Sie sind auf Seite 1von 5

PROJECT / CONTRACT REF.

: 3111 / GC 11106400
CONTRACT TITLE: -

EPIC FOR UPGRADE OF ANTI-SURGE AND TURBINE


CONTROLS AT KHATIYA NORTH,KHATIYA MAIN,FAHAHIL
MAIN,JALEHA & RG PLANTS.

DOCUMENT TITLE :

JOB SAFETY ANALYSIS FOR


CABLE GLANDING AND WIRING TERMINATION WORKS

EPIC CONTRACTOR :

IMCO Engineering & Construction Company W.L.L.


P.O. Box: 22803 Doha, Qatar
Tel: (+974) 44667903/10/24 Fax: (+974) 44667905

27.12.11 A ISSUED FOR AFC FT SUK AEJ

20.10.11 0 ISSUED FOR REVIEW / COMMENTS FT SUK AEJ

REV. APPD.
DATE NO. REASON FOR REVISION PREPARED CHECKED APPD. Q.P.

DOCUMENT NUMBER. 3315-RG-3-17-0001 SHT. 01 OF 5 REV. A

DOC. NO.: 3315-RG-3-17-0001 REV. A Page 1 of 5


Job Safety Analysis (JSA) Worksheet

Work Title Cable Glanding & Wiring Termination Date: November 20, 2011
5 4 3 2 1 `
8 Evaluation Points Severity Factors Probability Factors Abbreviation
6 40-20 High Risk 8 : Fatality, Permanent Disability 5 : Extremely High E.P : Evaluation Points
4
2 19-12 Medium Risk 6 : Serious Injury(LD> 30days) 4 : Highly Probable S : Severity Factor

1
11-5 Low Risk 4 : Major Injury(30>LD>4 days) 3 : Probable P : Probability Factor

4-1 Negligible 2 : Minor Injury (4>LD>1 day) 2 : Rare T : Total Points

1 : No Lost time Injury 1 : Very Rare LD : Lost Workdays

Target
Risk E.P
Work Item Risk Foreseen during Work Risk Reduction Measures E.P
S×P=T
S×P=T
1. Work permit from  Unauthorized commencement of works may 4 x 3 = 12  Authorized PTW holder shall ensure obtaining 1x2=2
QP to be obtained result in exposing workers and or potential to and maintaining valid work permit.
harm or danger.  The worksite supervisor responsible for this
activity has to check the PPE of his staff to
ensure that all required items are available
and properly used.
 Inform all workers regarding permit condition
before work starts.
 Worksite supervisor shall conduct toolbox
talks about nature of works and associated
potential hazards and their essential
precautionary measure.

DOC. NO.: 3315-RG-3-17-0001 REV. A Page 2 of 5


Job Safety Analysis (JSA) Worksheet

Work Title Cable Glanding & Wiring Termination Date: November 20, 2011

 Delay to schedule 4 x 3 = 12  Follow mobilization schedule and arrange the 1x2=2


required document to avoid any cause of
delay.
2. Ensure all staff  Incorrect PPE given out or failure to provide 4 x 3 = 12  The supervisor responsible for this activity has 1x2=2
involved in this required PPE. to check the PPE of his staff to ensure all
activity has the required items are available and correctly
correct PPE and used.
have received the  Staff is not adequately briefed on the activity, the 4 x 3 = 12  The supervisor with the assistance of the 1x2=2
pre start briefing. risks or the emergency procedures leading to HSE officer shall give a pre start briefing to
increased risk of incident all staff involved pointing out the job steps
and how they will be conducted. The staff
shall be told the emergency procedure
should there be any incident during this
activity.
3.Cable glanding  Physical injuries due to slips, trips and fall 6 x 4 = 24  Keep working platform clear of debris or liquid 1x2=2
and termination spills. If a spill can’t be cleaned immediately,
cordon the area and keep sign to warn others
of the potential hazard.
 Keep tools and equipment in a safe side and
not scattered on the platform.
 Short circuit on wiring connection that will cause 6 x 4 = 24  Use insulated terminal screw while removing 1x2=2
of electrocution. the wire connection
 Ensure that the power supply is shutting off
before will proceed to disconnect the wire
 Keep tape isolation for the terminal wiring
after removing to the connection
 Fall of workers 6 x 4 = 24  Ensure to make a proper platform wich is 1x2=2
established to safe working platform.
 Use fall arrest system and ensure a 100% tie
off while working at heights.
 Ensure that platforms are safe to use.

DOC. NO.: 3315-RG-3-17-0001 REV. A Page 3 of 5


Job Safety Analysis (JSA) Worksheet

Work Title Cable Glanding & Wiring Termination Date: November 20, 2011

 Minor cut wound 4 x 3 = 12  Ensure that all staff is issued with adequate 1x2=2
hand gloves to avoid cut wounds. .
 Injury from hand tools 4 x 3 = 12  Only use appropriate tools that are in good 1x2=2
condition and use them in a correct manner.
4. Working in dusty  Dust causing for respiratory and eye decease. 6 x 4 = 24  Use appropriate dust mask or P1 is suitable 1x2=2
area
for dust particulates.
 Use water suppression for controlling dust
at the area
5. Work during  Heat Stress, Stroke, Exhaustion/ Fatigue 3 x 4 = 12  100% availability of cold drinking water at 1x2=2
extreme weather/ site, provision of rehydration drink is highly
climate recommended during high humidity;
 Resting shed shall be provided for the
workers;
 Frequent rest cycle to be implemented when
necessary;
 Supervisors/ HSE shall closely monitor
condition of workers, intervene when
necessary.
6. Housekeeping  Debris causing Slips, Trips and falls 3 x 5 = 15  Regular housekeeping at site shall be 1x2=2
performed. Adequate and correct stacking of
materials. Regular inspection and immediate
corrective action; Keep walkways clear of
obstruction
 Materials falling from height 3 x 5 = 15  Regular housekeeping, inspection and 1x2=2
corrective action; Ensure toe boards are
properly installed on platforms; Adequate
stacking/ storage of materials at height; do
not overload platforms

DOC. NO.: 3315-RG-3-17-0001 REV. A Page 4 of 5


Job Safety Analysis (JSA) Worksheet

Work Title Cable Glanding & Wiring Termination Date: November 20, 2011

 Fire risk due to presence of combustible debris 3 x 4 = 12  Regular clearing of worksite shall be 1x2=2
implemented; Waste bins with cover shall be
provided for oily rags; Flammable materials
shall be stored separately away from
possible ignition source; Minimal inventory to
be stored at work area; Appropriate fire
extinguisher shall be provided, when
necessary
 Keep 9kg dry powder fire extinguisher to the
area during excavation activities.
 Infestation of rodents leading to equipment & 3 x 4 = 12  Daily housekeeping shall be done; Closed 1x2=2
materials damage (Cables, cords, documents, bins for food wastes; Food wastes shall be
etc) removed ASAP

IMCO Site Engineer IMCO HSE Manager IMCO Project Manager QP Focal Point QP Safety
Prepared by: Reviewed by: Approved by: Acknowledged by: Approved by:

DOC. NO.: 3315-RG-3-17-0001 REV. A Page 5 of 5