Sie sind auf Seite 1von 1

.

C
O
N
T
R PROJECT TITLE
A
C Transmittal
T
O
Project:
R TRANSMITTAL NO: JOB-0000
Client: Date:
Recipient:
L
Attention:
O
G
WE O
ARE SENDING SUBMITTED FOR ACTION TAKEN
☐ SHOP DRAWINGS ☒ APPROVAL ☐ APPROVED AS SUBMITTED
A
☐ ☐ ☐
NLETTER GENERAL YOUR ACTION APPROVED WITH COMMENTS
☐ DPRINTS ☐ AS REQUESTED ☐ REVISE AND RESUBMIT
☐ CHANGE ORDER ☐ FOR INFORMATION ☐ REJECTED
☐ PLANS ☐ VERIFY SUBSTRUCTURE DESIGN ☐ NOT REVIEWED
NSAMPLES


ASPECIFICATIONS
☒ MOTHERS (INSPECTION REQUEST)
E

NO. REFERENCE NO. DESCRIPTION

1 IR-0000

REMARKS

ISSUED BY: RECEIVED BY: RECEIVED BY: RECEIVED BY:

CONTRACTOR CONSULTANT CLIENT

SIGNED: SIGNED: SIGNED:

DATE: DATE: DATE:

www.qualityengineersguide.com

www.qualityengineersguide.com

Das könnte Ihnen auch gefallen