Sie sind auf Seite 1von 9

Mr. Jose ManueRodriguezHernandez B.E.

(CIVIL)
Comalcalco, Tabasco, México.
Tel:933-164-5109
Correo: rodriguez2208jmanuel@gmail.com
LinkedIn: www.linkedin.com/in/jose-manuel-rodriguez-hernandez-451797128
Skype: live:c15198ff08c8afef

SSN: 83977940275

Profession : Civil Engineer

Nationality: Mexican

Age: 37

Marital Status : Married

Languages Known: English

Driving licence: Yes

Meticulous Civil Engineer who performs complex tasks, meets the strictest deadlines and offers a superior
performance that is always motivated. He has practical knowledge in Oíl and Gas construction. Apply good
planning and analytical skills to inform on the management of innovative ideas to reduce business expenses.
He works with a strong sense of urgency and thrives in an environment of accelerated pace. A person with a
strong passion for creativity & innovation.

EXPERIENCE INDUSTRIAL SECURITY

Rig Pass, Process Safety Management, Safe Worker in Heights, Applicant of Permits with Risks, Methodology
of the AST, Communication of risks and handling of dangerous chemical substances, H2S and use of
autonomous equipment, first response to incidents with hazardous materials level I, 12 Best International
Practices and operational discipline, Defensive Driving Course, effective safety audits, first aid, search and
rescue, STOP methodology, HSEQ audits.

Career Summary

Assurance of the integrity and reliability of the hydrocarbon transport system by pipeline. Engineering,
procurement and construction for the stabilization and recovery of 300 meters of beach. Engineering,
procurement, construction and commissioning of a congenital water treatment plant for 100 MBPD coming
from the desalination of Mayan crude. Service of Supervision and Quality Control of the works of Inspection,
Rehabilitation and Certification of Pipelines. Inspection, Rehabilitation and Certification to pipelines.
Rehabilitation of lines of different diameters and construction of reinforced concrete rack in the line corridor.
Preventive maintenance to pipelines. Corrective Maintenance to Pipelines. Construction of tubular bridge.
Concrete construction prestressed bridge.

ADMINISTRATIVE: Work control, programming and planning, Evaluation of Construction Alternatives,


Personnel Coordination, Management Reports, Contract Tracking, Continuous Improvement of Processes,
Evaluation of Inspection Reports of Non-destructive Tests, Work Generators, Estimates of work, Budgets,
Coordination authorization of volumes for collection, Log of work, compliance with standards and procedures,
costs and unit prices, evaluation of quality control reports, approve application of contracts, working minutes,
Integrate project books.
SKILLS AND KNOWLEDGE: Cost report • Relations with clients • Strategic planning • Information
processing • Decision making • Forecasting • Versatility • Negotiation skills • Innovation capacity • Organized
• Methodical
• Law and regulation regarding Public Works • PEMEX Reference Standards • AutoCAD • Parcel Office
(Excell, Power Point, Word, Project) • ASME B31-3, B31-4 ASME, ASMES B31-8, STANDARD API -1104
• Supervision of non-destructive tests • Supervision of the SMAW welding process

PROFESSIONAL INTERESTS: Engineering and manufacturing, Mining and extraction, Commercial Projects,
Specialized project in the Oil and Gas sector, Research and development, Automotive industry, Offshore
projects, Oil well management.

PROFESSIONAL EXPERIENCE

6/10/17 - 31/12/17
CEEMSA SA DE CV
Contract: 425023808

Supervisor/resident in the contract of preventive maintenance on pipelines and rights-of-way of the GTDH
operating sectors of the southern region, sector Cárdenas Package #2

ACTIVITIES: - Repair of mechanical coating of the Old 36"dia. L-1 Dos Bocas - Mystery and the Old 36"dia.
L-2 Dos Bocas - Chestnut.

- Repair of pipes with bipartidas type B metal enclosures of the Old 36"dia. L-1 Dos Bocas - Mystery and the
Old 36"dia. L-2 Dos Bocas - Chestnut.

Responsibilities: - Elaboration and presentation of programs of works before customers(Pemex).


- To coordinate, implement and evaluate weekly work schedule.
- Perform technical weekly reports on the progress of work.
- Go to operational meetings with the customer to standardize differences of construction procedures.
- Participate and present industrial safety reports on a weekly basis.
- Plan and coordinate movement of personnel, machinery and equipment.
- Perform daily reports with volume executed for their collection.
- Present and reconcile with client volumes executed.
- Management of permissions of jobs at risk in the field
- to participate in daily and effective audits in drills of risks.

FEB / 2011-JUN / 2016 Contract No. 420409851


NORPOWER S.A DE C.V.

Field Resident Civil-Mechanical Works to ducts of the Hydrocarbon Distribution Management in the contract
for the assurance of the Integrity and Reliability of the HYDROCARBONS TRANSPORTATION SYSTEM
BY PEP DEPT, SYSTEM 3

ACTIVITIES
– Dismantling of 17 out of operation ducts packed and inerted.
- Replacement of 54 gates, spherical valves.
- Construction of 12 "interconnections. At CPG New Pemex - AT Km 74 Cd. Pemex Nvo. Pemex.
- Construction of retaining wall in AT Samaria II to avoid the displacement of traps with slope protection with
geotextile and reinforced concrete.
- Construction of connections with 12 "Ø pipe diameters traps to gas processing centers.
- Repair of 05 Landslides in DDV that house PEMEX ducts.
- Directional junction of 600 ml of Pipeline 10 "TDE Tepetitan - TDR CPG Cd Pemex en rio.
- Correlation and repair of 500 indications in PEMEX ducts with metal enclosures.
- Rehabilitation of 30 surface installations that house PEMEX ducts.
- Inspection with guided waves of 300 connections.

RESPONSIBILITIES –
Prepare and supervise compliance with the work schedule for the Work.
- Maintain relationships with PEMEX and subcontractors.
- Evaluate alternatives and support in making decisions about technical aspects of the work.
- Coordinate personnel according to the needs.
- Carry out readings of plans and organize the execution of them.
- Measure and periodically issue management reports and progress of the work
- Verify on site compliance with time, materials and personnel.
- Follow up on contracts.
- Coordinate and supervise the operating personnel in order to fulfill the work assigned to each one in the
corresponding position.
- Perform weekly audits of Hygiene, Safety and Environment (HSE).
- Verify that the materials, tools, equipment and machinery to be used are complete and in good condition in
order to avoid delays and accidents.
- Participate in the continuous improvement of processes and working conditions with the objective of
minimizing time and cost.
- Ensure that personnel comply with the safety, health and environmental requirements of Annex S to maintain
their physical integrity;
- Review the production log at the beginning of the day and make the relevant annotations at the end of the
shift;
- Participate in the Production meetings and follow up on the urgent work for the client.
- Review and coordinate with PEMEX the authorization of volumes for collection.
- Verify stability of excavations to avoid risks to personnel entering.
- Review of work permits with risks.
- Review of reports of visual inspection, thickness measurement, straight beam, angular beam.

NOV / 2010-FEB / 2011 Contract No. 420840801


COMERCIALIZADORA Y DISTRIBUIDORA MARSA S.A. DE C.V.

Civil Resident for the Engineering, procurement and construction contract for the stabilization and recovery
of 300 meters of beach at the Dos Bocas Maritime Terminal (TMDB), Tabasco.

ACTIVITIES –
Construction of fence and perimeter path in the TMDB beach area reinforcing the slopes with geo textile
mesh anti erosion.
- Construction of anchoring dead for the reinforcement of CB-700 elevated burners by placing steel
pipepiles filled with concrete with concrete resistant to corrosion by seawater.

RESPONSIBILITIES –
Prepare and supervise compliance with the work schedule for the Work.
- Maintain relationships with PEMEX.
- Coordinate personnel according to the needs.
- Measure and periodically issue management reports and progress of the work
- Verify on site compliance with time, materials and personnel.
- Perform weekly audits of Hygiene, Safety and Environment (HSE);
- Verify that the materials, tools, equipment and machinery to be used are complete and in good condition
conditions in order to avoid delays and accidents.
- Ensure that personnel comply with the safety, health and environmental requirements of Annex S to
maintain their physical integrity;
- Review and coordinate with PEMEX the authorization of volumes for collection.
- Review of work permits with risks.
JUL / 2010-OCT / 2010 Contract No. 420908805
GUTSA INFRAESTRUCTURA DE MEXICO S.A DE C.V. / INFRASTRUCTURE PROJECTS AND
DEVELOPMENTS S.A. DE C.V.

A Engineer for the contract of Engineering, procure, construction and start-up of a congenital water
treatment plant for 100 MBPD from the desalination of Mayan crude, at the maritime terminal of dos
bocas (phase III), Tabasco.

ACTIVITIES
- Control room construction
- Construction of bridge of rack of pipes, supports and mochetas, foundation for transfer pumps and
tank accumulator.
- Construction of a shed for compressors and nitrogen equipment.
- Construction of trenches and drainages.
- Construction of a pump shed.
- Construction of drainage system.

RESPONSIBILITIES
- Verify in the field the constructive processes to avoid hidden defects.
- Solve problems, unforeseen events and avoid conflicts between field staff.
- Updating of construction plans with engineering personnel.
- Prepare and supervise compliance with the work schedule for the Work.
- Measure and periodically issue management reports and progress of the work
- Review of work permits with risks.
- Review of reports of visual inspection, thickness measurement, straight beam, angular beam.
- Support in updating unit prices.
- Dissemination of daily security issues before starting activities.
- Check that there are no uncollected volumes and generate generators of what is missing in civil and
mechanical works.
- Review of concrete quality control reports.
- Verify in the field and documentally that the activities comply with the scope of the contract.
- Review of Annex C and cross-checking with engineering to corroborate the quantification of
materials, instruments and equip relationate to Instrumentation, Security and Telecommunications.

JUL / 2008-JUL / 2010 Contract No. 5000005725


ENERGY MAINTENANCE SERVICES GROUP I, LLC AND EMS ENERGY SERVICES MEXICO,
S. DE R.L. (EMS México) SYSTEM 4.

Field president ducts of the Hydrocarbons and Integral Asset Management Division Bellota -Jujo in the
contract for the ASSURANCE OF THE INTEGRITY AND RELIABILITY OF THE
TRANSPORTATION SYSTEM OF HYDROCARBONS BY PEP DE PUCTE, SISTEMA 4.

ACTIVITIES
- Anticorrosive protection to 90 superficial installations
.- Preventive maintenance to 49 rights of roads where hydrocarbon pipelines are housed
.- Maintenance to 90 accesses to superficial installations
.- Rehabilitation of civil works of 90 superficial installations.
Repair of 02 leaks and 03 clandestine outlets.
Dismantling of 22 out of operation ducts packed and inerted.
- Conditioning of 10 ducts out of temporary operation.
- Attention of 500 correlation / inspection of indications detected with instrumented equipment.
- Inspection of ducts and surface installations with non-destructive tests.
- Modification and / or replacement of ducts and process lines enter shallow and superficial.
- Replacement of gates, spherical, male and check valves.
- Repair of indications with metallic enclosures.
- Replacement of corrosion protection in buried and submerged ducts.
- Lowering and closing oof ducts in operation.

RESPONSABILITIES
- Elaborate and supervise the compliance with the work schedule for the Work.
- Measure and periodically issue management reports and progress of the work.
- Verify and monitor compliance with the scope of the contract and applicable standards.
- Perform weekly audits of Hygiene, Safety and Environment (HSE)
- Verify that the materials, tools, equipment and machinery to be used are complete and in good condition
in order to avoid delays and accidents
.- Participate in the continuous improvement of processes and working conditions with the objective to
minimize time and cost
.- Review and signature of work generators.
- Review and coordinate with PEMEX
.- Verify stability of excavations to avoid risks to personnel entering.
- Review and signing of work permits with risks.
- Review and delivery of non-destructive testing reports.
- Review and delivery of project books.

JAN/ 2007 JUL / 2008 Specific Agreement No.425036832


PEP- Higher Technological Institute of Villa la Venta-ICAEND Supervision
Supervision of Corrosion (Campo Cárdenas, Mora, Chipilín) Supervision and Quality Control Service
of the Inspection, Rehabilitation and Certification of ducts the Integral Assets Macuspana and Bellota-
ACTIVITIES
- Supervision of lines and gas pipelines which includes the data collection of the different activities, as
well as pipes, equipment and accessories of the following concepts: Location of the topographic trace in
the field (axis and lateral limits of the right of way), Opening of right-of-way breach, Laying of pipe,
Welding in the joints of the b, X-ray of welded joints, field surveys of line data such as: joint number,
cast, no. Tube, patch, length of pipe, Patching of joints, Electrical test to the mechanical protection of the
joint, Opening of trench, Lowering of pipe and capping of the trench, Shaping of the land of the right of
way, Installation of devil traps Shipment and receipt, Cleaning of pipes through devils run, Hydrostatic
test of the line, Support for the preparation of daily and monthly reports of activities, Review of generators
of work.
- Supervision of maintenance of access roads which includes the data collection of the different activities
of the following concepts: Access roads, Well platforms, Concrete slabs (concrete application of 200 kg
/ cm2), Paved roads, A green areas.
- Supervision and monitoring during Inspection works based on non-destructive tests related to thickness
measurement, ultrasonic scanning (detection and evaluation of faults with straight beam and angular
beam).
- Supervision and surveillance during the decommissioning of ducts out of operation.

RESPONSABILTIES
- Document all the administrative and technical activities that allow to complement the necessary
information for the certification of the duct or installation.
- Review of isometric plans in the field delivered by the company for its validation and delivery to Pep.-
Review of quality certificates for materials, personnel and equipment.
- Management meeting with Pemex personnel, company and certifier to analyze the status, progress,
problems and solution alternatives, recording the agreements in the minutes taken.
- Delivery to PEP and certifying technical reports of works executed by the company.
- Testing of tests hi drostatics to pipelines with fittings and valves.- Integrate and keep up-to-date the
project books derived from the execution of the works.
- Monitor the proper execution of the works and transmit the orders coming from the residence to the
contractor in an appropriate and timely manner.
- Follow up the agreed execution program to inform the resident about the dates and critical activities that
require special follow up, as well as about the differences between the programmed activities and those
actually carried out, and for the application of economic retentions, conventional penalties, discounts or
the celebration of agreements.
- Record in the Log the progress and relevant aspects during the execution of the work.
- Hold work meetings with the superintendent or with the residence to analyze the status, progress,
problems and solution alternatives, consigning in the minutes and in the Logbook the agreements taken
and follow up to them
- Monitor that the contractor complies with the conditions of safety, hygiene and cleanliness of the work-
Review the estimates for the purposes of the residence authorizing them and, jointly with the contractor,
sign them in due time for the payment process, as well as check that these estimates include the respective
supporting documents
- Keep track of the quantities of work or service performed and those that are not to be executed,
quantifying them and reconciling them with the superintendence; for this, the supervision and the
superintendence should consider the concepts of the catalog contained in the proposal of the bidder to
whom the contract has been awarded, the additional quantities to said catalog and the concepts not
foreseen in it.
- To guarantee the quantities of the inputs and the yields of labor, machinery and equipment of the
concepts not provided for in the catalog of concepts contained in the proposal of the bidder to whom the
contract has been awarded, submitted by the contractor for the approval of the resident
- Verify that the plans are kept up-to-date, through the people assigned to that task.
- Analyze in detail the execution program agreed upon and considering, depending on the case, the supply
programs that the agency or entity has delivered to the contractor, referring to materials , machinery,
equipment, instruments and accessories of permanent installation
- Coadyuvar with the residence to monitor that the materials, labor, machinery and equipment are of the
quality and characteristics agreed in the contract, making sure that the contractor presents the laboratory
reports with their results in a timely manner- Schedule PND personnel for carry out activities according
to the request of the contractor

JUN / 2006-DEC /2006 Contract No. 425026928CIA.

Saint Martin Constructions S.A. DE C.V. (subcontract with cia.SSC)

-Residente (Cárdenas area) Inspection, Rehabilitation and Certification to the assets of Bellota - Jujo
Integral asset and / or other assets of the southern region. (Package 1)
ACTIVITIES
- Correlation of anomalies in pipelines, gas pipelines and gasoline pipelines of different diameters
- Replacement of anticorrosive protection in expansion frames, air passages of different diameters.
- Repair of critical indications with metallic and non-metallic envelopes.
- Dismantling of pipeline out of operation inertizada.
RESPONSABILITIES
- Prepare and monitor compliance with the work schedule for the work.
- Measure and issue periodic reports of progress of the work
- Review of work permits with risks.
- Coordinate and supervise the operating personnel with the In order to comply with the work assigned to
each one in the corresponding position.
- Perform weekly audits of Hygiene, Safety and Environment (HSE).
- Verify that the materials, tool, equipment and machinery to be used are complete and in good condition.
conditions in order to avoid delays and accidents.
- Coordinate and supervise personnel for the execution of daily activities.
- Talk with the owners before starting the activities to explain what is going to be done.
- Generate work generators

.ENE / 2006-JUN / 2006 Contract No. 425026802


CIA. Supplies, Services and Constructions S.A. of CV
Residente of work in Rehabilitation of lines of different diameters and construction of reinforced concrete
rack in the corridor of compressor line pared to battery paredón.

ACTIVITIES
- Dismantling of steel pipe to coal.
- Dismantling of valves class 600.
- Supply , manufacture and installation of blind seals (comales) class 300
- Cut with pipe cutter pipe ID 10-60
- Supply, handling and placement of pipes, flanges, valves, elbows, concentric reduction, tee.
- Butt and fillet welding.
- Supply, manufacture and installation of staple in carbon steel pipes
- Supply and installation of e Packs and studs in flanged joints.
- Supply, manufacture and placement of metal clamps
- Visual, mechanical and ultrasonic inspection of thicknesses to interface areas
- Hydrostatic tests to prefabricated pipes and valves.
- Ultrasonic inspection with failure detection in steel pipes
- Ultrasonic inspection with failure detection in process line welding
- Inspection by means of penetrating solder liquids
- Radiographic exposure with gamma rays in soldered joints of pipe and / or accessories
- Supply and installation of dielectric protection based on monolithic acid cement
- Application of anticorrosive system RP-6, RA-26 and RA-28.
- Elaboration and emptying of concrete f'c = 250
- Supply and placement of steel plates, clamps and anchors
.- Construction of concrete footings.-
Demolition of concrete

RESPONSIBILITIES
- Supervise and control the work of manufacturing and mechanical assemblies
- Perform l Logistic monitoring of the equipment and materials necessary for the Work
- Physical conditions of materials and equipment according to PEMEX specifications, as well as having
its quality certificate
.- Verify the maneuvers necessary for the installation of pipes according to plans of installation.
- Isometric survey of the corridor of lines inside and outside the Compressor and Wallon Battery.
- Delivery of plans in Autocad to the IPN for its validation and delivery to Pep
.- Verify the construction activities of the pipe arrangements according to plans, diagrams , applicable
specifications and construction procedures.
- Verify the application of sandblasting to white metal.
- Verify the application of the anticorrosive system according to the procedures provided by RAM-100.
- Supervise the performance of the wet film measurement , dry film, adhesion test and dielectric test.
- Application for permits for work with risks (authorized and validated).
- Signaling escape routes in case of emergency.
- Elaboration of estimates, budgets and assembly of records and personnel management. .
- Prepare and monitor compliance with the work schedule for the Work
. - Measure and issue periodic reports of progress of the work- Review of work permits with risks
. - Coordinate and supervise the operating personnel in order to comply with the work assigned to each
one.

ENE/2005-DEC/2005 Contract No. 415115006CIA.


Central of waterproofing and Constructions.

Auxiliary of Resident Preventive Maintenance to Ducts sector Cárdenas-Mora.

Construction of houses of cathodic protection. Support during the inspection and evaluation of anodic
beds. Maintenance to registration posts type R, IR, RA. Support during the installation of Fe-Si-CR
tubular anodes of 3 "Øx60" in length. Corrosion protection to the valve shaft of the Cardenas and Mora
wells. Location and sounding with metal detector in underground ducts. Ceiling in urban area in D.D.V.
of pipes that transport hydrocarbons. Celaje in rural area in D.D.V. of pipes that transport hydrocarbons.
Assistant in the design of cathodic protection systems. Realization of orders for works with risk type A
(red) and B (blue) according to SIPA specifications. Interpretation of plans and designs provided by the
Mexican Petroleum Institute. Elaboration of estimates, budgets and assembly of files and personnel
management.

JUN / 2004-DEC / 2004 Contract No.415124880CIA.

Group Constructor Global


Residente Corrective Maintenance to Pipelines sector Cárdenas-Mora.

Replacement of dielectric coating LDD10 "Ø Well Mora 2 - Battery Mora x 1.2 km.
Construction of three aerial steps in the pneumatic pumping network of 6" Ø km 0 + 388, km 2 + 044,
km 4 + 713.
Construction of three aerial passages and road crossings in the LDD 8 "Ø of the wells Cárdenas 308, 129,
318 a cabezal cárdenas 107.
Repair of two anomalies in connection with battery arrears to the trap of Shipment of the pipeline 12 "Ø
km 0 + 121, km 0 + 148 with metal enclosure.
Repair of two anomalies in connection of the reception trap to the northern battery of the pipeline 12" Ø
km 0 + 037, km 0 + 218 with enclosure metallic.
Correlation of detected anomalies with equipment instrumented in pipeline 12 "Ø battery mora - battery
north Cardenas.
Correlation of detected anomalies with equipment instrumented in gas pipeline 20 "Ø cardenas norte -
cárdenas sur
.Correlation of anomalies detected with equipment instrumented in gas pipeline 10" Ø battery Mora-
battery cardenas norte.
Correlation of detected anomalies with equipment instrumented in gasoline pipeline 8 "Ø battery
cardenas norte-paredón battery.
Reparation of two anomalies in connection of battery north Cardenas to the trap of sending the gas
pipeline 8" Ø km 0 + 072 battery cárdenas north-wall battery with non-metallic enclosure.
Adaptation of shipping traps and receipt of the pipeline 10 "Ø cabezal cárdenas 162-drum north cardenas.
Lifting of isometrics and realization of plans in Autocad for delivery to Pemex.
Testing of hydrostatic test valves, pipe arrangement.
Review, control and verify that the materials, labor, machinery and equipment are of the quality and
characteristics agreed in the contract.
Revision of generators, estimates and log of work.
Realization of orders for jobs with risk type A (red) and B (blue).
Review of generators, estimates and work log.
Realization of orders for works with risk type A (red) and B (blue) according to SIPA specifications.
Review of plans and designs provided by the National Polytechnic Institute, as well as the integrity
analysis, flexibility analysis and risk analysis.
Preparation of daily reports and sketches.
Assist in the calculation of a hot tapping, calculation of PMOP and remaining life for gas and liquids for
a duct.
Preparation of estimates, budgets and assembly of files and personnel management.

ENE / 2004-JUN / 2004

Technician in Engineering and Construction S.A.


Resident of Construction, Construction of tubular bridge of 33.60 x 30.0 Location 0037-R / a. José Ma.
Pino Suárez 2nd. Comalcalco Section, Tabasco.

Construction of tubular bridge with recovered steel pipe to coal, manufacture and driving of piles with
recovered steel pipe to coal, manufacture and placement of false heads with recovered steel pipe to carbon
ASTM A53 of 7 5/8 "ø, cedula 80, desazolve of channel on both sides of the bridge, formation and
compaction of embankments added with their wedges wide envelope.
Elaboration estimates, budgets and assembly of files and personnel management.

MAY / 2003-DEC / 2003

Corporativo Empresarial de Tabasco SA de CV


Construction Site Construction of a prestressed concrete bridge over a cuxcuxapa drain of 13.50 x 42.02
mt Reform road-2 bocas km 25 + 240.

Construction of a pre-stressed concrete bridge based on AASHTO Type IV, pre-reinforced. Supported on
concrete piles and heads, to ensure that the work is executed in accordance with the project and complying
with current regulations, with its specific and quality standards that guarantee the proper functioning of
the work. Verify that the transport and assembly of the different prefabricated elements are carried out in
accordance with the specific and general technical specifications contemplated in the Bidding Terms.
Permanently monitor that in the execution of the works the construction procedures delivered by the
designer or those that are carried out are applied. Implement during the construction process. Monitor that
the supervisors keep the record of plans and specifications of the project up to date, taking care that in the
documents that have been modified the adjustments made are recorded, the date of the modification, the
signature of the person authorizing and in parallel to adjust in the table construction costs, work quantities
to be executed and the corresponding programs. Preparation of estimates, budgets and assembly of records
and personnel management.

Das könnte Ihnen auch gefallen