Reduce losses production at December 31st, Lost PRD 2017 - Lost PDR 2018 = 30 BOPD
2018. If Value ≥ Cut off, (Value/Goal)*Weight
Maintain or reduce the cost by oil treatment in Oil treat. efficiency = Invest cost to Treatment Performed /
order to impact in lifting cost. Oil Barrels treated
BPT-1 CFO
BPT-2 COO
BPT-3 COO
BPT-4 CAO
BPT-5 COO
BPT-6 COO
BPT-7 CFO
BPT-8 COO
BPT-9 CAO
BPT-10 CEO
BPT-11 CFO
Activity -
BPT 1Q 2Q
Planning
Coordinator Update the curren
abandonment
Field
Services Remove Floating Do
Head
Admin. Retu
Head
Reservoir Managemen
Development Enhancement
Manager
Production Efficiency
Improveme
Production
Head
Production Optimiz
HR Head
3Q 4Q
ytime operations
Floating Docks
tion Optimization
Organization Transformation
nd Performance Management
Relationships and Communications Process with
Stakeholders.
4Q
Nov
S-21 S-22 S-23 S-24
TASKS
6 Organizational Transformation
Production Efficiency and Reliability
Coty 7 Improvements.
• Complete the assessment and analysis to recommend viability to keep operative only economic assets
(platforms and/or remote fields);
• Update the current plan for abandonment of already evaluated infrastructure to reduce complexity and
optimize operational practices;
Evaluate strategic business options to determine how to reduce complexity and focus organization on
material activities (to maximize value and minimize liabilities)
• Added items: simpler process/system, move to Talara, return of Petroperu assets
• Do the characterization of different reservoirs to have well adressed the static and dynamic models
• Make the full update of both, OOIP and Recovery Factor calculations
• Perform the analysis and proper assessment of alternatives for producing the remaining primary potential
(in-fill drilling, radial drilling, intensive workover/well servicing program), also projects of IOR/EOR (pilots of
gas/water injection) to potentially add fresh reserves
• Strenghten dynamics of work to focus all endeavors in Development site by appointing the limited
resources (personnel and tools) in most favorable opportunities to enhance our portfolio (Oil and Gas)
• Establish and / or modify the procedures and policies of cost distribution in Savia adjusted to this model.
• Implement cost distribution module in Spring ERP.
• Disseminate , training and implementation of these guidelines.
• Evaluation and monitoring of lifting cost optimization by reducing the assets that are not being positive for
SAVIA
• Make the plan to extensively analyze vessels utilization for production and maintenance routines;
thoroughly prepare a transformation of marine logistics process and measure its impact in direct operative
cost reduction
• Establish the base line and implementation plan to extend remote monitoring of production variables
at offshore facilities (defnition of principal/important ones) to control Wells performance, gas utilization, and
Pipeline integrity • Perform the appropriate analysis of real impacts
in elimination of night shifts and relocate personnel to avoid travels, optimizating personnel
• Perform an optimization analysis of Gas Lift system through simulation with specialized software, to carry
out the changes projected by the simulation and evaluation of the results of these changes.
• Improve the current maintenance strategy with reliability methodologies PMO (Preventive Maintenance
Optimization) & RCM (Reliability Centred Maintenance). Define Matrix CBM (Condition Based Maintenance)
& PdM (Predictive Maintenance). Implementing the RIM process (Reliability Information Maintenance).
Implement and develop the process of RCA (Root Causa Analysis).
• To construct a comprehensive plan to execute the maintenance work in decks level of those platforms
inspected already by ABS aiming to clear the set of observations arising from OSINERGMIN supervision
program on time to prevent any other shut down of production facilities.
• Comply with Pipeline adequacy plan to D.S. 081-2007-EM and MTP 2017-2023 abandonment & integrity
pipeline
• To review the need for structuring the vessels maintenance.
• New Organizational structure. four weeks 2. Sisters/ Service/ Subsidiaries companies Governance. •
Definition of Roles & Responsibilities.
• Sizing of New Organizational structure.
• Positions Valuation. 4 Semanas una vez se tengan los roles y responsabilidades.
• Human talent Policies. 4 Semanas. Es posible necesitar acompañamiento de Hay Group para actualizar la
práctica.
• Salary police
• Hiring police.
• Performance
• Key positions assessment. 4 Semanas.
1. Establish and / or modify the procedures and policies of quantify and tracking of the deferred production
in Savia.
2. Implement an new “ Production losses Report” in current Oracle Database with all the variables involved.
3. Disseminate , training and implementation of these guidelines.
4. Evaluation of information and tendencies for to obtain the priorization of the actions for to reduce
production deferred using the Root Cause Failure Analysis (RCA) process.
• Establish a comprehensive communication plan to reach in a simpler manner all levels of Organization
• Disseminate the main foundation of business plan and rationale behind strategy in development with KPI’s
and expectations in new structure definition
• Let everybody knows clearly the role of all people in transformation program and what is expected from
each one • Design a more effective Operational
Committee on weekly basis with more wide participation of operative people
• Establish a monthly Management Committee to follow up diverse elements on HSE, Operational update,
Budget execution, regulatory compliance, next month plans and bottle necking analysis
• Update the status of relevant discussions and actions being undertaken with major stakeholders
OSINERGMIN: Maintenance and integrity of platforms and pipelines, adequacy to SD 081
OEFA: Pipelines and facilities maintenance
PERUPETRO: Basket price negotiations, Blocks in force majeure, abandonment of infrastructure;
Development & Exploratory plans, Retention of areas, Gas business
PETROPERU: Lease assets negotiation, Sales of oil from Z2B and purcahses of diesel
SUNAT: Tax contingencies Savia´s Union: Collective bargaining; labor rights
before Labor Ministry supervision
Contractors: Marine supporters, Well Service, Maintenance, Surveillance, Catering, Metal work,
People of areas of influence: Negritos and Talara, Cabo Blanco, Sechura. Two months
• Appoint the focal points to manage relationships with stakehoders. One month
• Setting the work team formed by Account, Fiancial Planning, and Planning &
Control to establish an official (formal) procedure to cost distribution
• Get a consultant company to work on costs module in ERP Spring.
• Set team working by OPMAR, PROD, RRHH, ALEGAL, ABAS, P&C.
• Carry out simulation study in simulator ReO, for updating current simulation
model in Lobitos and implementing new simulation staudy in Peña Negra.
• Set a team working with specialists of Artificial Lift during simulation project, get
an experienced consultant in gas lift optimization to help in implementation of
improvements in ALS and energy consumption
• Secure to hire Gas Lift optimization Team to do complete routines in fields as
discussed, three for Peña Negra and three for Lobitos
• Ensure a strong legal support to adress all issues arising from contractual terms
interpretations
• Continuos monitoring on commitments and pending issues to be cleared or
adressed with any stakeholder
• Systematic reports of progress shall be made.