 m3 $1,926.00
F850 Plain Reinforcing Steel - Supply 1 $3,292 1,799 kg $1.83
F854 Reinforcing Steel - Place 2 $34,837 17,920 kg $1.94
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 2 $363,399 1,239 t $293.30
G100 Clearing 1 $0 0 ha $0.00
G225 Common Excavation 1 $58,000 5,800 m3 $10.00
G236 Borrow Excavation - Contractor's Supply 1 $243,000 13,500 m3 $18.00
G270 Sideslope Improvement 4 $1,760,000 18 km $97,777.78
G300 Topsoil Placement 1 $26,000 13,000 m2 $2.00
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

G320 Topsoil (Supply and Place) 1 $2,456 475 m2 $5.17


G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00
G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00
M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96
Q185 Gravel Surfacing - Des. 4 Cl. 20 1 $25,080 760 t $33.00
Q186 Gravel Surfacing - Des. 4 Cl. 25 1 $18,399 790 t $23.29
Q510 Asphalt Mix For Others 1 $28,445 500 t $56.89
Q560 Cold Milling Asphalt Pavement 2 $514,605 17,043 m3 $30.19
Q565 Cold Milling Asphalt Pavement 2 $702,828 281,730 m2 $2.49
Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 2 $915,368 299,412 m2 $3.06
Q771 Graded Aggregate Seal Coat - Bridge Decks 2 $18,625 966 m2 $19.28
Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 2 $1,926,729 567,660 m2 $3.39
Q798 Chip Seal Coat - Bridge Decks 2 $32,714 876 m2 $37.34
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 4 $16,664,758 186,523 t $89.34
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 3 $12,939,474 163,097 t $79.34
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 5 $14,535,728 180,620 t $80.48
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $2,198,366 25,100 t $87.58
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 2 $1,747,907 20,900 t $83.63
S261 Concrete Base - Supply and Install 1 $2,967 2 units $1,483.33
S271 Supply of Signs, Extruded Aluminum 1 $1,260 3 m2 $420.00
S272 Supply of Signs, Aluminum 3 $2,928 7 m2 $418.33
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 3 $3,856 12 m2 $321.30
S275 Removal and Reinstallation or Disposal of Existing Signs - One 3 $10,575 55 signs $192.27
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 3 $1,900 4 signs $475.00
S288 Install Sign - Less than 1 m2 5 $3,683 42 signs $87.69
S289 Install Sign - 1 m2 to 3 m2 1 $1,000 2 signs $500.00
S290 Install Sign - over 3 m2 1 $485 1 signs $485.00
S309 Pavement Messages - Gore Area 2 $20,675 23 messages $898.91
S310 Pavement Messages - Turn Arrow (Single or Double) 4 $12,641 88 messages $143.64
S315 Pavement Messages - Stop Bar 5 $3,839 14 messages $274.23
S326 Pavement Messages - Railway Crossing 1 $1,433 2 messages $716.67
S327 Pavement Messages - Pedestrian Crossing 1 $518 2 messages $258.84
S341 Durable Pavement Messages - Turn or Straight Arrows (Single 3 $26,812 115 messages $233.15
S342 Durable Pavement Messages - Stop Bar 3 $40,303 45 messages $895.62
S344 Durable Pavement Messages - Stop Ahead 1 $867 1 messages $866.67
S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1,650.00
S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 7 $107,544 147 km $731.39
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $62,367 85 km $736.67
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $8,846 16 km $564.88
S360 Intersection Lines - Supplying Paint and Painting 8 $11,200 51 intersection $219.60
S370 Interchange Lines - Supplying Paint and Painting 1 $11,177 3 interchange $3,725.62
S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $4,078 40 m $101.96
S700 Milled Rumble Strips for Stop Conditions 1 $2,500 1 sets $2,500.00
S706 Milled Rumble Strips 5 $149,329 200 km $746.64
S730 Supply and Install Breakaway Steel Posts - W150 X 14 1 $2,030 2 m $1,015.00
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S772 Supply and Install Post (100mm X 150mm) 4 $8,231 30 posts $274.38
S805 Strong Post W-Beam Guardrail - Supply and Install 3 $333,824 2,204 m $151.46
S815 Cable Barrier - Supply and Install 2 $1,070,000 10,051 m $106.46
S820 Remove, Salvage and Reinstall Existing Guardrail 2 $111,988 802 m $139.64
S822 Supply of Guardrail Posts 1 $24,807 244 posts $101.67
S825 Remove and Dispose of Existing Guardrail 3 $321,623 14,187 m $22.67
S830 Flexible Guide Post/Delineators - Round - Supply and Install 6 $64,769 659 posts $98.28
U100 Trenching and Backfilling 1 $4,794 155 m $30.93
U105 Secondary Cable - Supply and Install 1 $2,735 235 m $11.64
U125 Street Light Standard - Supply and Install 1 $8,882 3 units $2,960.56
U135 Distribution Enclosure - Supply and Install 1 $10,028 1 units $10,028.35
X215 Removing Curb and Gutter 1 $75,201 282 m $266.67
X220 Removing Concrete Surface 1 $1,333 5 m2 $266.67
X225 Removing Manhole 1 $4,667 1 units $4,666.67
X230 Removing Catch Basin 1 $17,333 4 units $4,333.33
X325 Curb and Gutter (all heights) 1 $65,536 453 m $144.67
X415 Granular Fill for Medians 1 $33,025 630 t $52.42
X435 Median Asphalt Concrete Surfacing 1 $54,902 285 t $192.64
X440 Median Concrete Surfacing 1 $1,023 5 m2 $204.67
X510 Cutting of Pavement Edge 3 $16,704 1,780 m $9.38

____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 3 $188,190 13,572 t $13.87


B100 Subgrade Excavation 6 $205,648 3,540 m3 $58.09
B152 Granular Fill (Pit-run) - Des. 6 2 $58,920 1,440 t $40.92
B153 Granular Fill - Des. 2 5 $184,296 4,150 t $44.41
B180 Preparing Subgrade Surface (First Layer) 7 $478,938 275,000 m2 $1.74
B181 Preparing Subgrade Surface (Second Layer) 1 $77,550 55,000 m2 $1.41
B282 Granular Base Course - Des. 2 Cl. 25 9 $4,673,877 198,816 t $23.51
C225 Erosion Control Blanket 1 $3,528 900 m2 $3.92
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $63,611 580 m $109.67
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16,949 145 m $116.89
D200 Granular Backfill - Culverts 1 $833 20 m3 $41.67
D235 Granular Backfill - Culverts 2 $5,814 170 t $34.20
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $190,712 584 m $326.56
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $99,673 230 m $433.36
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $16,320 32 m $510.00
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 2 $30,663 46 m $666.59
D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49,187 28 m $1,756.67
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 1 $26,130 39 m $670.00
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $230,100 236 m $975.00
D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258,375 235 m $1,099.47
D540 Grouting of Abandoned Culverts 4 $206,004 318 m3 $647.81
D615 Perforated Pipe 1 $5,367 70 m $76.67
E435 Geotextile Fence Barrier - Ditch 5 $23,328 1,395 m $16.72
E452 Geotextile - Nonwoven (Supply and Install) 3 $5,588 900 m2 $6.21
E454 Geotextile for Materials Separation - Supply and Install 1 $8,535 1,500 m2 $5.69
E505 Soil Covering (Medium Flow) 2 $18,825 1,855 m2 $10.15
E510 Soil Covering (High Flow) 4 $35,211 2,920 m2 $12.06
E515 Synthetic Permeable Ditch Barrier 3 $22,856 970 m $23.56
E608 Broad-Cast Seeding 5 $12,299 11 ha $1,088.41
E610 Slope Texturing 1 $5,600 8,000 m2 $0.70
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 1 $32,576 290 m3 $112.33
F500 Heavy Rock RipRap (Class 1) 7 $419,176 1,793 m3 $233.78
F515 Heavy Rock RipRap (Class 2) 1 $23,687 120 m3 $197.39
F755 Surface Removal 1 $58,143 512 m2 $113.56
F760 Partial Depth Repair 1 $20,231 53 m2 $381.72
F765 Full Depth Repair 1 $7,830 5 m2 $1,565.98
F770 Sandblasting (Deck Surface) 1 $11,407 512 m2 $22.28
F775 Deck Overlay Concrete 1 $126,317 45 m3 $2,807.04
F776 Placement Deck Overlay Concrete 1 $53,749 502 m2 $107.07
F812 Supply of Piling - H-Pile 2 $63,857 469 m $136.16
F814 Supply of Piling - Pipe Pile 2 $88,900 281 m $316.37
F816 Pile Set-up 4 $282,920 60 piles $4,715.33
F818 Pile Driving 4 $87,663 919 m $95.39
F822 Pile Concrete 4 $1,274,404 3,434 m3 $371.11
F824 Drill Rig Set-up 3 $209,310 138 piles $1,516.74
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

F826 Pile Installation 2 $630,932 2,955 m $213.51


F834 Concrete - Class C 4 $695,072 587 m3 $1,184.11
F841 Concrete - Class HPC 4 $643,329 274 m3 $2,347.92
F850 Plain Reinforcing Steel - Supply 5 $650,676 404,088 kg $1.61
F854 Reinforcing Steel - Place 5 $532,119 453,435 kg $1.17
F974 Deck Waterproofing 2 $105,961 1,281 m2 $82.72
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 2 $97,420 141 t $690.92
G100 Clearing 3 $20,433 2 ha $10,216.67
G220 Channel Excavation 5 $6,168 640 m3 $9.64
G225 Common Excavation 5 $736,970 90,417 m3 $8.15
G230 Borrow Topsoil Excavation 1 $12,584 987 m3 $12.75
G236 Borrow Excavation - Contractor's Supply 3 $708,644 48,290 m3 $14.67
G248 Common and/or Borrow Excavation Loaded to Trucks 2 $424,373 24,550 m3 $17.29
G270 Sideslope Improvement 2 $199,750 4 km $53,266.67
G300 Topsoil Placement 5 $150,417 103,180 m2 $1.46
G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00
G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00
M102 Crack Repair - Spray Patch 2 $567,555 93,500 m $6.07
Q185 Gravel Surfacing - Des. 4 Cl. 20 1 $13,705 500 t $27.41
Q186 Gravel Surfacing - Des. 4 Cl. 25 3 $43,192 1,170 t $36.92
Q510 Asphalt Mix For Others 5 $375,106 5,525 t $67.89
Q565 Cold Milling Asphalt Pavement 7 $1,103,803 459,921 m2 $2.40
Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 1 $1,730,897 448,419 m2 $3.86
Q771 Graded Aggregate Seal Coat - Bridge Decks 1 $61,266 2,839 m2 $21.58
Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 1 $2,585,818 615,671 m2 $4.20
Q798 Chip Seal Coat - Bridge Decks 1 $82,957 3,386 m2 $24.50
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 1 $6,473,447 87,550 t $73.94
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 5 $9,498,489 102,350 t $92.80
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 6 $33,409,568 406,465 t $82.20
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,554,902 24,300 t $105.14
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 3 $3,635,176 40,000 t $90.88
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 1 $7,009,384 101,600 t $68.99
S261 Concrete Base - Supply and Install 2 $9,020 8 units $1,127.50
S270 Supply of Signs, 3/4" Plywood 3 $5,982 18 m2 $324.43
S271 Supply of Signs, Extruded Aluminum 3 $12,341 34 m2 $362.98
S272 Supply of Signs, Aluminum 6 $12,355 44 m2 $283.50
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 7 $27,371 81 m2 $336.17
S275 Removal and Reinstallation or Disposal of Existing Signs - One 8 $43,443 271 signs $160.30
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 5 $7,580 20 signs $379.02
S288 Install Sign - Less than 1 m2 9 $22,670 264 signs $85.87
S289 Install Sign - 1 m2 to 3 m2 5 $4,535 15 signs $302.35
S290 Install Sign - over 3 m2 2 $3,850 5 signs $770.07
S292 Remove and Dispose - Breakaway Steel Posts 1 $1,200 4 posts $300.00
S309 Pavement Messages - Gore Area 1 $9,042 7 messages $1,291.67
S310 Pavement Messages - Turn Arrow (Single or Double) 3 $6,967 40 messages $174.17
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S315 Pavement Messages - Stop Bar 4 $7,727 44 messages $175.61


S320 Pavement Messages - Stop Ahead 2 $1,022 3 messages $340.55
S326 Pavement Messages - Railway Crossing 1 $967 2 messages $483.33
S341 Durable Pavement Messages - Turn or Straight Arrows (Single 2 $7,933 34 messages $233.33
S342 Durable Pavement Messages - Stop Bar 3 $11,642 20 messages $582.08
S343 Durable Pavement Messages - Railway Crossing 1 $2,233 2 messages $1,116.67
S344 Durable Pavement Messages - Stop Ahead 1 $1,083 1 messages $1,083.33
S347 Durable Pavement Messages - STOP 2 $1,723 4 messages $430.83
S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 9 $184,109 198 km $931.49
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 3 $63,028 90 km $700.31
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 2 $3,012 4 km $752.92
S360 Intersection Lines - Supplying Paint and Painting 7 $11,940 72 intersection $165.83
S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $5,893 45 m $130.95
S700 Milled Rumble Strips for Stop Conditions 2 $8,200 4 sets $2,050.00
S706 Milled Rumble Strips 6 $246,567 351 km $702.07
S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $13,683 14 m $977.38
S765 Cluster Frames - Supply and Install 1 $2,067 4 frames $516.67
S770 Supply and Install - Wooden Post 2 $19,767 106 posts $186.48
S772 Supply and Install Post (100mm X 150mm) 10 $47,745 225 posts $212.20
S775 Removal and Reinstallation or Disposal of Existing Signs 1 $1,063 2 signs $531.67
S805 Strong Post W-Beam Guardrail - Supply and Install 8 $387,338 2,017 m $192.04
S820 Remove, Salvage and Reinstall Existing Guardrail 2 $12,091 92 m $131.42
S822 Supply of Guardrail Posts 1 $1,212 20 posts $60.62
S825 Remove and Dispose of Existing Guardrail 11 $142,805 4,151 m $34.40
S830 Flexible Guide Post/Delineators - Round - Supply and Install 8 $129,167 1,541 posts $83.82
U100 Trenching and Backfilling 1 $2,712 55 m $49.30
U105 Secondary Cable - Supply and Install 1 $1,599 100 m $15.99
U120 Cast In Place Concrete Base - Supply and Install 1 $6,049 2 units $3,024.27
U125 Street Light Standard - Supply and Install 1 $7,244 2 units $3,621.81
X346 Rock Rip-Rap - Hand Laid 1 $4,500 10 m2 $450.00
X510 Cutting of Pavement Edge 7 $94,243 9,140 m $10.31

____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 FORT MCMURRAY REGION, Weighted Unit Price Averages Page 1 of 2
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

B100 Subgrade Excavation 1 $29,766 1,100 m3 $27.06


B152 Granular Fill (Pit-run) - Des. 6 1 $1,020,357 24,700 t $41.31
B180 Preparing Subgrade Surface (First Layer) 2 $521,320 326,500 m2 $1.60
B181 Preparing Subgrade Surface (Second Layer) 1 $65,369 49,900 m2 $1.31
B282 Granular Base Course - Des. 2 Cl. 25 2 $15,596,748 446,050 t $34.97
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 2 $46,450 455 m $102.09
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 2 $16,053 144 m $111.48
D235 Granular Backfill - Culverts 2 $24,599 330 t $74.54
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 3 $369,943 1,144 m $323.38
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 2 $484,734 810 m $598.44
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 1 $10,850 10 m $1,085.00
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 1 $60,293 28 m $2,153.33
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $208,670 77 m $2,710.00
D540 Grouting of Abandoned Culverts 2 $96,934 120 m3 $807.78
E420 Stone Barrier 1 $65,101 180 m3 $361.67
E435 Geotextile Fence Barrier - Ditch 2 $26,051 1,620 m $16.08
E452 Geotextile - Nonwoven (Supply and Install) 2 $794,799 295,010 m2 $2.69
E456 Geotextile for Stabilization - Supply and Install 1 $45,885 9,500 m2 $4.83
E505 Soil Covering (Medium Flow) 1 $143,579 59,330 m2 $2.42
E510 Soil Covering (High Flow) 1 $117,184 18,310 m2 $6.40
E515 Synthetic Permeable Ditch Barrier 2 $50,217 3,230 m $15.55
E607 Drill Seeding 1 $3,230 2 ha $1,700.00
E608 Broad-Cast Seeding 2 $105,658 156 ha $677.30
E609 Hydro-Seeding 1 $17,763 3 ha $6,125.00
E610 Slope Texturing 1 $58,420 127,000 m2 $0.46
F500 Heavy Rock RipRap (Class 1) 1 $84,500 260 m3 $325.00
G100 Clearing 1 $0 0 ha $0.00
G220 Channel Excavation 2 $216,226 36,660 m3 $5.90
G225 Common Excavation 3 $11,664,415 2,201,020 m3 $5.30
G230 Borrow Topsoil Excavation 1 $1,227,283 348,660 m3 $3.52
G235 Borrow Excavation 1 $4,718,944 830,800 m3 $5.68
G236 Borrow Excavation - Contractor's Supply 2 $409,646 22,970 m3 $17.83
G239 Overhaul 1 $1,642,816 1,235,200 m3.km $1.33
G270 Sideslope Improvement 1 $260,400 21 km $12,400.00
G300 Topsoil Placement 3 $931,574 1,570,970 m2 $0.59
G452 Remove and Dispose of Existing Fence 1 $59,349 15 km $4,065.00
G475 New Fence - Supply and Install - Class B 1 $100,120 10 km $10,321.67
Q186 Gravel Surfacing - Des. 4 Cl. 25 3 $404,877 9,350 t $43.30
Q565 Cold Milling Asphalt Pavement 3 $1,088,681 256,000 m2 $4.25
Q987 Asphalt Concrete Pavement - EPS Mix Type H1 (PG58-34) 1 $4,761,792 50,400 t $94.48
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 3 $22,120,693 222,500 t $99.42
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 1 $6,734,208 83,200 t $80.94
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $3,560,342 33,300 t $106.92
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 3 $9,610,249 105,550 t $91.05
S261 Concrete Base - Supply and Install 1 $100,920 58 units $1,740.00
____________________________________________________________________________________________________
Tender Administration Section
10/26/2015 FORT MCMURRAY REGION, Weighted Unit Price Averages Page 2 of 2
Based on 2015 Construction Prices
tendered between August 01, 2014 and September 30, 2015

No. of Average of
Item Description Cont. Amount Quantity Unit Low 3 Bids

S270 Supply of Signs, 3/4" Plywood 2 $24,022 87 m2 $276.76


S271 Supply of Signs, Extruded Aluminum 1 $26,317 59 m2 $448.33
S272 Supply of Signs, Aluminum 1 $9,260 35 m2 $265.33
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 1 $30,146 90 m2 $335.33
S275 Removal and Reinstallation or Disposal of Existing Signs - One 3 $9,072 48 signs $189.01
S277 Removal and Reinstallation or Disposal of Existing Signs - Two 2 $6,260 12 signs $521.66
S288 Install Sign - Less than 1 m2 1 $17,319 243 signs $71.27
S289 Install Sign - 1 m2 to 3 m2 3 $18,224 59 signs $308.88
S290 Install Sign - over 3 m2 1 $12,227 14 signs $873.33
S292 Remove and Dispose - Breakaway Steel Posts 1 $1,816 4 posts $454.00
S309 Pavement Messages - Gore Area 2 $6,817 6 messages $1,136.11
S310 Pavement Messages - Turn Arrow (Single or Double) 3 $4,398 41 messages $107.28
S315 Pavement Messages - Stop Bar 4 $2,492 19 messages $131.14
S327 Pavement Messages - Pedestrian Crossing 1 $207 1 messages $206.67
S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 3 $74,173 90 km $825.98
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $49,023 59 km $830.90
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 3 $1,942 6 km $313.23
S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 1 $2,258 4 km $594.17
S360 Intersection Lines - Supplying Paint and Painting 4 $2,377 15 intersection $158.49
S376 Removal of Existing Roadway Lines 1 $69,667 25 km $2,786.67
S400 Underground Electrical Conduit - Supply and Install - Trench Ex 1 $255,446 6,195 m $41.23
S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $46,636 256 m $182.17
S706 Milled Rumble Strips 3 $140,568 130 km $1,083.04
S730 Supply and Install Breakaway Steel Posts - W150 X 14 1 $67,763 58 m $1,168.33
S765 Cluster Frames - Supply and Install 1 $727 2 frames $363.33
S770 Supply and Install - Wooden Post 2 $1,658 5 posts $331.58
S772 Supply and Install Post (100mm X 150mm) 1 $44,073 220 posts $200.33
S805 Strong Post W-Beam Guardrail - Supply and Install 1 $65,748 400 m $164.37
S820 Remove, Salvage and Reinstall Existing Guardrail 1 $3,703 17 m $217.83
S822 Supply of Guardrail Posts 1 $1,772 12 posts $147.67
S825 Remove and Dispose of Existing Guardrail 1 $38,753 1,100 m $35.23
S830 Flexible Guide Post/Delineators - Round - Supply and Install 4 $78,137 855 posts $91.39
U100 Trenching and Backfilling 1 $203,296 10,490 m $19.38
U105 Secondary Cable - Supply and Install 1 $344,923 41,024 m $8.41
U120 Cast In Place Concrete Base - Supply and Install 1 $288,974 91 units $3,175.54
U125 Street Light Standard - Supply and Install 1 $223,014 87 units $2,563.38
U135 Distribution Enclosure - Supply and Install 1 $71,790 5 units $14,357.97
X510 Cutting of Pavement Edge 2 $65,960 7,070 m $9.33

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016

UNIT PRICE AVERAGES REPORT

Disclaimer

The information provided in the following Unit Price Averages Report is only for the use of
Alberta Infrastructure & Transportation staff and its Consultants for the development of
construction cost estimates on Department construction projects.

The unit price averages presented in this report are based on the cumulative average of the
unit prices from the three lowest bids received for the period from August 1, 2015, to March 31,
2016 for 2016 construction projects. As well, the unit price averages are weighted by bid

These unit price averages are provided for information only and, while thought to be accurate,
are provided without warranty of any kind, either expressed or implied. The Crown, its agents,
employees or contractors will not be liable for any damages, direct or indirect, or lost profits
arising out of the use of this information, and as such, any user of this information shall assume
all associated risks.
4/8/2016 PROVINCIAL, Weighted Unit Price Averages Page 1 of 5
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

A500 Crush to Stockpile 1 $520,200 45,000 m3 $11.56


A805 Supply of Aggregate - No Option 14 $1,805,282 633,247 t $2.85
B100 Subgrade Excavation 30 $1,153,860 58,860 m3 $19.60
B152 Granular Fill (Pit-run) - Des. 6 26 $2,975,183 135,755 t $21.92
B153 Granular Fill - Des. 2 17 $799,523 30,165 t $26.50
B155 Granular Fill , 6, 125 1 $82,089 3,650 t $22.49
B173 Granular Fill - Des. 2 1 $5,974 110 m3 $54.31
B180 Preparing Subgrade Surface (First Layer) 17 $1,210,161 799,940 m2 $1.51
B181 Preparing Subgrade Surface (Second Layer) 4 $160,414 271,970 m2 $0.59
B185 Preparing Granular Surface 2 $54,136 45,800 m2 $1.18
B282 Granular Base Course - Des. 2 Cl. 25 29 $17,555,994 788,440 t $22.27
C055 Topsoil and Subsoil Stripping 3 $13,727 2,729 m3 $5.03
C056 Topsoil and Subsoil Placement 1 $37,548 4,200 m3 $8.94
C060 Common Excavation - Civil Projects 2 $45,729 5,820 m3 $7.86
C064 Wet Excavation - Type 2 1 $21,346 2,600 m3 $8.21
C069 Random Fill Zone 2A 1 $19,824 2,800 m3 $7.08
C080 Road Gravel Zone 4B 1 $11,526 200 m3 $57.63
C090 Pitrun Gravel Zone 4C 1 $25,140 500 m3 $50.28
C091 Pitrun Gravel Zone 4C 2 $86,270 5,300 t $16.28
C102 Coarse Rip-rap Bedding Zone 5B 2 $76,160 1,040 m3 $73.23
C106 Gravel Armour Zone 5C 3 $166,958 3,430 t $48.68
C130 Riprap Zone 6B 1 $232,110 1,800 m3 $128.95
C143 Salvage and Reinstall Existing Riprap 1 $2,188 40 m3 $54.71
C150 Fine Filter Zone 3A 1 $19,672 340 m3 $57.86
C160 Coarse Filter Zone 3B 1 $3,675 50 m3 $73.50
C200 Geotextile 1 $3,352 800 m2 $4.19
C225 Erosion Control Blanket 4 $30,677 9,029 m2 $3.40
C230 Drill Seeding 4 $124,985 10,060 m2 $12.42
C232 Hydroseeding 2 $6,831 1,370 m2 $4.99
C250 Barbed Wire Fence 1 $3,290 450 m $7.31
C254 Barbed Wire Fencing and Gates 1 $21,428 1,100 m $19.48
C260 Texas Gates 1 $1,017 1 Each $1,016.53
C265 Vehicle Access Control Gate 1 $21,912 4 Each $5,478.00
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 31 $251,458 3,970 m $63.33
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 21 $107,391 1,427 m $75.26
D110 Culverts - Remove and Dispose 3 $14,053 162 m $86.75
D200 Granular Backfill - Culverts 4 $13,644 736 m3 $18.54
D235 Granular Backfill - Culverts 13 $182,423 6,420 t $28.41
D400 Culverts - Supply and Install (400 mm dia. C.S.P.) 3 $53,669 253 m $212.13
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 5 $126,061 506 m $249.13
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 29 $763,528 4,513 m $169.18
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 17 $234,105 1,296 m $180.64
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 9 $50,708 661 m $76.71
D431 Culverts - Supply and Install (1000 mm dia. C.S.P.) 4 $39,920 699 m $57.11
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 8 $165,621 301 m $550.24
D437 Culverts - Supply and Install (1400 mm dia. C.S.P.) 1 $3,750 3m $1,250.00
D440 Culverts - Supply and Install (600 mm dia. C.P.P.) 1 $7,618 16 m $476.12
D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia.) 1 $23,882 44 m $542.78
D505 Smoothwall Steel Pipe Culvert - Supply and Auger (500 mm dia.) 1 $43,327 91 m $476.12
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia.) 4 $187,941 191 m $983.98
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia.) 4 $542,697 397 m $1,366.99
D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia.) 2 $158,188 660 m $239.68
D540 Grouting of Abandoned Culverts 13 $3,775,586 1,289 m3 $2,928.17
D545 Grouting Liners 4 $39,580 50 m3 $791.12

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PROVINCIAL, Weighted Unit Price Averages Page 2 of 5
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

D607 Filter Material 2 $77,110 862 m3 $89.45


D615 Perforated Pipe 4 $74,359 609 m $122.10
D620 Non-Perforated Pipe - Supply and Install 1 $4,528 23 m $196.86
D728 Manholes - Supply and Install (1200 mm dia. Std. Length) 1 $2,354 550 units $4.28
D730 Manholes - Supply and Install (1200 mm dia x Excess Length) 1 $2,354 550 m $4.28
D732 Adjust Manholes 7 $20,355 572 units $35.59
D734 Ajust Water Valve 5 $7,671 561 units $13.67
D760 Catch Basin - Supply and Install (600 mm dia. x 1.83 m) 1 $7,122 1 units $7,121.67
D787 Concrete Storm Sewer - Supply and Install (all dia.) 4 $9,416 2,200 m $4.28
D830 Culvert Liner - Supply and Install (450 mm Dia.) 2 $25,007 49 m $510.35
D835 Culvert Liner - Supply and Install (525 mm Dia.) 1 $93,500 187 m $500.00
D845 Culvert Liner - Supply and Install (750 mm Dia.) 3 $137,320 240 m $572.17
D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 3 $80,284 145 m $553.68
E003 Misc. Environmental Work 1 $14,934 140 plantings $106.67
E325 Gabion Baskets - Supply and Install 1 $51,584 125 m3 $412.67
E331 Gabion Mattress - Supply and Install 2 $151,401 1,180 m2 $128.31
E400 Straw Bale Barrier - Slope 1 $766 2m $383.03
E420 Stone Barrier 1 $58,209 275 m3 $211.67
E435 Geotextile Fence Barrier - Ditch 39 $708,596 23,313 m $30.39
E452 Geotextile - Nonwoven (Supply and Install) 11 $96,159 23,410 m2 $4.11
E453 Geogrid - Supply and Install 5 $62,672 9,840 m2 $6.37
E454 Geotextile for Materials Separation - Supply and Install 3 $22,191 8,005 m2 $2.77
E456 Geotextile for Stabilization - Supply and Install 9 $135,882 54,150 m2 $2.51
E500 Soil Covering (Low Flow) 1 $2,499 300 m2 $8.33
E505 Soil Covering (Medium Flow) 12 $163,639 19,980 m2 $8.19
E510 Soil Covering (High Flow) 20 $451,106 153,630 m2 $2.94
E515 Synthetic Permeable Ditch Barrier 3 $27,702 1,641 m $16.88
E607 Drill Seeding 4 $29,106 21 ha $1,406.76
E608 Broad-Cast Seeding 19 $55,316 575 ha $96.13
E609 Hydro-Seeding 4 $82,657 555 ha $149.05
E610 Slope Texturing 4 $107,744 198,300 m2 $0.54
F188 Excavation - Structural 4 $133,609 7,960 m3 $16.79
F189 Excavation - Channel 3 $7,005 360 m3 $19.46
F195 Backfill - Non-Granular 6 $1,954,051 7,270 m3 $268.78
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 6 $480,718 8,169 m3 $58.85
F203 Backfill - Crushed Granular, 2, 25 2 $97,805 1,295 m3 $75.53
F493 SPCSP - Supply 2 $89,751 88 m $1,022.69
F494 SPCSP - Assembly 2 $80,246 88 m $914.38
F495 CSP with Couplers - Supply 5 $137,166 249 m $551.53
F496 CSP - Assembly 5 $71,151 249 m $286.09
F500 Heavy Rock RipRap (Class 1) 32 $1,154,460 7,494 m3 $154.05
F505 Heavy Rock RipRap (Class 1M) 11 $665,985 1,270 m3 $524.40
F515 Heavy Rock RipRap (Class 2) 11 $6,346,921 6,416 m3 $989.23
F525 Heavy Rock RipRap (Class 3) 6 $427,025 2,993 m3 $142.67
F755 Surface Removal 6 $284,858 5,713 m2 $49.86
F760 Partial Depth Repair 15 $475,936 1,488 m2 $319.85
F765 Full Depth Repair 6 $94,522 66 m2 $1,432.15
F770 Sandblasting (Deck Surface) 4 $65,968 3,845 m2 $17.16
F775 Deck Overlay Concrete 2 $218,321 199 m3 $1,097.09
F776 Placement Deck Overlay Concrete 3 $390,361 3,250 m2 $120.11
F812 Supply of Piling - H-Pile 7 $332,986 2,526 m $131.82
F816 Pile Set-up 6 $340,913 150 piles $2,272.76
F818 Pile Driving 6 $162,846 2,495 m $65.27
F820 Loading Tests 1 $5,695
4 tests $1,423.74
F822 Pile Concrete 3 $1,592,927 4,948 m3 $321.93
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PROVINCIAL, Weighted Unit Price Averages Page 3 of 5
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

F824 Drill Rig Set-up 3 $420,194 706 piles $595.18


F826 Pile Installation 4 $681,408 4,988 m $136.61
F834 Concrete - Class C 9 $880,060 1,929 m3 $456.25
F841 Concrete - Class HPC 8 $1,739,473 1,288 m3 $1,350.10
F850 Plain Reinforcing Steel - Supply 9 $911,509 561,206 kg $1.62
F854 Reinforcing Steel - Place 12 $658,638 667,954 kg $0.99
F974 Deck Waterproofing 5 $153,645 3,085 m2 $49.80
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 6 $396,348 2,055 t $192.87
F982 Asphalt Concrete Pavement - Mix Type M1 (200-300A) 3 $152,090 343 t $443.41
G100 Clearing 6 $113,698 565 ha $201.07
G105 Clearing and Timber Salvage 2 $18,738 1 ha $17,191.06
G220 Channel Excavation 18 $244,110 23,767 m3 $10.27
G225 Common Excavation 21 $4,467,153 893,418 m3 $5.00
G230 Borrow Topsoil Excavation 1 $388,800 135,000 m3 $2.88
G235 Borrow Excavation 3 $2,034,305 336,629 m3 $6.04
G236 Borrow Excavation - Contractor's Supply 12 $1,526,128 118,940 m3 $12.83
G239 Overhaul 2 $423,237 267,600 m3.km $1.58
G248 Common and/or Borrow Excavation Loaded to Trucks 2 $353,333 30,988 m3 $11.40
G270 Sideslope Improvement 15 $3,420,589 117 km $29,305.93
G300 Topsoil Placement 26 $1,092,907 1,359,412 m2 $0.80
G452 Remove and Dispose of Existing Fence 15 $67,099 569 km $117.92
G470 New Fence - Supply and Install - Class A 2 $3,803 0 km $18,109.57
G475 New Fence - Supply and Install - Class B 12 $185,167 570 km $325.10
G482 New Fence - Supply and Install - Class E 2 $9,309 1 km $12,751.60
G505 Remove and Reinstall Livestock Guards 1 $4,613 2 units $2,306.43
M100 Crack Routing and Sealing 1 $22,863 1,580 m $14.47
M102 Crack Repair - Spray Patch 5 $596,636 127,660 m $4.67
M103 Transverse Crack Repair - Mill & Fill 3 $2,315,744 26,410 m $87.68
Q185 Gravel Surfacing - Des. 4 Cl. 20 10 $1,072,751 38,211 t $28.07
Q186 Gravel Surfacing - Des. 4 Cl. 25 18 $357,243 14,474 t $24.68
Q510 Asphalt Mix For Others 8 $476,475 8,250 t $57.75
Q560 Cold Milling Asphalt Pavement 1 $1,354,560 24,000 m3 $56.44
Q565 Cold Milling Asphalt Pavement 30 $9,288,048 3,677,651 m2 $2.53
Q567 Supply Rejuvenating Agent 2 $4,492 1,830 l $2.45
Q700 Removal of Asphalt Concrete Pavement from Bridge Decks 3 $26,569 1,030 m2 $25.79
Q722 Supply and Place Fog Coat 4 $44,478 66,225 m2 $0.67
Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 2 $377,918 86,060 m2 $4.39
Q798 Chip Seal Coat - Bridge Decks 1 $44,345 3,500 m2 $12.67
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 10 $31,987,837 446,180 t $71.69
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 16 $45,190,315 650,180 t $69.50
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 21 $49,275,805 730,380 t $67.47
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 6 $11,338,125 163,890 t $69.18
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 9 $4,279,183 55,210 t $77.51
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 14 $19,143,801 317,510 t $60.29
S205 Remove and Dispose of Existing Signs - One Post 2 $8,406 90 signs $93.40
S210 Remove and Dispose of Existing Signs - Two Post 1 $1,307 5 signs $261.33
S261 Concrete Base - Supply and Install 12 $194,496 1,247 units $155.97
S270 Supply of Signs, 3/4" Plywood 17 $42,164 706 m2 $59.71
S271 Supply of Signs, Extruded Aluminum 12 $140,248 1,471 m2 $95.37
S272 Supply of Signs, Aluminum 29 $69,905 2,453 m2 $28.50
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 28 $112,979 926 m2 $121.95
S275 Removal and Reinstallation or Disposal of Existing Signs - One Post 33 $191,974 2,679 signs $71.66
S277 Removal and Reinstallation or Disposal of Existing Signs - Two Posts 23 $61,370 1,787 signs $34.34
S283 Concrete Base - Remove and Reinstall 4 $17,618 566 units $31.13
S288 Install Sign - Less than 1 m2 36 $124,378 3,763 signs $33.05
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PROVINCIAL, Weighted Unit Price Averages Page 4 of 5
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

S289 Install Sign - 1 m2 to 3 m2 22 $51,827 1,787 signs $29.00


S290 Install Sign - over 3 m2 13 $51,219 1,174 signs $43.63
S291 Remove and Reinstall Breakaway Steel Posts 3 $11,077 20 posts $553.87
S292 Remove and Dispose - Breakaway Steel Posts 9 $22,098 70 posts $315.69
S309 Pavement Messages - Gore Area 5 $20,340 17 messages $1,196.44
S310 Pavement Messages - Turn Arrow (Single or Double) 7 $20,685 697 messages $29.68
S315 Pavement Messages - Stop Bar 10 $20,024 1,744 messages $11.48
S320 Pavement Messages - Stop Ahead 4 $5,481 1,104 messages $4.96
S321 Pavement Messages - STOP 2 $2,881 553 messages $5.21
S326 Pavement Messages - Railway Crossing 3 $6,168 1,106 messages $5.58
S327 Pavement Messages - Pedestrian Crossing 1 $1,253 4 messages $313.33
S341 Durable Pavement Messages - Turn or Straight Arrows (Single or Double) 17 $93,990 407 messages $230.93
S342 Durable Pavement Messages - Stop Bar 24 $129,612 806 messages $160.81
S343 Durable Pavement Messages - Railway Crossing 5 $6,473 9 messages $719.26
S344 Durable Pavement Messages - Stop Ahead 12 $22,646 27 messages $838.73
S345 Durable Pavement Messages - Aircraft Patrol Zone 2 $7,819 4 messages $1,954.82
S346 Durable Pavement Messages - Pedestrian Crossing 4 $27,272 571 messages $47.76
S347 Durable Pavement Messages - STOP 10 $23,288 57 messages $408.57
S348 Durable Pavement Messages - SCHOOL ZONE 1 $2,354 550 messages $4.28
S349 Removal of Existing Durable Pavement Messages 1 $530 2 messages $265.00
S350 Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 34 $526,456 2,900 km $181.56
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines) 10 $130,073 161 km $809.27
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing Lines) 9 $11,313 29 km $393.07
S355 Roadway Lines - Supplying Paint and Paiting (Directional Dividing and 1 Edge Line) 4 $5,803 10 km $560.66
S360 Intersection Lines - Supplying Paint and Painting 35 $59,321 2,458 intersections $24.13
S370 Interchange Lines - Supplying Paint and Painting 1 $3,592 1 interchanges $3,591.67
S376 Removal of Existing Roadway Lines 2 $7,808 2 km $4,109.65
S400 Underground Electrical Conduit - Supply and Install - Trench Excavation 3 $20,052 1,200 m $16.71
S405 Underground Electrical Conduit - Supply and Install - Pushed Conduit 10 $65,691 2,934 m $22.39
S700 Milled Rumble Strips for Stop Conditions 13 $73,738 580 sets $127.14
S706 Milled Rumble Strips 26 $616,359 757 km $813.70
S730 Supply and Install Breakaway Steel Posts - W150 X 14 9 $114,768 673 m $170.53
S735 Supply and Install Breakaway Steel Posts - W200 X 15 3 $11,391 12 m $949.28
S740 Supply and Install Breakaway Steel Posts - W150 X 22 2 $18,354 562 m $32.66
S765 Cluster Frames - Supply and Install 9 $15,427 1,674 frames $9.22
S770 Supply and Install - Wooden Post 4 $23,628 139 posts $169.98
S772 Supply and Install Post (100mm X 150mm) 35 $250,913 3,349 posts $74.92
S773 Supply and Install Post (150mm X 200mm) 2 $10,562 38 posts $277.94
S800 W-Beam Guardrail - Supply and Install 2 $14,059 32 m $439.33
S805 Strong Post W-Beam Guardrail - Supply and Install 30 $1,852,175 14,032 m $132.00
S815 Cable Barrier - Supply and Install 4 $433,551 4,708 m $92.09
S820 Remove, Salvage and Reinstall Existing Guardrail 2 $6,454 580 m $11.13
S822 Supply of Guardrail Posts 1 $2,354 550 posts $4.28
S825 Remove and Dispose of Existing Guardrail 36 $754,384 26,043 m $28.97
S830 Flexible Guide Post/Delineators - Round - Supply and Install 41 $477,650 8,168 posts $58.48
U100 Trenching and Backfilling 9 $51,772 3,457 m $14.98
U105 Secondary Cable - Supply and Install 12 $55,714 6,349 m $8.78
U110 Removal and Salvage of Existing Standards 2 $8,858 10 units $885.78
U115 Removal and Disposal of Existing Light Fixures 5 $37,487 586 units $63.97
U120 Cast In Place Concrete Base - Supply and Install 3 $33,503 568 units $58.98
U125 Street Light Standard - Supply and Install 9 $186,778 1,158 units $161.29
U130 Salvaged Street Light Standard - Install 2 $12,027 10 poles $1,202.73
U135 Distribution Enclosure - Supply and Install 6 $65,699 1,109 units $59.24
X215 Removing Curb and Gutter 2 $38,052 1,180 m $32.25
X220 Removing Concrete Surface 5 $101,252 5,684 m2 $17.81
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PROVINCIAL, Weighted Unit Price Averages Page 5 of 5
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

X230 Removing Catch Basin 1 $2,354 550 units $4.28


X235 Removing Curb 3 $34,855 1,803 m $19.33
X300 Concrete Sidewalk (all widths) 1 $2,354 550 m $4.28
X310 Monolithic Sidewalk, Curb and Gutter (all widths) 2 $107,384 1,065 m $100.83
X315 Monolithic Sidewalk, Curb and Gutter (all widths) (Commercial Crossings) 1 $2,354 550 m $4.28
X320 Concrete Curb (all Types) 1 $12,325 75 m $164.33
X325 Curb and Gutter (all heights) 4 $140,837 1,703 m $82.70
X346 Rock Rip-Rap - Hand Laid 3 $13,584 130 m2 $104.49
X350 Solid Concrete Islands 3 $164,526 1,635 m2 $100.63
X355 Concrete Barrier 1 $287,280 1,050 m $273.60
X360 Concrete Swale 1 $2,354 550 m $4.28
X400 Solid Concrete Medians 1 $550,448 5,750 m2 $95.73
X415 Granular Fill for Medians 2 $7,879 620 t $12.71
X435 Median Asphalt Concrete Surfacing 1 $2,354 550 t $4.28
X440 Median Concrete Surfacing 2 $20,504 700 m2 $29.29
X510 Cutting of Pavement Edge 32 $570,420 65,877 m $8.66

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 SOUTHERN REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 1 $2,354 550 t $4.28


B100 Subgrade Excavation 5 $111,602 5,410 m3 $20.63
B152 Granular Fill (Pit-run) - Des. 6 4 $584,176 33,070 t $17.66
B153 Granular Fill - Des. 2 2 $46,138 2,070 t $22.29
B155 Granular Fill , 6, 125 1 $82,089 3,650 t $22.49
B282 Granular Base Course - Des. 2 Cl. 25 4 $508,589 26,800 t $18.98
C055 Topsoil and Subsoil Stripping 1 $11,175 2,500 m3 $4.47
C056 Topsoil and Subsoil Placement 1 $37,548 4,200 m3 $8.94
C060 Common Excavation - Civil Projects 1 $34,029 5,700 m3 $5.97
C064 Wet Excavation - Type 2 1 $21,346 2,600 m3 $8.21
C069 Random Fill Zone 2A 1 $19,824 2,800 m3 $7.08
C080 Road Gravel Zone 4B 1 $11,526 200 m3 $57.63
C090 Pitrun Gravel Zone 4C 1 $25,140 500 m3 $50.28
C091 Pitrun Gravel Zone 4C 2 $86,270 5,300 t $16.28
C102 Coarse Rip-rap Bedding Zone 5B 1 $71,760 1,000 m3 $71.76
C106 Gravel Armour Zone 5C 3 $166,958 3,430 t $48.68
C130 Riprap Zone 6B 1 $232,110 1,800 m3 $128.95
C143 Salvage and Reinstall Existing Riprap 1 $2,188 40 m3 $54.71
C150 Fine Filter Zone 3A 1 $19,672 340 m3 $57.86
C160 Coarse Filter Zone 3B 1 $3,675 50 m3 $73.50
C200 Geotextile 1 $3,352 800 m2 $4.19
C225 Erosion Control Blanket 1 $14,352 4,800 m2 $2.99
C230 Drill Seeding 1 $6,675 8,900 m2 $0.75
C232 Hydroseeding 2 $6,831 1,370 m2 $4.99
C250 Barbed Wire Fence 1 $3,290 450 m $7.31
C254 Barbed Wire Fencing and Gates 1 $21,428 1,100 m $19.48
C260 Texas Gates 1 $1,017 1 Each $1,016.53
C265 Vehicle Access Control Gate 1 $21,912 4 Each $5,478.00
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 5 $25,255 743 m $33.99
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 3 $5,712 48 m $118.99
D200 Granular Backfill - Culverts 1 $2,869 40 m3 $71.72
D235 Granular Backfill - Culverts 1 $2,354 550 t $4.28
D400 Culverts - Supply and Install (400 mm dia. C.S.P.) 1 $2,752 13 m $211.67
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 2 $50,790 206 m $246.55
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 4 $64,533 805 m $80.16
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 4 $24,783 85 m $291.56
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 2 $20,004 36 m $555.66
D540 Grouting of Abandoned Culverts 2 $61,305 666 m3 $92.05
D732 Adjust Manholes 1 $2,966 3 units $988.59
D734 Ajust Water Valve 1 $1,019 2 units $509.52
E435 Geotextile Fence Barrier - Ditch 5 $24,054 1,808 m $13.30
E454 Geotextile for Materials Separation - Supply and Install 1 $1,866 350 m2 $5.33
E456 Geotextile for Stabilization - Supply and Install 1 $2,354 550 m2 $4.28
E505 Soil Covering (Medium Flow) 2 $10,758 2,400 m2 $4.48
E510 Soil Covering (High Flow) 1 $2,354 550 m2 $4.28
E607 Drill Seeding 2 $16,502 6 ha $2,602.91
E608 Broad-Cast Seeding 3 $6,324 1 ha $7,439.91
F495 CSP with Couplers - Supply 2 $75,365 168 m $448.60
F496 CSP - Assembly 2 $22,296 168 m $132.71
F500 Heavy Rock RipRap (Class 1) 1 $18,871 80 m3 $235.89
F515 Heavy Rock RipRap (Class 2) 2 $46,954 256 m3 $183.41
F525 Heavy Rock RipRap (Class 3) 2 $151,316 1,770 m3 $85.49
F755 Surface Removal 1 $51,040 2,015 m2 $25.33
F760 Partial Depth Repair 4 $41,302 1,141 m2 $36.20

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 SOUTHERN REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

F765 Full Depth Repair 1 $13,620 20 m2 $681.00


F770 Sandblasting (Deck Surface) 1 $23,314 2,015 m2 $11.57
F775 Deck Overlay Concrete 1 $122,223 131 m3 $933.00
F776 Placement Deck Overlay Concrete 1 $139,700 2,015 m2 $69.33
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 1 $27,350 75 t $364.67
G100 Clearing 1 $13,990 0 ha $31,089.29
G220 Channel Excavation 1 $821 45 m3 $18.25
G225 Common Excavation 4 $354,852 47,140 m3 $7.53
G235 Borrow Excavation 2 $48,145 1,129 m3 $42.64
G270 Sideslope Improvement 3 $844,094 24 km $35,842.61
G300 Topsoil Placement 4 $56,781 70,948 m2 $0.80
G452 Remove and Dispose of Existing Fence 5 $13,612 552 km $24.64
G475 New Fence - Supply and Install - Class B 5 $29,477 552 km $53.36
M102 Crack Repair - Spray Patch 2 $188,545 38,650 m $4.88
Q185 Gravel Surfacing - Des. 4 Cl. 20 2 $8,157 66 t $123.58
Q186 Gravel Surfacing - Des. 4 Cl. 25 3 $27,884 1,550 t $17.99
Q510 Asphalt Mix For Others 1 $53,580 1,000 t $53.58
Q565 Cold Milling Asphalt Pavement 3 $1,001,823 323,950 m2 $3.09
Q700 Removal of Asphalt Concrete Pavement from Bridge Decks 1 $2,380 60 m2 $39.67
Q722 Supply and Place Fog Coat 1 $13,246 12,615 m2 $1.05
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 1 $1,811,312 31,600 t $57.32
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 2 $4,010,148 61,850 t $64.84
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 2 $7,603,196 119,150 t $63.81
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 2 $3,802,025 52,640 t $72.23
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $865,065 10,950 t $79.00
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 2 $4,344,345 82,700 t $52.53
S205 Remove and Dispose of Existing Signs - One Post 1 $307 1 signs $306.67
S261 Concrete Base - Supply and Install 1 $18,317 14 units $1,308.33
S270 Supply of Signs, 3/4" Plywood 2 $3,363 17 m2 $196.00
S272 Supply of Signs, Aluminum 3 $8,192 572 m2 $14.33
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 2 $18,496 68 m2 $271.64
S275 Removal and Reinstallation or Disposal of Existing Signs - One Post 4 $31,633 669 signs $47.28
S277 Removal and Reinstallation or Disposal of Existing Signs - Two Posts 3 $10,068 563 signs $17.88
S288 Install Sign - Less than 1 m2 4 $14,605 726 signs $20.12
S289 Install Sign - 1 m2 to 3 m2 3 $8,358 570 signs $14.66
S292 Remove and Dispose - Breakaway Steel Posts 1 $5,900 12 posts $491.67
S309 Pavement Messages - Gore Area 1 $2,200 2 messages $1,100.00
S315 Pavement Messages - Stop Bar 1 $2,354 550 messages $4.28
S320 Pavement Messages - Stop Ahead 1 $2,354 550 messages $4.28
S321 Pavement Messages - STOP 1 $2,354 550 messages $4.28
S326 Pavement Messages - Railway Crossing 1 $2,354 550 messages $4.28
S341 Durable Pavement Messages - Turn or Straight Arrows (Single or Double) 3 $21,833 100 messages $218.33
S342 Durable Pavement Messages - Stop Bar 3 $31,103 56 messages $555.41
S344 Durable Pavement Messages - Stop Ahead 3 $7,571 10 messages $757.11
S345 Durable Pavement Messages - Aircraft Patrol Zone 1 $1,999 2 messages $999.63
S346 Durable Pavement Messages - Pedestrian Crossing 1 $2,801 3 messages $933.77
S347 Durable Pavement Messages - STOP 3 $14,498 38 messages $381.52
S349 Removal of Existing Durable Pavement Messages 1 $530 2 messages $265.00
S350 Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 5 $69,259 637 km $108.74
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines) 2 $18,251 21 km $871.15
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing Lines) 1 $80 0 km $346.61
S355 Roadway Lines - Supplying Paint and Paiting (Directional Dividing and 1 Edge Line) 1 $477 1 km $453.99
S360 Intersection Lines - Supplying Paint and Painting 4 $6,407 574 intersections $11.16
S405 Underground Electrical Conduit - Supply and Install - Pushed Conduit 1 $9,810
125 m $78.48
S700 Milled Rumble Strips for Stop Conditions 3 $14,885 556 sets $26.77
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 SOUTHERN REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

S706 Milled Rumble Strips 3 $37,377 37 km $1,002.07


S730 Supply and Install Breakaway Steel Posts - W150 X 14 1 $2,467 2m $1,233.33
S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $16,000 12 m $1,333.33
S765 Cluster Frames - Supply and Install 1 $2,354 550 frames $4.28
S772 Supply and Install Post (100mm X 150mm) 4 $24,475 667 posts $36.69
S773 Supply and Install Post (150mm X 200mm) 2 $10,562 38 posts $277.94
S800 W-Beam Guardrail - Supply and Install 2 $14,059 32 m $439.33
S805 Strong Post W-Beam Guardrail - Supply and Install 4 $184,304 1,525 m $120.86
S815 Cable Barrier - Supply and Install 1 $2,354 550 m $4.28
S825 Remove and Dispose of Existing Guardrail 5 $93,821 4,666 m $20.11
S830 Flexible Guide Post/Delineators - Round - Supply and Install 5 $72,736 1,651 posts $44.06
U100 Trenching and Backfilling 1 $7,503 455 m $16.49
U105 Secondary Cable - Supply and Install 1 $9,095 1,130 m $8.05
U110 Removal and Salvage of Existing Standards 1 $4,265 8 units $533.14
U115 Removal and Disposal of Existing Light Fixures 1 $623 8 units $77.84
U130 Salvaged Street Light Standard - Install 1 $6,686 8 poles $835.75
X325 Curb and Gutter (all heights) 1 $16,089 93 m $173.00
X415 Granular Fill for Medians 1 $5,525 70 t $78.93
X440 Median Concrete Surfacing 1 $18,150 150 m2 $121.00
X510 Cutting of Pavement Edge 5 $75,054 8,935 m $8.40

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 CENTRAL REGION, Weighted Unit Price Averages Page 1 of 4
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 3 $4,708 76,200 t $0.06


B100 Subgrade Excavation 13 $174,467 10,030 m3 $17.39
B152 Granular Fill (Pit-run) - Des. 6 11 $870,964 43,725 t $19.92
B153 Granular Fill - Des. 2 7 $159,132 6,355 t $25.04
B180 Preparing Subgrade Surface (First Layer) 7 $464,274 299,350 m2 $1.55
B181 Preparing Subgrade Surface (Second Layer) 2 $114,074 228,550 m2 $0.50
B185 Preparing Granular Surface 2 $54,136 45,800 m2 $1.18
B282 Granular Base Course - Des. 2 Cl. 25 9 $5,543,915 253,180 t $21.90
C055 Topsoil and Subsoil Stripping 2 $2,552 229 m3 $11.14
C225 Erosion Control Blanket 2 $1,810 379 m2 $4.78
C230 Drill Seeding 2 $3,753 1,029 m2 $3.65
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 13 $79,745 1,275 m $62.54
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 4 $8,663 56 m $154.70
D110 Culverts - Remove and Dispose 1 $3,491 44 m $79.33
D200 Granular Backfill - Culverts 1 $1,173 16 m3 $73.33
D235 Granular Backfill - Culverts 5 $51,389 1,167 t $44.04
D400 Culverts - Supply and Install (400 mm dia. C.S.P.) 1 $45,584 220 m $207.20
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 2 $58,158 244 m $238.35
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 13 $216,337 1,241 m $174.32
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $22,357 43 m $519.94
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 1 $2,354 550 m $4.28
D431 Culverts - Supply and Install (1000 mm dia. C.S.P.) 2 $30,443 135 m $225.50
D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia.) 1 $2,354 550 m $4.28
D540 Grouting of Abandoned Culverts 2 $32,797 52 m3 $630.71
D545 Grouting Liners 1 $4,112 3 m3 $1,370.67
D607 Filter Material 1 $3,440 12 m3 $286.67
D615 Perforated Pipe 1 $25,250 150 m $168.33
D728 Manholes - Supply and Install (1200 mm dia. Std. Length) 1 $2,354 550 units $4.28
D730 Manholes - Supply and Install (1200 mm dia x Excess Length) 1 $2,354 550 m $4.28
D732 Adjust Manholes 4 $9,406 558 units $16.86
D734 Ajust Water Valve 3 $3,327 552 units $6.03
D787 Concrete Storm Sewer - Supply and Install (all dia.) 4 $9,416 2,200 m $4.28
D830 Culvert Liner - Supply and Install (450 mm Dia.) 1 $9,407 23 m $409.00
D845 Culvert Liner - Supply and Install (750 mm Dia.) 1 $21,653 32 m $676.67
E325 Gabion Baskets - Supply and Install 1 $51,584 125 m3 $412.67
E331 Gabion Mattress - Supply and Install 1 $35,401 180 m2 $196.67
E420 Stone Barrier 1 $58,209 275 m3 $211.67
E435 Geotextile Fence Barrier - Ditch 11 $51,256 3,140 m $16.32
E452 Geotextile - Nonwoven (Supply and Install) 8 $51,525 13,030 m2 $3.95
E453 Geogrid - Supply and Install 4 $26,867 4,340 m2 $6.19
E454 Geotextile for Materials Separation - Supply and Install 1 $1,966 455 m2 $4.32
E456 Geotextile for Stabilization - Supply and Install 4 $23,156 5,810 m2 $3.99
E500 Soil Covering (Low Flow) 1 $2,499 300 m2 $8.33
E505 Soil Covering (Medium Flow) 7 $33,562 6,680 m2 $5.02
E510 Soil Covering (High Flow) 2 $7,019 1,050 m2 $6.68
E608 Broad-Cast Seeding 3 $16,479 7 ha $2,459.55
E609 Hydro-Seeding 1 $2,354 550 ha $4.28
E610 Slope Texturing 1 $9,760 16,000 m2 $0.61
F188 Excavation - Structural 1 $4,734 200 m3 $23.67
F189 Excavation - Channel 1 $2,400 90 m3 $26.67
F195 Backfill - Non-Granular 1 $9,720 360 m3 $27.00
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 1 $6,200 120 m3 $51.67
F203 Backfill - Crushed Granular, 2, 25 1 $28,050 510 m3 $55.00
F493 SPCSP - Supply 1 $56,550 59 m $966.67

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 CENTRAL REGION, Weighted Unit Price Averages Page 2 of 4
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

F494 SPCSP - Assembly 1 $38,610 59 m $660.00


F500 Heavy Rock RipRap (Class 1) 9 $203,520 1,018 m3 $199.92
F505 Heavy Rock RipRap (Class 1M) 5 $50,486 874 m3 $57.76
F515 Heavy Rock RipRap (Class 2) 3 $96,458 775 m3 $124.46
F755 Surface Removal 2 $69,090 1,500 m2 $46.06
F760 Partial Depth Repair 5 $57,897 50 m2 $1,157.94
F765 Full Depth Repair 2 $7,233 4 m2 $1,808.35
F770 Sandblasting (Deck Surface) 2 $28,573 1,500 m2 $19.05
F775 Deck Overlay Concrete 1 $96,098 68 m3 $1,413.20
F776 Placement Deck Overlay Concrete 2 $250,661 1,235 m2 $202.96
F812 Supply of Piling - H-Pile 4 $63,605 978 m $65.04
F816 Pile Set-up 3 $139,773 84 piles $1,663.96
F818 Pile Driving 3 $81,381 947 m $85.94
F822 Pile Concrete 1 $2,354 550 m3 $4.28
F824 Drill Rig Set-up 1 $2,354 550 piles $4.28
F826 Pile Installation 2 $4,708 1,100 m $4.28
F834 Concrete - Class C 3 $106,345 653 m3 $162.86
F841 Concrete - Class HPC 3 $240,717 637 m3 $377.89
F850 Plain Reinforcing Steel - Supply 3 $30,278 13,657 kg $2.22
F854 Reinforcing Steel - Place 5 $56,339 25,233 kg $2.23
F974 Deck Waterproofing 2 $18,348 770 m2 $23.83
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 2 $44,717 593 t $75.41
F982 Asphalt Concrete Pavement - Mix Type M1 (200-300A) 1 $51,535 55 t $937.00
G100 Clearing 1 $12,182 1 ha $13,536.00
G105 Clearing and Timber Salvage 1 $4,015 0 ha $13,844.83
G220 Channel Excavation 8 $23,576 2,055 m3 $11.47
G225 Common Excavation 5 $422,355 51,048 m3 $8.27
G236 Borrow Excavation - Contractor's Supply 3 $290,444 28,390 m3 $10.23
G270 Sideslope Improvement 5 $591,002 19 km $31,436.26
G300 Topsoil Placement 6 $66,095 69,139 m2 $0.96
G452 Remove and Dispose of Existing Fence 3 $7,898 2 km $4,387.50
G470 New Fence - Supply and Install - Class A 1 $1,663 0 km $33,266.60
G475 New Fence - Supply and Install - Class B 3 $18,483 2 km $11,698.35
M103 Transverse Crack Repair - Mill & Fill 1 $498,033 7,450 m $66.85
Q185 Gravel Surfacing - Des. 4 Cl. 20 5 $76,321 2,455 t $31.09
Q186 Gravel Surfacing - Des. 4 Cl. 25 7 $133,119 5,099 t $26.11
Q565 Cold Milling Asphalt Pavement 13 $2,382,037 1,087,860 m2 $2.19
Q567 Supply Rejuvenating Agent 2 $4,492 1,830 l $2.45
Q700 Removal of Asphalt Concrete Pavement from Bridge Decks 1 $11,160 310 m2 $36.00
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 6 $14,922,542 212,450 t $70.24
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 8 $20,966,087 323,270 t $64.86
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 5 $7,276,786 110,700 t $65.73
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 3 $7,424,362 110,150 t $67.40
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 3 $540,806 7,050 t $76.71
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 6 $7,237,821 123,550 t $58.58
S261 Concrete Base - Supply and Install 3 $63,245 599 units $105.59
S270 Supply of Signs, 3/4" Plywood 6 $7,390 31 m2 $241.75
S271 Supply of Signs, Extruded Aluminum 3 $56,986 696 m2 $81.88
S272 Supply of Signs, Aluminum 15 $23,110 1,183 m2 $19.54
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 12 $25,592 91 m2 $282.26
S275 Removal and Reinstallation or Disposal of Existing Signs - One Post 13 $52,950 822 signs $64.42
S277 Removal and Reinstallation or Disposal of Existing Signs - Two Posts 8 $15,796 587 signs $26.91
S288 Install Sign - Less than 1 m2 15 $35,000 1,511 signs $23.16
S289 Install Sign - 1 m2 to 3 m2 8 $12,763 579 signs $22.04
S290 Install Sign - over 3 m2 4 $18,725 575 signs $32.57
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 CENTRAL REGION, Weighted Unit Price Averages Page 3 of 4
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

S292 Remove and Dispose - Breakaway Steel Posts 2 $5,248 20 posts $262.40
S309 Pavement Messages - Gore Area 1 $9,000 6 messages $1,500.00
S310 Pavement Messages - Turn Arrow (Single or Double) 1 $4,440 36 messages $123.33
S315 Pavement Messages - Stop Bar 2 $5,361 572 messages $9.37
S320 Pavement Messages - Stop Ahead 1 $2,354 550 messages $4.28
S326 Pavement Messages - Railway Crossing 1 $1,460 6 messages $243.33
S341 Durable Pavement Messages - Turn or Straight Arrows (Single or Double) 8 $44,295 188 messages $235.61
S342 Durable Pavement Messages - Stop Bar 13 $60,952 658 messages $92.63
S343 Durable Pavement Messages - Railway Crossing 4 $5,607 7 messages $800.95
S344 Durable Pavement Messages - Stop Ahead 7 $13,390 15 messages $892.64
S345 Durable Pavement Messages - Aircraft Patrol Zone 1 $5,820 2 messages $2,910.00
S346 Durable Pavement Messages - Pedestrian Crossing 2 $16,937 564 messages $30.03
S347 Durable Pavement Messages - STOP 3 $5,263 12 messages $438.61
S350 Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 13 $169,233 1,322 km $127.99
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines) 5 $54,723 83 km $658.68
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing Lines) 2 $2,645 8 km $317.15
S355 Roadway Lines - Supplying Paint and Paiting (Directional Dividing and 1 Edge Line) 1 $2,977 5 km $615.00
S360 Intersection Lines - Supplying Paint and Painting 16 $23,821 1,210 intersections $19.69
S376 Removal of Existing Roadway Lines 2 $7,808 2 km $4,109.65
S400 Underground Electrical Conduit - Supply and Install - Trench Excavation 1 $2,354 550 m $4.28
S405 Underground Electrical Conduit - Supply and Install - Pushed Conduit 1 $2,354 550 m $4.28
S700 Milled Rumble Strips for Stop Conditions 5 $26,983 9 sets $2,998.15
S706 Milled Rumble Strips 11 $219,930 268 km $820.76
S730 Supply and Install Breakaway Steel Posts - W150 X 14 2 $38,769 43 m $901.61
S735 Supply and Install Breakaway Steel Posts - W200 X 15 1 $5,200 6m $866.67
S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $2,354 550 m $4.28
S765 Cluster Frames - Supply and Install 3 $3,918 556 frames $7.05
S770 Supply and Install - Wooden Post 2 $2,694 11 posts $244.88
S772 Supply and Install Post (100mm X 150mm) 14 $63,279 1,398 posts $45.26
S805 Strong Post W-Beam Guardrail - Supply and Install 12 $608,136 5,135 m $118.43
S815 Cable Barrier - Supply and Install 1 $105,456 1,352 m $78.00
S820 Remove, Salvage and Reinstall Existing Guardrail 1 $2,354 550 m $4.28
S822 Supply of Guardrail Posts 1 $2,354 550 posts $4.28
S825 Remove and Dispose of Existing Guardrail 13 $197,609 7,834 m $25.22
S830 Flexible Guide Post/Delineators - Round - Supply and Install 17 $178,702 3,179 posts $56.21
U100 Trenching and Backfilling 1 $2,354 550 m $4.28
U105 Secondary Cable - Supply and Install 2 $4,708 1,100 m $4.28
U115 Removal and Disposal of Existing Light Fixures 1 $2,354 550 units $4.28
U120 Cast In Place Concrete Base - Supply and Install 1 $2,354 550 units $4.28
U125 Street Light Standard - Supply and Install 1 $2,354 550 units $4.28
U135 Distribution Enclosure - Supply and Install 1 $2,354 550 units $4.28
X215 Removing Curb and Gutter 1 $8,466 200 m $42.33
X220 Removing Concrete Surface 2 $4,164 580 m2 $7.18
X230 Removing Catch Basin 1 $2,354 550 units $4.28
X235 Removing Curb 1 $2,413 40 m $60.33
X300 Concrete Sidewalk (all widths) 1 $2,354 550 m $4.28
X310 Monolithic Sidewalk, Curb and Gutter (all widths) 1 $2,354 550 m $4.28
X315 Monolithic Sidewalk, Curb and Gutter (all widths) (Commercial Crossings) 1 $2,354 550 m $4.28
X320 Concrete Curb (all Types) 1 $12,325 75 m $164.33
X325 Curb and Gutter (all heights) 2 $36,288 750 m $48.38
X346 Rock Rip-Rap - Hand Laid 2 $4,580 39 m2 $117.43
X350 Solid Concrete Islands 1 $14,409 95 m2 $151.67
X360 Concrete Swale 1 $2,354 550 m $4.28
X415 Granular Fill for Medians 1 $2,354 550 t $4.28
X435 Median Asphalt Concrete Surfacing 1 $2,354 550 t $4.28
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 CENTRAL REGION, Weighted Unit Price Averages Page 4 of 4
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

X440 Median Concrete Surfacing 1 $2,354 550 m2 $4.28


X510 Cutting of Pavement Edge 15 $91,076 8,519 m $10.69

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

A500 Crush to Stockpile 1 $520,200 45,000 m3 $11.56


A805 Supply of Aggregate - No Option 6 $1,687,493 470,725 t $3.58
B100 Subgrade Excavation 6 $309,832 16,710 m3 $18.54
B152 Granular Fill (Pit-run) - Des. 6 7 $1,266,751 48,360 t $26.19
B153 Granular Fill - Des. 2 3 $140,304 5,750 t $24.40
B180 Preparing Subgrade Surface (First Layer) 4 $401,768 277,150 m2 $1.45
B282 Granular Base Course - Des. 2 Cl. 25 8 $6,922,596 269,070 t $25.73
C230 Drill Seeding 1 $114,557 131 m2 $874.48
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 7 $109,356 1,501 m $72.86
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 7 $52,520 906 m $57.97
D110 Culverts - Remove and Dispose 1 $1,283 10 m $128.33
D200 Granular Backfill - Culverts 1 $2,354 550 m3 $4.28
D235 Granular Backfill - Culverts 5 $113,947 3,661 t $31.12
D400 Culverts - Supply and Install (400 mm dia. C.S.P.) 1 $5,333 20 m $266.67
D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 1 $17,113 56 m $305.59
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 6 $295,792 1,799 m $164.42
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 6 $125,376 985 m $127.29
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 3 $18,990 42 m $452.15
D431 Culverts - Supply and Install (1000 mm dia. C.S.P.) 1 $2,354 550 m $4.28
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 4 $122,200 226 m $540.71
D437 Culverts - Supply and Install (1400 mm dia. C.S.P.) 1 $3,750 3m $1,250.00
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia.) 1 $86,400 64 m $1,350.00
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia.) 2 $245,557 155 m $1,584.24
D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia.) 1 $155,834 110 m $1,416.67
D540 Grouting of Abandoned Culverts 4 $94,493 185 m3 $510.77
D545 Grouting Liners 2 $18,645 25 m3 $757.93
D615 Perforated Pipe 1 $19,622 124 m $158.24
D620 Non-Perforated Pipe - Supply and Install 1 $4,528 23 m $196.86
D732 Adjust Manholes 1 $6,150 9 units $683.33
D734 Ajust Water Valve 1 $3,325 7 units $475.00
D830 Culvert Liner - Supply and Install (450 mm Dia.) 1 $15,600 26 m $600.00
D845 Culvert Liner - Supply and Install (750 mm Dia.) 1 $36,667 50 m $733.33
E003 Misc. Environmental Work 1 $14,934 140 plantings $106.67
E400 Straw Bale Barrier - Slope 1 $766 2m $383.03
E435 Geotextile Fence Barrier - Ditch 11 $150,190 15,265 m $9.84
E456 Geotextile for Stabilization - Supply and Install 2 $93,370 44,390 m2 $2.10
E505 Soil Covering (Medium Flow) 2 $112,029 7,900 m2 $14.18
E510 Soil Covering (High Flow) 7 $334,982 135,640 m2 $2.47
E515 Synthetic Permeable Ditch Barrier 2 $22,433 1,366 m $16.42
E608 Broad-Cast Seeding 4 $14,813 559 ha $26.49
E609 Hydro-Seeding 1 $25,092 2 ha $12,545.98
E610 Slope Texturing 1 $73,296 152,700 m2 $0.48
F188 Excavation - Structural 1 $27,597 1,960 m3 $14.08
F189 Excavation - Channel 1 $1,627 80 m3 $20.34
F195 Backfill - Non-Granular 1 $25,181 1,180 m3 $21.34
F203 Backfill - Crushed Granular, 2, 25 1 $69,755 785 m3 $88.86
F495 CSP with Couplers - Supply 3 $61,801 81 m $765.81
F496 CSP - Assembly 3 $48,855 81 m $605.39
F500 Heavy Rock RipRap (Class 1) 10 $215,344 976 m3 $220.64
F505 Heavy Rock RipRap (Class 1M) 3 $23,250 64 m3 $363.29
F515 Heavy Rock RipRap (Class 2) 3 $611,017 2,818 m3 $216.83
F755 Surface Removal 2 $132,703 1,883 m2 $70.47
F760 Partial Depth Repair 4 $342,541 286 m2 $1,197.70
F765 Full Depth Repair 3 $73,669 42 m2 $1,754.02

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

F812 Supply of Piling - H-Pile 2 $207,142 975 m $212.45


F816 Pile Set-up 2 $59,974 46 piles $1,303.78
F818 Pile Driving 2 $47,893 975 m $49.12
F820 Loading Tests 1 $5,695 4 tests $1,423.74
F834 Concrete - Class C 3 $227,957 694 m3 $328.47
F841 Concrete - Class HPC 2 $783,197 346 m3 $2,263.57
F850 Plain Reinforcing Steel - Supply 3 $39,224 27,101 kg $1.45
F854 Reinforcing Steel - Place 3 $102,152 80,826 kg $1.26
F974 Deck Waterproofing 2 $95,277 1,763 m2 $54.04
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 2 $192,811 797 t $241.92
F982 Asphalt Concrete Pavement - Mix Type M1 (200-300A) 2 $100,555 288 t $349.15
G100 Clearing 3 $81,425 564 ha $144.37
G105 Clearing and Timber Salvage 1 $14,723 1 ha $18,404.08
G220 Channel Excavation 5 $72,593 9,700 m3 $7.48
G225 Common Excavation 6 $3,116,946 666,980 m3 $4.67
G230 Borrow Topsoil Excavation 1 $388,800 135,000 m3 $2.88
G235 Borrow Excavation 1 $1,986,160 335,500 m3 $5.92
G236 Borrow Excavation - Contractor's Supply 5 $985,061 71,780 m3 $13.72
G239 Overhaul 1 $422,145 265,500 m3.km $1.59
G270 Sideslope Improvement 3 $1,202,967 24 km $49,874.24
G300 Topsoil Placement 6 $755,129 1,002,790 m2 $0.75
G452 Remove and Dispose of Existing Fence 4 $41,472 14 km $2,866.04
G470 New Fence - Supply and Install - Class A 1 $2,140 0 km $13,373.00
G475 New Fence - Supply and Install - Class B 2 $132,347 15 km $8,593.99
G482 New Fence - Supply and Install - Class E 1 $5,950 1 km $11,666.67
G505 Remove and Reinstall Livestock Guards 1 $4,613 2 units $2,306.43
M102 Crack Repair - Spray Patch 1 $38,781 9,300 m $4.17
M103 Transverse Crack Repair - Mill & Fill 2 $1,817,711 18,960 m $95.87
Q185 Gravel Surfacing - Des. 4 Cl. 20 3 $988,274 35,690 t $27.69
Q186 Gravel Surfacing - Des. 4 Cl. 25 4 $152,478 6,335 t $24.07
Q510 Asphalt Mix For Others 2 $147,745 2,500 t $59.10
Q565 Cold Milling Asphalt Pavement 9 $4,014,933 1,516,121 m2 $2.65
Q700 Removal of Asphalt Concrete Pavement from Bridge Decks 1 $13,028 660 m2 $19.74
Q722 Supply and Place Fog Coat 2 $23,115 44,690 m2 $0.52
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 4 $16,973,853 228,200 t $74.38
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 8 $13,062,939 185,620 t $70.37
Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $111,738 1,100 t $101.58
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $381,047 4,210 t $90.51
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 3 $4,278,790 61,500 t $69.57
S205 Remove and Dispose of Existing Signs - One Post 1 $8,099 89 signs $91.00
S210 Remove and Dispose of Existing Signs - Two Post 1 $1,307 5 signs $261.33
S261 Concrete Base - Supply and Install 4 $76,054 608 units $125.09
S270 Supply of Signs, 3/4" Plywood 5 $22,403 629 m2 $35.59
S271 Supply of Signs, Extruded Aluminum 5 $54,081 703 m2 $76.96
S272 Supply of Signs, Aluminum 5 $24,385 648 m2 $37.64
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 7 $47,806 701 m2 $68.20
S275 Removal and Reinstallation or Disposal of Existing Signs - One Post 8 $74,213 963 signs $77.06
S277 Removal and Reinstallation or Disposal of Existing Signs - Two Posts 7 $26,556 610 signs $43.53
S283 Concrete Base - Remove and Reinstall 3 $13,623 562 units $24.24
S288 Install Sign - Less than 1 m2 9 $52,390 1,225 signs $42.77
S289 Install Sign - 1 m2 to 3 m2 6 $24,497 615 signs $39.83
S290 Install Sign - over 3 m2 5 $25,914 586 signs $44.22
S291 Remove and Reinstall Breakaway Steel Posts 2 $8,192 16 posts $512.00
S292 Remove and Dispose - Breakaway Steel Posts 3 $7,497 26 posts $288.34
S309 Pavement Messages - Gore Area 1 $1,600 2 messages $800.00
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

S310 Pavement Messages - Turn Arrow (Single or Double) 3 $6,421 586 messages $10.96
S315 Pavement Messages - Stop Bar 4 $8,111 594 messages $13.65
S320 Pavement Messages - Stop Ahead 2 $773 4 messages $193.34
S326 Pavement Messages - Railway Crossing 1 $2,354 550 messages $4.28
S341 Durable Pavement Messages - Turn or Straight Arrows (Single or Double) 4 $21,678 95 messages $228.19
S342 Durable Pavement Messages - Stop Bar 5 $19,485 36 messages $541.25
S343 Durable Pavement Messages - Railway Crossing 1 $867 2 messages $433.33
S344 Durable Pavement Messages - Stop Ahead 2 $1,685 2 messages $842.50
S346 Durable Pavement Messages - Pedestrian Crossing 1 $7,533 4 messages $1,883.33
S347 Durable Pavement Messages - STOP 2 $1,320 3 messages $440.00
S348 Durable Pavement Messages - SCHOOL ZONE 1 $2,354 550 messages $4.28
S350 Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 9 $160,231 778 km $206.00
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing Lines) 3 $4,604 15 km $310.25
S360 Intersection Lines - Supplying Paint and Painting 7 $13,421 611 intersections $21.96
S400 Underground Electrical Conduit - Supply and Install - Trench Excavation 2 $17,698 650 m $27.23
S405 Underground Electrical Conduit - Supply and Install - Pushed Conduit 7 $46,027 2,159 m $21.32
S700 Milled Rumble Strips for Stop Conditions 4 $29,157 14 sets $2,082.62
S706 Milled Rumble Strips 5 $143,084 161 km $886.57
S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $49,328 604 m $81.67
S735 Supply and Install Breakaway Steel Posts - W200 X 15 1 $4,400 4m $1,100.00
S765 Cluster Frames - Supply and Install 4 $8,087 565 frames $14.31
S770 Supply and Install - Wooden Post 2 $20,934 128 posts $163.55
S772 Supply and Install Post (100mm X 150mm) 8 $99,162 1,012 posts $97.99
S805 Strong Post W-Beam Guardrail - Supply and Install 8 $735,574 5,527 m $133.09
S815 Cable Barrier - Supply and Install 2 $325,741 2,806 m $116.09
S825 Remove and Dispose of Existing Guardrail 10 $333,796 8,873 m $37.62
S830 Flexible Guide Post/Delineators - Round - Supply and Install 10 $133,140 2,160 posts $61.64
U100 Trenching and Backfilling 6 $36,666 2,102 m $17.44
U105 Secondary Cable - Supply and Install 8 $39,661 3,669 m $10.81
U110 Removal and Salvage of Existing Standards 1 $4,593 2 units $2,296.34
U115 Removal and Disposal of Existing Light Fixures 3 $34,510 28 units $1,232.50
U120 Cast In Place Concrete Base - Supply and Install 1 $20,003 13 units $1,538.67
U125 Street Light Standard - Supply and Install 7 $169,997 603 units $281.92
U130 Salvaged Street Light Standard - Install 1 $5,341 2 poles $2,670.65
U135 Distribution Enclosure - Supply and Install 4 $60,878 558 units $109.10
X220 Removing Concrete Surface 1 $1,080 24 m2 $45.00
X235 Removing Curb 1 $2,209 53 m $41.67
X346 Rock Rip-Rap - Hand Laid 1 $9,004 91 m2 $98.95
X350 Solid Concrete Islands 1 $35,713 220 m2 $162.33
X510 Cutting of Pavement Edge 6 $178,604 26,218 m $6.81

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PEACE REGION, Weighted Unit Price Averages Page 1 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

A805 Supply of Aggregate - No Option 4 $110,727 85,772 t $1.29


B100 Subgrade Excavation 6 $557,959 26,710 m3 $20.89
B152 Granular Fill (Pit-run) - Des. 6 4 $253,292 10,600 t $23.90
B153 Granular Fill - Des. 2 5 $453,949 15,990 t $28.39
B173 Granular Fill - Des. 2 1 $5,974 110 m3 $54.31
B180 Preparing Subgrade Surface (First Layer) 6 $344,119 223,440 m2 $1.54
B181 Preparing Subgrade Surface (Second Layer) 2 $46,340 43,420 m2 $1.07
B282 Granular Base Course - Des. 2 Cl. 25 8 $4,580,895 239,390 t $19.14
C225 Erosion Control Blanket 1 $14,515 3,850 m2 $3.77
D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $37,101 451 m $82.21
D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 7 $40,497 417 m $97.11
D110 Culverts - Remove and Dispose 1 $9,279 108 m $85.92
D200 Granular Backfill - Culverts 1 $7,248 130 m3 $55.75
D235 Granular Backfill - Culverts 2 $14,733 1,042 t $14.14
D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 6 $186,867 668 m $279.74
D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 4 $61,589 183 m $336.55
D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 5 $29,364 69 m $425.57
D431 Culverts - Supply and Install (1000 mm dia. C.S.P.) 1 $7,124 14 m $508.84
D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 2 $23,418 39 m $600.45
D440 Culverts - Supply and Install (600 mm dia. C.P.P.) 1 $7,618 16 m $476.12
D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia.) 1 $23,882 44 m $542.78
D505 Smoothwall Steel Pipe Culvert - Supply and Auger (500 mm dia.) 1 $43,327 91 m $476.12
D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia.) 3 $101,541 127 m $799.53
D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia.) 2 $297,140 242 m $1,227.85
D540 Grouting of Abandoned Culverts 5 $3,586,992 386 m3 $9,283.10
D545 Grouting Liners 1 $16,823 22 m3 $750.00
D607 Filter Material 1 $73,670 850 m3 $86.67
D615 Perforated Pipe 2 $29,488 335 m $88.02
D732 Adjust Manholes 1 $1,833 2 units $916.67
D760 Catch Basin - Supply and Install (600 mm dia. x 1.83 m) 1 $7,122 1 units $7,121.67
D835 Culvert Liner - Supply and Install (525 mm Dia.) 1 $93,500 187 m $500.00
D845 Culvert Liner - Supply and Install (750 mm Dia.) 1 $79,000 158 m $500.00
D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 3 $80,284 145 m $553.68
E331 Gabion Mattress - Supply and Install 1 $116,000 1,000 m2 $116.00
E435 Geotextile Fence Barrier - Ditch 12 $483,096 3,100 m $155.84
E452 Geotextile - Nonwoven (Supply and Install) 3 $44,634 10,380 m2 $4.30
E453 Geogrid - Supply and Install 1 $35,805 5,500 m2 $6.51
E454 Geotextile for Materials Separation - Supply and Install 1 $18,360 7,200 m2 $2.55
E456 Geotextile for Stabilization - Supply and Install 2 $17,002 3,400 m2 $5.00
E505 Soil Covering (Medium Flow) 1 $7,290 3,000 m2 $2.43
E510 Soil Covering (High Flow) 10 $106,751 16,390 m2 $6.51
E515 Synthetic Permeable Ditch Barrier 1 $5,269 275 m $19.16
E607 Drill Seeding 2 $12,603 14 ha $878.29
E608 Broad-Cast Seeding 9 $17,700 9 ha $2,046.19
E609 Hydro-Seeding 2 $55,211 3 ha $21,651.24
E610 Slope Texturing 2 $24,688 29,600 m2 $0.83
F188 Excavation - Structural 2 $101,279 5,800 m3 $17.46
F189 Excavation - Channel 1 $2,977 190 m3 $15.67
F195 Backfill - Non-Granular 4 $1,919,150 5,730 m3 $334.93
F200 Backfill - Pit Run Granular - Des. 6 Cl. 80 5 $474,518 8,049 m3 $58.95
F493 SPCSP - Supply 1 $33,201 29 m $1,134.69
F494 SPCSP - Assembly 1 $41,636 29 m $1,422.98
F500 Heavy Rock RipRap (Class 1) 12 $716,725 5,420 m3 $132.24
F505 Heavy Rock RipRap (Class 1M) 3 $592,249 332 m3 $1,783.88

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PEACE REGION, Weighted Unit Price Averages Page 2 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

F515 Heavy Rock RipRap (Class 2) 3 $5,592,492 2,567 m3 $2,178.61


F525 Heavy Rock RipRap (Class 3) 4 $275,709 1,223 m3 $225.44
F755 Surface Removal 1 $32,026 315 m2 $101.67
F760 Partial Depth Repair 2 $34,197 11 m2 $3,108.79
F770 Sandblasting (Deck Surface) 1 $14,081 330 m2 $42.67
F812 Supply of Piling - H-Pile 1 $62,239 573 m $108.62
F816 Pile Set-up 1 $141,167 20 piles $7,058.33
F818 Pile Driving 1 $33,572 573 m $58.59
F822 Pile Concrete 2 $1,590,573 4,398 m3 $361.66
F824 Drill Rig Set-up 2 $417,840 156 piles $2,678.46
F826 Pile Installation 2 $676,700 3,888 m $174.05
F834 Concrete - Class C 3 $545,758 582 m3 $937.89
F841 Concrete - Class HPC 3 $715,560 305 m3 $2,343.02
F850 Plain Reinforcing Steel - Supply 3 $842,007 520,448 kg $1.62
F854 Reinforcing Steel - Place 4 $500,147 561,895 kg $0.89
F974 Deck Waterproofing 1 $40,020 552 m2 $72.50
F980 Asphalt Concrete Pavement - Mix Type H2 (150-200A) 1 $131,470 590 t $222.83
G100 Clearing 1 $6,100 0 ha $50,833.33
G220 Channel Excavation 4 $147,121 11,967 m3 $12.29
G225 Common Excavation 6 $573,001 128,250 m3 $4.47
G236 Borrow Excavation - Contractor's Supply 4 $250,624 18,770 m3 $13.35
G239 Overhaul 1 $1,092 2,100 m3.km $0.52
G248 Common and/or Borrow Excavation Loaded to Trucks 2 $353,333 30,988 m3 $11.40
G270 Sideslope Improvement 4 $782,527 50 km $15,572.67
G300 Topsoil Placement 10 $214,901 216,535 m2 $0.99
G452 Remove and Dispose of Existing Fence 3 $4,118 0 km $10,296.08
G475 New Fence - Supply and Install - Class B 2 $4,858 0 km $26,991.39
G482 New Fence - Supply and Install - Class E 1 $3,359 0 km $15,266.68
M100 Crack Routing and Sealing 1 $22,863 1,580 m $14.47
M102 Crack Repair - Spray Patch 2 $369,310 79,710 m $4.63
Q186 Gravel Surfacing - Des. 4 Cl. 25 4 $43,761 1,490 t $29.37
Q510 Asphalt Mix For Others 5 $275,150 4,750 t $57.93
Q560 Cold Milling Asphalt Pavement 1 $1,354,560 24,000 m3 $56.44
Q565 Cold Milling Asphalt Pavement 5 $1,889,255 749,720 m2 $2.52
Q722 Supply and Place Fog Coat 1 $8,117 8,920 m2 $0.91
Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 2 $377,918 86,060 m2 $4.39
Q798 Chip Seal Coat - Bridge Decks 1 $44,345 3,500 m2 $12.67
Q990 Asphalt Concrete Pavement - EPS Mix Type H1 3 $15,253,983 202,130 t $75.47
Q991 Asphalt Concrete Pavement - EPS Mix Type H2 2 $3,240,227 36,860 t $87.91
Q992 Asphalt Concrete Pavement - EPS Mix Type M1 6 $21,332,886 314,910 t $67.74
Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $2,492,265 33,000 t $75.52
Q996 Asphalt Concrete Pavement - EPS Mix Type S3 3 $3,282,845 49,760 t $65.97
S261 Concrete Base - Supply and Install 4 $36,880 26 units $1,418.47
S270 Supply of Signs, 3/4" Plywood 4 $9,007 29 m2 $311.22
S271 Supply of Signs, Extruded Aluminum 4 $29,181 72 m2 $406.25
S272 Supply of Signs, Aluminum 6 $14,217 51 m2 $280.25
S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 7 $21,084 67 m2 $316.15
S275 Removal and Reinstallation or Disposal of Existing Signs - One Post 8 $33,178 225 signs $147.46
S277 Removal and Reinstallation or Disposal of Existing Signs - Two Posts 5 $8,951 27 signs $331.50
S283 Concrete Base - Remove and Reinstall 1 $3,995 4 units $998.67
S288 Install Sign - Less than 1 m2 8 $22,383 301 signs $74.36
S289 Install Sign - 1 m2 to 3 m2 5 $6,208 23 signs $269.93
S290 Install Sign - over 3 m2 4 $6,580 13 signs $506.15
S291 Remove and Reinstall Breakaway Steel Posts 1 $2,885 4 posts $721.33
S292 Remove and Dispose - Breakaway Steel Posts 3 $3,454 12 posts $287.80
____________________________________________________________________________________________________
Tender Administration Section
4/8/2016 PEACE REGION, Weighted Unit Price Averages Page 3 of 3
Based on 2016 Construction Prices
tendered between August .1, 2015 and March 31, 2016

No. of Average of
Description Cont. Amount Quantity Unit Low 3 Bids

S309 Pavement Messages - Gore Area 2 $7,540 7 messages $1,077.07


S310 Pavement Messages - Turn Arrow (Single or Double) 3 $9,825 75 messages $130.99
S315 Pavement Messages - Stop Bar 3 $4,199 28 messages $149.95
S321 Pavement Messages - STOP 1 $527 3 messages $175.60
S327 Pavement Messages - Pedestrian Crossing 1 $1,253 4 messages $313.33
S341 Durable Pavement Messages - Turn or Straight Arrows (Single or Double) 2 $6,184 24 messages $257.67
S342 Durable Pavement Messages - Stop Bar 3 $18,072 56 messages $322.71
S347 Durable Pavement Messages - STOP 2 $2,207 4 messages $551.81
S350 Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 7 $127,734 163 km $785.04
S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines) 3 $57,099 57 km $1,007.04
S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing Lines) 3 $3,984 5 km $741.85
S355 Roadway Lines - Supplying Paint and Paiting (Directional Dividing and 1 Edge Line) 2 $2,350 4 km $526.81
S360 Intersection Lines - Supplying Paint and Painting 8 $15,673 63 intersections $248.77
S370 Interchange Lines - Supplying Paint and Painting 1 $3,592 1 interchanges $3,591.67
S405 Underground Electrical Conduit - Supply and Install - Pushed Conduit 1 $7,500 100 m $75.00
S700 Milled Rumble Strips for Stop Conditions 1 $2,713 1 sets $2,713.36
S706 Milled Rumble Strips 7 $215,968 291 km $742.59
S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $24,204 24 m $1,008.48
S735 Supply and Install Breakaway Steel Posts - W200 X 15 1 $1,791 2m $895.67
S765 Cluster Frames - Supply and Install 1 $1,069 3 frames $356.17
S772 Supply and Install Post (100mm X 150mm) 9 $63,998 272 posts $235.29
S805 Strong Post W-Beam Guardrail - Supply and Install 6 $324,160 1,845 m $175.70
S820 Remove, Salvage and Reinstall Existing Guardrail 1 $4,100 30 m $136.67
S825 Remove and Dispose of Existing Guardrail 8 $129,157 4,670 m $27.66
S830 Flexible Guide Post/Delineators - Round - Supply and Install 9 $93,072 1,178 posts $79.01
U100 Trenching and Backfilling 1 $5,250 350 m $15.00
U105 Secondary Cable - Supply and Install 1 $2,250 450 m $5.00
U120 Cast In Place Concrete Base - Supply and Install 1 $11,147 5 units $2,229.33
U125 Street Light Standard - Supply and Install 1 $14,427 5 units $2,885.33
U135 Distribution Enclosure - Supply and Install 1 $2,467 1 units $2,466.67
X215 Removing Curb and Gutter 1 $29,586 980 m $30.19
X220 Removing Concrete Surface 2 $96,008 5,080 m2 $18.90
X235 Removing Curb 1 $30,233 1,710 m $17.68
X310 Monolithic Sidewalk, Curb and Gutter (all widths) 1 $105,030 515 m $203.94
X325 Curb and Gutter (all heights) 1 $88,460 860 m $102.86
X350 Solid Concrete Islands 1 $114,404 1,320 m2 $86.67
X355 Concrete Barrier 1 $287,280 1,050 m $273.60
X400 Solid Concrete Medians 1 $550,448 5,750 m2 $95.73
X510 Cutting of Pavement Edge 6 $225,686 22,205 m $10.16

____________________________________________________________________________________________________
Tender Administration Section
4/8/2016

UNIT PRICE AVERAGES REPORT

Disclaimer

The information provided in the following Unit Price Averages Report is only for the use of
Alberta Infrastructure & Transportation staff and its Consultants for the development of
construction cost estimates on Department construction projects.

These unit price averages are provided for information only and, while thought to be accurate,
are provided without warranty of any kind, either expressed or implied. The Crown, its agents,
employees or contractors will not be liable for any damages, direct or indirect, or lost profits
arising out of the use of this information, and as such, any user of this information shall assume
all associated risks.
Bridge Construction Projects Monthly/Annual Unit Cost Reports
Cost by 2013 2014 2015 Monthly Unit Cost 2015 Annual Unit Cost
Bridge Structures Cost Cost Δ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Area E Est Cost Δ
$/m2 $/m2 % +/- # $/m2 # $/m2 # $/m2 2 2 2
# $/m # $/m # $/m # $/m # $/m
2 2 2
# $/m # $/m2 # $/m2 # $/m2 # m2 $ $/m2% +/-
All Bridges 4,689 4,831 3.0 1 3,374 1 3,743 1 4,082 1 3,750 4 3,852 8 3,357 12,790,381 3,810 -21.1
Rural Bridges 4,778 4,831 1.1 1 3,374 1 3,743 1 4,082 1 3,750 4 3,852 8 3,357 12,790,381 3,810 -21.1
Southern Region (R1) 2,774 3,035 9.4 1 3,374 2 2,943 3 733 2,368,084 3,230 6.4
Central Region (R3) 3,927 5,058 28.8 1 3,743 1 3,750 2 842 3,152,549 3,746-25.9
North Central Region (R5) 4,624 7,405 60.1 2 4,075 2 994 4,052,440 4,075-45.0
Peace Region (R6) 6,611 N/A 1 4,082 1 788 3,217,308 4,082 N/A
Regions

Urban Bridges 3,467 N/A N/A


Calgary (U2) 3,467 N/A N/A
Edmonton (U4) N/A N/A
All Concrete Girder Bridges 4,521 4,831 6.9 1 3,374 1 3,743 1 4,082 1 3,750 2 3,572 6 2,462 9,244,909 3,755 -22.3
All Steel Girder Bridges 4,730 N/A 3 3,897 3 1,008 3,927,325 3,897 N/A
River Crossings (L>100m)
Concrete Girders N/A N/A
Steel Girders 3,326 N/A N/A
River Crossings (L<100m)
Concrete Girders 4,607 4,831 4.9 1 3,374 1 3,743 1 4,082 1 3,750 2 3,572 6 2,462 9,244,909 3,755 -22.3
Bridge Categories

Steel Girders 5,936 N/A 1 2,552 1 132 337,129 2,552 N/A


Grade Separation Bridges
Concrete Girders N/A N/A
Steel Girders 3,645 N/A N/A
Standard Bridges
Concrete Girders 4,343 4,702 8.3 1 3,743 1 4,082 1 3,750 1 3,654 4 1,861 7,213,953 3,877 -17.5
Steel Girders N/A N/A
Prestressed Girder Types
NU Girder (NU) 5,976 N/A N/A
Bulb-Tees (BT) N/A N/A
SLC or SCC 4,343 6,225 43.3 1 4,082 1 3,654 2 1,019 4,061,404 3,985 -36.0
SL or SC 3,325 3,777 13.6 1 3,374 1 3,743 1 3,750 3 1,330 4,801,652 3,609 -4.4
Bridge Girder Types

Precast Box Girder (PB) 4,183 N/A N/A


Cast-In-Place Girder Types
Concrete Arch (CA) N/A N/A
Concrete Bean & Slab (CB) N/A N/A
Concrete Flat Slab (CS) N/A N/A
Concrete Tee (CT) N/A N/A
Concrete Voided Slab (CV) N/A N/A
CIP Concrete Box (CX) N/A N/A
Culvert Installation Monthly/Annual Unit Cost Report
2013 2014 2015 Monthly Unit Cost 2015 Annual Unit Cost
All Groups Culvert Categories Cost Cost ∆ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Area E Est Cost ∆
$/m2 $/m2 % +/- # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # $/m2 # m2 $ $/m2 % +/-
All Culverts 1,374 1,975 43.7 1 1,122 1 1,867 2 947 1 2,524 1 1,798 2 662 6 901 9 1,252 2 601 2 770 4 1,045 31 14,123 16,056,330 1,137 -42.4
Regions
Southern Region (R1) 1,081 1,572 45.5 1 1,122 1 1,798 4 763 6 1,909 2,319,733 1,215 -22.7
Heights Regions

Central Region (R3) 1,133 2,250 98.7 1 955 1 667 2 770 4 1,698 1,303,676 768 -65.9
North Central Region (R5) 1,280 1,858 45.2 1 1,867 1 2,524 2 1,060 1 1,380 1 453 2 1,203 8 3,831 5,098,895 1,331 -28.4
Peace Region (R6) 2,230 2,035 -8.8 1 944 1 652 8 1,239 1 1,024 2 734 13 6,686 7,334,026 1,097 -46.1
Fill Heights
Fill Height > 6m 1,653 2,214 33.9 1 944 1 1,798 3 1,210 1 453 6 5,443 5,986,265 1,100 -50.3
Fill Height < 6m 1,178 1,657 40.7 1 1,122 1 1,867 1 955 1 2,524 2 662 6 901 6 1,300 1 1,024 2 770 4 1,045 25 8,680 10,070,065 1,160 -30.0
Culvert Types
CSP (MP) 941 1,748 85.8 1 1,122 1 652 6 901 2 1,052 1 1,024 3 919 14 3,820 3,517,373 921 -47.3
SPCSP (SP) 1,211 1,953 61.3 2 947 4 1,148 1 453 1 1,221 8 5,782 5,693,158 985 -49.6
Welded Steel Pipe (WP) 2,109 2,764 31.1 2 1,585 1 706 3 1,311 1,896,013 1,446 -47.7
CIP Arch (AP) N/A N/A
CIP Box/Cell (BP) N/A N/A
PC Arch (CPA) N/A N/A
PC Box/Cell (PCB) 1,150 N/A 1 1,867 1 1,798 1 667 1 1,228 4 2,467 3,195,495 1,295 N/A
Culvert Types

PC Pipe (CP) N/A N/A


SPCSP Arch (RP) N/A N/A
SPCSP Arch Beam (RPA) N/A 1 2,524 1 667 1,683,078 2,524 N/A
SP integrate w/Bridge (RPB) N/A N/A
MP integrate w/Bridge (MPB) N/A N/A
Liners
Liner Plate (LP) N/A N/A
CSP Liner (MPL) N/A 1 944 1 75 71,213 944 N/A
Liners

SPCSP Liner (SPL) N/A N/A


WP Liner (WPL) N/A N/A
Extensions
CSP Extension (MPX) N/A N/A
SPCSP Extension (SPX) N/A N/A
CIP Arch Extension (APX) N/A N/A
Extensions

CIP Box/Cell Ext'n (BPX) N/A N/A


PC Arch Extension (CPAX) N/A N/A
PC Box Extension (PCBX) 1,344 N/A N/A
PC Pipe Extension (CPX) N/A N/A
Bridge Constrution Monthly/Annual Unit Cost Report 2013 2014 2015 Monthly Unit Cost 2015 Annual Unit Cost
No Common Bid Item Unit $/Unit $/Unit % +/- Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec E Est Qty $/Unit % +/-
1 Supply of H-Pile - Plain $/m 186 146 -21.5 190 144 191 195 294,514 1,573 187 28.2
2 Supply of H-Pile - Galvanized $/m 186 274 46.9 358 209 191 170,028 719 236 -13.6
3 H-Pile Setup $/pile 6,696 1,960 -70.7 1,777 1,348 2,198 3,930 1,034 290,756 164 1,773 -9.5
4 H-Pile Driving $/m 134 71 -46.5 130 34 55 242 49 176,270 2,197 80 12.3
5 Supply of Pipe Pile - Plain $/m 396 265 -33.2 429 238 180 52,166 207 252 -4.8
6 Supply of Pipe Pile - Galvanized $/m 707 454 -35.7 521 358 180 92,838 283 328 -27.8
7 Pipe Pile Setup $/pile 19,765 9,992 -49.4 1,756 3,930 68,225 24 2,843 -71.5
8 Pipe Pile Driving $/m 340 105 -69.2 145 247 73,012 394 185 77.2
9 Drilled Pile - Drill Rig Setup $/pile 5,651 N/A 7,314 3,560 101,230 20 5,061 N/A
10 Drilled Pile - Pile Installation $/m 530 651 22.9 641 61,547 96 641 -1.5
11 Supply of Reinforcing Steel - Plain $/kg 1.80 1.94 7.7 2.40 1.93 1.21 59,047 39,896 1.48 -23.8
12 Supply of Reinforcing Steel - Epoxy-coated $/kg N/A 4.14 2,069 500 4.14 N/A
13 Supply of Reinforcing Steel - Stainless $/kg 7.51 6.76 -10.0 7.84 12.49 21,682 1,985 10.92 61.6
14 Supply of Reinforcing Steel - Galvanized $/kg N/A N/A
15 Supply of Reinforcing Steel - Corrsion Resistant $/kg 4.35 5.27 21.2 5.50 4.84 3.74 350,079 84,023 4.17 -20.9
16 Placement of Reinforcing Steel $/kg 1.54 1.60 3.6 2.27 1.85 1.80 1.10 173,050 126,404 1.37 -14.2
17 Concrete - Pile $/m3 578 448 -22.5 599 1,267 641 136,797 160 855 90.8
18 Concrete - Class C $/m3 1,659 919 -44.6 1,408 3,188 2,738 1,518 424,832 224 1,897 106.5
19 Concrete - Class HPC $/m3 2,050 2,019 -1.5 2,388 1,970 994,510 477 2,085 3.2
20 Concrete - Class B $/m3 N/A N/A
21 Concrete - Class D $/m3 N/A N/A
22 Concrete - Class S $/m3 N/A N/A
23 Steel Girders & Assoc Materials $/t 4,534 N/A 4,542 1,431,550 315 4,542 N/A
24 Supply, Delivery and Erection of WG Girders $/lm 4,827 N/A N/A
25 Supply, Delivery and Erection of NU Girders $/lm 4,744 N/A N/A
26 Supply, Delivery and Erection of Bulb-T Girders $/lm N/A N/A
27 Supply, Delivery and Erection of SLC Girders $/lm 2,339 1,708 -27.0 1,686 1,114 1,138,233 724 1,572 -7.9
28 Supply, Delivery and Erection of SL, SLW Girders $/lm 1,686 1,461 -13.4 1,390 1,346 1,072 1,164,742 924 1,261 -13.7
29 Supply of Deck Joint Assemblies Strip Seal $/m 1,136 N/A N/A
30 Supply of Deck Joint Assemblies Cover Plated $/m N/A N/A
31 Supply of Deck Joint Assemblies Finger Plate $/m 8,179 N/A N/A
32 Install of Deck Joint Assemblies Strip Seal $/m 1,366 N/A N/A
33 Install of Deck Joint Assemblies Cover Plated $/m N/A N/A
34 Install of Deck Joint Assemblies Finger Plate $/m 2,082 N/A N/A
35 Bridgerail - Thrie Beam $/m 342 351 2.6 450 428 373 343 167,905 438 383 9.2
36 Bridgerail - Double Tube $/m 512 530 3.6 427 328 136,211 365 373 -29.6
37 Bridgerail - Single Tube Top Rail $/m N/A N/A
38 Pedestrain Handrail $/m N/A N/A
39 Concrete Slope Protection $/m2 N/A N/A
40 Deck Waterproofing $/m2 59 74 23.9 88 72 73 54 122,727 1,875 65 -11.1
41 ACP - H2 $/t 286 217 -23.9 376 217 148 266,693 1,198 223 2.5
42 ACP - M1 $/t 236 N/A N/A
43 MSE Wall $/m2 N/A N/A
Bridge Rehabilitation Monthly/Annual Unit Cost Report 2013 2014 2015 Monthly Unit Cost 2015 Annual Unit Cost
No Common Bid Items Unit $/unit $/unit %+/- Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec E Est Qty $/unit %+/-
1 Surface Removal m2 31 62 99.86 19 47 51 50 54 415,524 15,936 26 -58.08
2
2 Deck Sandblasting m 20 17 -14.6 16 16 24 73,370 4,371 17 -2.21
3 Partial Depth Repairs - Deck m2 661 497 -24.74 306 1,054 2,692 483 411 597 206,770 331 625 25.58
4 Partial Depth Repairs - Abutment m2 1,582 1,645 3.988 616 1,227 2,765 1,729 68,718 53 1,297 -21.18
2
5 Partial Depth Repairs - Pier m 1,788 4,292 140.1 1,040 1,524 2,995 1,911 71,896 45 1,598 -62.78
6 Partial Depth Repairs - Curb/Barrier/Parapet m2 1,157 1,237 6.935 623 1,339 833 1,714 687 99,221 89 1,115 -9.86
2
7 Partial Depth Repairs - Deck Underside m 1,771 2,182 23.18 893 1,452 1,451 3,153 2,675 166,097 124 1,339 -38.60
8 Full Depth Repairs m2 2,599 1,340 -48.46 1,053 1,276 952 1,310 2,836 103,069 65 1,586 18.37
9 Shear Key Repairs m 104 438 322.3 124 16,754 135 124 -71.64
10 Crack Repair - Gravity Fed Epoxy m 55 75 35.98 81 100 93 128 76,571 745 103 37.25
11 Crack Repair - Pressure Injected Epoxy m 683 547 -19.97 676 677 35,862 53 677 23.71
12 Supply Reinforcing Steel - Plain kg 2.03 1.47 -27.5 2.46 3.51 21,815 6,224 3.50 138.58
13 Supply Reinforcing Steel - Epoxy-coated kg N/A N/A
14 Supply Reinforcing Steel - Stainless Steel kg 6.36 N/A N/A
15 Supply Reinforcing Steel - Galvanized kg N/A N/A
16 Supply Reinforcing Steel - Corrosion Resistant kg 6.43 7.42 15.42 7.83 4.34 81,782 15,439 5.30 -28.58
17 Placement of Reinforcing Steel kg 1.41 1.51 7.393 2.00 2.69 1.33 40,101 21,663 1.85 22.29
18 Supply of Concrete - Class B m3 N/A N/A
19 Supply of Concrete - Class C m3 848 430 -49.25 N/A
20 Supply of Concrete - Class HPC m3 1,841 2,274 23.5 2,153 2,424 2,518 278,945 116 2,405 5.76
21 Deck Joint Replacement - Compression Seal m 970 N/A 926 69,425 75 926 -4.61
22 Deck Joint Replacement - Type 1 Strip Seal m 3,144 3,008 -4.332 2,226 5,255 2,506 2,818 617,700 233 2,646 -12.04
23 Deck Joint Replacement - Cover Plate Strip Seal m 7,076 8,642 22.13 7,382 6,693 4,953 626,847 94 6,655 -22.99
24 Deck Joint Replacement - Finger Plate m 8,044 N/A 14,626 139,683 10 14,626 N/A
25 Deck Joint Replacement - PMA m N/A N/A
26 Deck Overlay Concrete m3 1,455 1,254 -13.82 1,541 1,510 321,501 210 1,531 22.06
2
27 Placement Deck Overlay Concrete m 99 115 16.34 89 155 339,033 3,040 112 -3.02
28 Polymer Wearing Surface m2 161 163 1.141 N/A
29 Chipseal Coat on Bridge Deck m2 N/A N/A
30 Polymer Modified Asphalt m2 N/A N/A
31 Deck Waterproofing 76 74 -2.326 178 245 55 304,224 2,102 145 96.02
32 Asphalt Concrete Pavement - Mix Type H2 t 367 570 55.4 304 348 850 423 620,929 1,811 343 -39.84
33 Asphalt Concrete Pavement - Mix Type M1 t 561 440 -21.69 N/A
34 Bridgerail - Thriebeam m 339 N/A 498 53,292 107 498 N/A
35 Bridgerail - Double Tube m 536 N/A N/A
36 Bridgerail - Retrofit Bridgerail m 917 N/A N/A
37 Bridgerail - Double Layer W-Beam m 86 N/A 133 11,653 88 133 54.29
38 Bridgerail - Barrier Top Rail m N/A N/A
39 Approach Slab Void Grout m3 964 892 -7.448 2,797 27,972 10 2,797 213.49
3
40 Concrete Slope Protection - Replacement m 447 572 27.74 602 920 451 77,304 158 489 -14.39
41 Concrete Slope Protection - Void Grout unit 770 845 9.713 628 1,182 21,241 25 850 0.55
42 Lateral Stressing unit 9,197 N/A N/A
43 Underslung/Retrofit Diaphargm unit 11,636 N/A 19,376 116,256 6 19,376 N/A