© 2013
Five Years
BIM ProjectIdentifying
Execution Goals and Uses Procedure
Planning
BIM Goals
and Uses
Process
Information
Exchanges
Infrastructure
From Project to Organization
INTEGRATING BIM INTO AN ORGANIZATION
Organizational BIM Assessment Profile
Level of Maturity Totals
Strategy 0
Non-Existent
1
Initial
2
Managed
3
Defined
4
Quantitatively
5
Optimizing
Current Target Possible
No Basic Established Organization
Mission address Goals are specific, Mission and Goals are
Planning Team 5
Decisions are
0 3
Planning Committee includes members for
Planning Committee with formalized but not
established with all level of the
only those inclusive of all integrated with
Committee members from all organization including
organizational
interested in BIM operating units operative units executives
established Strategic Planning
Uses 0
Non-Existent
1
Initial
2
Managed
3
Defined
4
Quantitatively
5
Optimizing
Current Target Possible
Extensive use of
No BIM Uses No BIM Uses Minimal Owner Extensive use of Open sharing of
BIM with sharing
Operational Uses 1 2 5
BIM data maintained
Built) BIM imported or directly integrated
for Operations referenced for
maintained for
with operational
with operational
model received operational uses systems in Real-time
identified operational uses systems
by operations
Process 0
Non-Existent
1
Initial
2
Managed
3
Defined
4
Quantitatively
5
Optimizing
Current Target Possible
Detailed BIM
No external High-level BIM Integrated High Detailed BIM Detailed BIM Process
Operation Processes 0 2 5
organizational level Process Documented and
Documented for organizational for primary Regularly
BIM Processes each operating Process organizational Documented
Maintained and
Documented unit documented Uses for all BIM Uses Updated
Model Element Breakdown LoD Facility Data Notes
01 SUBSTRUCTURE 100
01 10 Foundations LoD
01 10 10 Standard Foundations LoD
01 10 20 Special Foundations LoD
01 20 Subgrade Enclosures LoD
01 20 10 Walls for Subgrade Enclosures LoD
01 40 Slabs-On-Grade LoD
01 40 10 Standard Slabs-On-Grade LoD
01 40 20 Structural Slabs-On-Grade LoD
01 40 30 Slab Trenches LoD
01 40 40 Pits and Bases LoD
Slab-On-Grade Supplementary
01 40 50 LoD
Components
01 60 Water and Gas Mitigation LoD
01 60 10 Building Subdrainage LoD
01 60 20 Off-Gassing Mitigation LoD
01 90 Substructure Related Activities LoD
01 90 10 Substructure Excavation LoD
01 90 20 Construction Dewatering LoD
01 90 30 Excavation Support LoD
01 90 40 Soil Treatment LoD
02 SHELL LoD
02 10 Superstructure LoD
02 10 10 Floor Construction LoD
02 10 20 Roof Construction LoD
02 10 30 Stairs LoD
02 20 Exterior Vertical Enclosures LoD
BIM PLANNING ELEMENTS
The Purpose of BIM Implementation
Strategy
Mission – Vision – Goals - Objectives
YOU BOARD
Renée Tietjen
Xiajun Lin
Robert Braunagel Craig Dubler
Steve Kundich
Patrick Suermann
Dianne Davis
Kurt Maldovan Kerry Joels Kimberly Hurtado
Russell Manning Grace Wang
Maureen McDonough Steve Devitto
Dan Weiger
Eric Nulton
AUTHORS
Colleen Kasprzak
Chimay Anumba
Shane Goodman
Ashwin Ramesh
John Messner Kim Price
bim.psu.edu