Sie sind auf Seite 1von 2

TOWER -A DAILY PROGRESS REPO (SOM

DATE : 10/08/2018
FLOOR 1

Sl.no Description Dia Units Qty rmt MARKING


QTY NOS Taking

1 MS. pipe 150 RMT 30 5 0 0


2 MS. pipe 100 RMT 30 5 0
3 MS. pipe 80 RMT 60 10 0 13.07 rmt
4 MS. pipe 65 RMT 30 5 0 19.28 rmt
5 MS. pipe 50 RMT 150 25 0 10.13 rmt
6 MS. pipe 40 RMT 150 25 0
7 MS. pipe 32 RMT 0 0 0
8 MS. pipe 25 RMT 300 50 0

NOTE :- A)TODAY WE HAVE GOT ELECTRICITY POWER IN LUNCH TIME THROWOUT CLIENT. BEFORE LUNCH WE HAVE MARKING
B) FA/PA MARKING IS DONE FLOOR 1
C)FA/PA MARKING IS DONE FLOOR 2
TOWER- B DAILY PROGRESS REPO (SOM
DATE : 10/08/2018
FLOOR 1

Sl.no Description Dia Units Qty rmt MARKING


QTY NOS taking

1 MS. pipe 150 RMT 0 0 0


2 MS. pipe 100 RMT 0 0 0
3 MS. pipe 80 RMT 0 0 16 RMT
4 MS. pipe 65 RMT 0 0 14.5 RMT
5 MS. pipe 50 RMT 0 0 0
6 MS. pipe 40 RMT 0 0 2 RMT
7 MS. pipe 32 RMT 0 0 1.5 RMT
8 MS. pipe 25 RMT 0 0 6 RMT
ROGRESS REPO (SOMONDO PROJECTS)
FLOOR 1
Red Paint
Drilling &TieRod installing
Welding Hanging Redoxide 1st 2nd Total REMARKS
coating coating
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 12 RMT 0 0 0
0 0 0 18 RMT 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 78 RMT 0 0 0

EFORE LUNCH WE HAVE MARKING DONE TOWER B.

ROGRESS REPO (SOMONDO PROJECTS)


FLOOR 1
Red Paint
Drilling &TieRod installing
Welding Hanging Redoxide 1st 2nd Total REMARKS
coating coating
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 16
0 0 0 0 0 0 14.5
0 0 0 0 0 0 0
0 0 0 0 0 0 2
0 0 0 0 0 0 1.5
0 0 0 0 0 0 6

Das könnte Ihnen auch gefallen