Node: 1. Updating of piping and instrumentation on pellet deodorizing unit Drawings: 3443-XZ-DM- 581, 582; 3443-T-MF-0081 & 0100
Node: 2. Updating of piping and instrumentation on deodorized pellet dryer system Drawings: 3443-XZ-DM-582; 3443-T-MF-0081 & 0100
Node: 2. Updating of piping and instrumentation on deodorized pellet dryer system Drawings: 3443-XZ-DM-582; 3443-T-MF-0081 & 0100
Node: 3. Addition of knife valve and modification of logic downstream 2D 5102 Drawings: 3443-XZ-DM-511C; 3443-T-MF-0088
Node: 4. Addition of pressure transmitter and interlock on waste gas line of D4103 Drawings: 3443-XZ-DM-413; 3443-T-MF-0108
3443-XZ-DM-333B,681,681A; 3443-T-MF-
Node: 5. Addition of flare dip pot discharge 5D 6802 and pumps 5P 6801 A/B Drawings:
0122
6.1.2.1 5TAH68136
High flow of steam to flare Low level in case temperature
6 High Temperature 6.1 6.1.2
water seal reaches 100degC Safeguards against low level in
6.1.2.2
5D6802
7.1 Failure of heat tracing Increase of level in 5D6802 with 7.1.2.1 5TAL68136
possible overfilling leading to
7 Low Temperature 7.1.2
Extreme low ambient level and backpressure Safeguards against high level in
7.2 increase in flare system 7.1.2.2
temperature 5D6802
HDPE SPEEDBIRD PLANT SAFETY REPORT
ATTACHMENT 9.3 - HAZOP WORKSHEET CLOSE OUT SESSION
3443-SZ-RT-101 Attachment 9
Plant: 320 KT/Y HDPE Client: Basell Polyolefins Location: Münchsmünster Sheet 13 of 20 Issue 04
3443-XZ-DM-333B,681,681A; 3443-T-MF-
Node: 5. Addition of flare dip pot discharge 5D 6802 and pumps 5P 6801 A/B Drawings:
0122
Refrigeration Unit - Addition of 2nd Evaporator and 3rd Pump on cold hexane
Node: 6. Drawings: 3443-XZ-DM-611, 612, 612A, 614
distribution system
Refrigeration Unit - Addition of 2nd Evaporator and 3rd Pump on cold hexane
Node: 6. Drawings: 3443-XZ-DM-611, 612, 612A, 614
distribution system