Beruflich Dokumente
Kultur Dokumente
Contents:
1 Drive Test Procedure & Methodology ........................................................................................................ 3
2 Test Area .................................................................................................................................................... 6
2.1 Cluster Topology ............................................................................................................................. 6
2.2 Cluster Information ......................................................................................................................... 6
2.3 Site & Cell Information .................................................................................................................... 6
3 Performance Result.................................................................................................................................... 7
3.1 Cluster DT Based KPI Report - Pre and Post Swap .......................................................................... 7
3.2 Cluster OMC Based KPI Report- Pre and Post Swap ....................................................................... 8
DT Route
Drive-test Route shall be proposed to Vietnamobile for approval. No DT shall be conducted not
unless there is an approval from VNM. DT route should be detailed as possible to capture the full coverage
and quality of the network. Identify the route per clutter type: DU, U, SU, R
Procedure
a) Input entire network sites list, digital map and cluster border into MapInfo.
b) Create a map layer on digital map.
c) Keep the design and agree with customer.
A test route KPIs shall be selected as much as possible based on covered all the scenarios in this
test area, all the cells as much as possible, considered the actual conditions, one day working load.
If the customer has a predefined DT route, the DT route of KPIs shall cover the predefined DT route.
If the predefined DT route is not covered due to some objective factors, you need to describe this
case in time.
DT Tool Setup
All UEs are placed in the middle of the car. No UE shall be placed near the windows (front or side).
No external antenna shall be used.
The Drive Test will be done with TEMS (or any approved DT tool by VNM). Time for DT
measurement should be similar between Pre & Post swap. The maximum speed of the drive-test car is 40
km to 50 km per hour. Binning (10m x 10m in city, 50x50m out of city) shall be used for coverage and
quality DT KPIs.
Pre-DT:
Operator
Device Type of Call Mode Comment
Name
MS1 Voice Short VNM GSM only Dial 110 (60 sec duration & 5 sec gap)
MS2 Voice Long VNM GSM only Dial 110 (30 minutes duration & 10 sec gap)
MS3 Idle VNM GSM only
Post-DT:
Operator
Device Type of Call Mode Comment
Name
MS1 MS1 to MS5 (60 sec duration & 5 sec gap).
Voice Short VNM GSM only
(MO) Both phones should connect with TEMS.
MS2 Voice Long VNM GSM only Dial 110 (30 minutes duration & 10 sec gap)
MS3 Idle VNM GSM only
Download a file (10MB) from FTP server
MS4 Data Drive VNM GSM only (10.10.50.162), after finished, the test will
repeat until finish the whole test route.
MS5 (MT) Voice Short VNM GSM only Call receive from MS1
DT Legend
Rx Level
0 to -65 dBm
-65 to -75 dBm
-75 to -85 dBm
-85 to -95 dBm
-95 to -105 dBm
above -105 dBm (or no coverage)
Rx Quality
0-6
6-8
no service
CI Plot
Above 12
10-12
6-10
0-6
Throughput
2 Test Area
2.1 Cluster Topology
Cluster means a group of sites (Normally 20-25 sites) which are geographically neighboring sites.
The actual site number of each cluster should be flexible to allow a fast rollout and acceptance. The cluster
definition and drive test route will be planned in advance and mutually agreed by both parties.
3 Performance Result
Results
2G KPI Pre-DT Post-DT
(PASS/FAIL)
Remark
# Call Attempts
# Call Fails
Call Setup Success Rate (%)
# Call Drops
Call Drop Rate (%)
Cannot compare because Pre DT MOC
Call Setup Time (s) N/A
to 110 while Post DT MOC to Mobile.
Handover Attempts
Handover Fails
Handover Success Rate (%)
Rx Level (>-85dBm) (%)
Rx Quality (< 6) (%)
C/I (>10) (%)
Data Throughput (Kbps) N/A Data call only in Post DT
Coding Scheme Distribution
N/A Data call only in Post DT
(MCS >5, CS >2)
Overall Remarks:
1.
2.
3.
3.2 Cluster OMC Based KPI Report- Pre and Post Swap
Overall Remarks:
1.
2.
3.
PRE POST
PRE POST
PRE POST
PRE POST
Data Throughput
PRE POST
N/A
Percentage Cumulation
PRE POST
CS Traffic(2+3G)