Beruflich Dokumente
Kultur Dokumente
2/23/2016
Contents
Introduction .................................................................................................................................................. 2
mTera Trial and Buy arrangement ................................................................................................................ 2
1.0 mTera BoM ....................................................................................................................................... 3
2.0 mTera and T7100 Physical Topology ................................................................................................ 4
3.0 mTera FP2.1 (with TNMS v15.10) features ...................................................................................... 5
4.0 List of Test Cases ............................................................................................................................... 6
5.0 Test Plan ............................................................................................................................................ 8
5.1 mTera Basic commissioning .......................................................................................................... 8
5.2 mTera management and control plane infrastructure setup ....................................................... 9
5.3 Non CP unprotected 10G circuit test (TGLAN, STM-64, OTU2) .................................................. 10
5.4 Non CP protected 10G circuit test (TGLAN, STM-64, OTU2)....................................................... 11
5.5 Non CP unprotected 100G circuit test (100GE, OTU4) ............................................................... 12
5.6 Non CP protected 100G circuit test (100GE, OTU4) ................................................................... 13
5.7 CP Reroute 10G circuit test (TGLAN, STM-64, OTU2) ................................................................. 14
5.8 CP Fulltime 10G circuit test (TGLAN, STM-64, OTU2) ................................................................. 15
5.9 CP Reroute 100G circuit test (TGLAN, STM-64, OTU2) ............................................................... 16
5.10 CP Fulltime 100G circuit test (100GE, OTU4) .............................................................................. 17
5.11 Unprotected EPL/E-LINE and EVPL circuit (10GE) ...................................................................... 18
5.12 Protected EPL and EVPL circuit (10GE) ....................................................................................... 19
5.13 Unprotected EPL and EVPL circuit (100GE)................................................................................. 20
5.14 Protected EPL and EVPL circuit (100GE) ..................................................................................... 21
5.15 Unprotected EPN/E-LAN/EPLAN and EVPN circuit (10GE)......................................................... 22
5.16 Unprotected EPN and EVPN circuit (100GE) ............................................................................... 23
5.17 Protected EPN and EVPN circuit (10GE)...................................................................................... 24
5.18 Protected EPN and EVPN circuit (100GE).................................................................................... 25
5.19 mTera Switch Fabric redundancy Test ........................................................................................ 26
5.20 mTera Hitless Software Upgrade ................................................................................................ 27
5.21 mTera SNMP MIB support (Ethernet Packet Performance Statistic) ......................................... 28
5.22 Power loss (full shelf) .................................................................................................................. 29
5.23 STPM removal/restoration ......................................................................................................... 30
5.24 Committed Information Rate (CIR) control................................................................................. 31
Introduction
As part of network expansion to accommodate rapid glowing of TdC’s wholesale and enterprise
customer demand, TdC and Coriant teams are working together to introduce Coriant next-generation
packet-optical platform – mTera into the CPCS network.
The mTera is an extremely flexible multi-service packet optical transport platform. It seamlessly
supports OTN, SDH and packet grooming as well as an advanced ROADM-based optical layer on a single
shelf. It is designed to handle many applications with minimal set of interface cards and to use every
port on every card to its full potential.
No Test items
1 mTera Basic commissioning
2 mTera management and control plane infrastructure setup
3 Non CP unprotected 10G circuit test (TGLAN, STM-64, OTU2)
4 Non CP protected 10G circuit test (TGLAN, STM-64, OTU2)
5 Non CP unprotected 100G circuit test (100GE, OTU4)
6 Non CP protected 100G circuit test (100GE, OTU4)
7 CP reroute 10G circuit test (TGLAN, STM-64, OTU2)
8 CP fulltime 10G circuit test (TGLAN, STM-64, OTU2)
9 CP reroute 100G circuit test (100GE, OTU4)
10 CP fulltime 100G circuit test (100GE, OTU4)
11 Unprotected EPL and EVPL circuit (10GE)
12 Protected EPL and EVPL circuit (10GE)
13 Unprotected EPL and EVPL circuit (100GE)
14 Protected EPL and EVPL circuit (100GE)
15 Unprotected EPN and EVPN circuit (10GE)
16 Unprotected EPN and EVPN circuit (100GE)
17 Protected EPN and EVPN circuit (10GE)
18 Protected EPN and EVPN circuit (100GE)
19 mTera Switch Fabric redundancy Test
20 mTera hitless software upgrade
21 mTera SNMP MIB support (Ethernet Packet Performance Statistic)
22 Power loss (full shelf)
23 STPM removal/restoration
24 Committed Information Rate (CIR) control
TdC Planning
Name:
Signature
Date:
TdC Operation
Name:
Signature:
Date:
5.0 Test Plan
Actual Passed
Results Failed
5.2 mTera management and control plane infrastructure setup
Item Description
Test ID 5-2 mTera management and control plane infrastructure setup
Objective To demonstrate mTera management and control plane infrastructure setup process
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision GCC0 links on all mTera TCFP interfaces
2 Establish/validate connectivity from TNMS to all NEs
3 Provision physical trails (TNMS) and adjacencies (NM) for circuit discovery
4 Provision CP infrastructure on mTera
Expected TNMS can access mTera and configure control plane parameters
results
Actual Passed
Results Failed
5.3 Non CP unprotected 10G circuit test (TGLAN, STM-64, OTU2)
Item Description
Test ID 5-3 Non CP unprotected 10G circuit test (TGLAN, STM-64, OTU2)
Objective To demonstrate mTera supports non CP unprotected 10GE, STM-64 and OTU2 circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision unprotected 10G circuit in TNMS from N1_MTERA to
N3_MTERA
2 Verify error-free alarm-free path with test set (a)
3 Perform circuit discovery in TNMS/Node Manager
4 De-provision circuit
5 Repeat as desired for TGLAN, STM64, and OTU2
Expected (a) TGLAN, STM-64 and OUT circuits created successfully with Zero bit error
results
Actual Passed
Results Failed
5.4 Non CP protected 10G circuit test (TGLAN, STM-64, OTU2)
Item Description
Test ID 5-4 Non CP protected 10G circuit test (TGLAN, STM-64, OTU2)
Objective To demonstrate mTera supports non CP protected 10GE, STM-64 and OTU2 circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision protected 10G circuit in TNMS from N1_MTERA to N3_MTERA
2 Verify error-free alarm-free path with test set (a)
3 Perform circuit discovery in TNMS/Node Manager
4 Perform a fiber cut in the working path and verify switch time is <60ms (b)
5 De-provision circuit
6 Repeat as desired for TGLAN, STM64, and OTU2
Expected a. Both working and protection TGLAN, STM-64 and OTU2 circuits created
results successfully.
b. TGLAN, STM-64 and OTU2 circuits switch over to protection path in <60ms
during fiber cut.
Actual Passed
Results Failed
5.5 Non CP unprotected 100G circuit test (100GE, OTU4)
Item Description
Test ID 5-5 Non CP unprotected 100G circuit test (100GE, OTU4)
Objective To demonstrate mTera supports non CP unprotected 100GEand OTU4 circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision unprotected 100G circuit in TNMS from N1_MTERA to
N3_MTERA
2 Verify error-free alarm-free path with test set (a)
3 Perform circuit discovery in TNMS/Node Manger
4 De-provision circuit
5 Repeat as desired for OTU4
Expected (a) 100GE and OTU4 circuits created successfully with Zero bit error
results
Actual Passed
Results Failed
5.6 Non CP protected 100G circuit test (100GE, OTU4)
Item Description
Test ID 5-1 Non CP protected 100G circuit test (100GE, OTU4)
Objective To demonstrate mTera supports non CP protected 100GEand OTU4 circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision protected 100G circuit in TNMS from N1_MTERA to N3_MTERA
2 Verify error-free alarm-free path with test set (a)
3 Perform a fiber cut in the working path and verify switch time is <60ms (b)
4 De-provision circuit
5 Repeat as desired for OTU4
Expected a. Both working and protection 100G and OTU4 circuits created successfully.
results b. 100G and OTU4 circuits switch over to protection path in <60ms during fiber cut.
Actual Passed
Results Failed
5.7 CP Reroute 10G circuit test (TGLAN, STM-64, OTU2)
Item Description
Test ID 5-7 CP reroute 10G circuit test (TGLAN, STM-64, OTU2)
Objective To demonstrate mTera supports CP reroute 10GE, STM-64 and OTU2 circuits
Prerequisite TNMS ready and mTera is up and running
Diagram
Actual Passed
Results Failed
5.8 CP Fulltime 10G circuit test (TGLAN, STM-64, OTU2)
Item Description
Test ID 5-7 CP fulltime 10G circuit test (TGLAN, STM-64, OTU2)
Objective To demonstrate mTera supports CP fulltime 10GE, STM-64 and OTU2 circuits
Prerequisite TNMS ready and mTera is up and running
Diagram
Actual Passed
Results Failed
5.9 CP Reroute 100G circuit test (TGLAN, STM-64, OTU2)
Item Description
Test ID 5-7 CP reroute 100G circuit test (100GE and OTU4)
Objective To demonstrate mTera supports CP unprotected 100GE and OTU4 circuits
Prerequisite TNMS ready and mTera is up and running
Diagram
Actual Passed
Results Failed
5.10 CP Fulltime 100G circuit test (100GE, OTU4)
Item Description
Test ID 5-7 CP Fulltime 100G circuit test (100GE, OTU4)
Objective To demonstrate mTera supports CP fulltime 100GE and OTU4 circuits
Prerequisite TNMS ready and mTera is up and running
Diagram
Actual Passed
Results Failed
5.11 Unprotected EPL/E-LINE and EVPL circuit (10GE)
Item Description
Test ID 5-11 Unprotected EPL and EVPL circuit (10GE)
Objective To demonstrate mTera supports 10GE unprotected EPL and EVPL circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision any needed ODUj’s, COS Class Maps, Meter Profiles, policers,
Policy Maps/Associations, and MAC interfaces. Resync the NEs, then re-
discover the packet configuration.
2 Create any needed L2/ethernet network links (if needed)
3 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
4 Select the ports which are the endpoints for the service. Click Next.
5a (EPL) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
5b (EVPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
6 Verify error-free traffic is flowing between the interfaces.
Actual Passed
Results Failed
5.12 Protected EPL and EVPL circuit (10GE)
Item Description
Test ID 5-12 Protected EPL and EVPL circuit (10GE)
Objective To demonstrate mTera supports 10GE protected EPL and EVPL circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Create any needed L2/ethernet network links (if needed)
2 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
3 Select the ports which are the endpoints for the service. Click Next.
4a (EPL) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
4b (EVPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
5 Verify error-free traffic is flowing between the interfaces.
6 Test protection switch times and verify switch times are <60ms
Actual Passed
Results Failed
5.13 Unprotected EPL and EVPL circuit (100GE)
Item Description
Test ID 5-13 Unprotected EPL and EVPL circuit (100GE)
Objective To demonstrate mTera supports 100GE unprotected EPL and EVPL circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision any needed ODUj’s, COS Class Maps, Meter Profiles, policers,
Policy Maps/Associations, and MAC interfaces. Resync the NEs, then re-
discover the packet configuration.
2 Create any needed L2/ethernet network links (if needed)
3 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
4 Select the ports which are the endpoints for the service. Click Next.
5a (EPL) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
5b (EVPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
6 Verify error-free traffic is flowing between the interfaces.
Actual Passed
Results Failed
5.14 Protected EPL and EVPL circuit (100GE)
Item Description
Test ID 5-14 Protected EPL and EVPL circuit (100GE)
Objective To demonstrate mTera supports 100GE protected EPL and EVPL circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Create any needed L2/ethernet network links (if needed)
2 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
3 Select the ports which are the endpoints for the service. Click Next.
4 Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
5a (EPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
5b (EVPL) Verify error-free traffic is flowing between the interfaces.
6 Test protection switch times and verify switch times are <60ms
Actual Passed
Results Failed
5.15 Unprotected EPN/E-LAN/EPLAN and EVPN circuit (10GE)
Item Description
Test ID 5-15 Unprotected EPN and EVPN circuit (10GE)
Objective To demonstrate mTera supports 10GE unprotected EPN and EVPN circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision any needed ODUj’s, COS Class Maps, Meter Profiles, policers,
Policy Maps/Associations, and MAC interfaces. Resync the NEs, then re-
discover the packet configuration.
2 Create any needed L2/ethernet network links (if needed)
3 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
4 Select the ports which are the endpoints for the service. Click Next.
5a (EPN) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
5b (EVPN) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
6 Verify error-free traffic is flowing among the interfaces.
Actual Passed
Results Failed
5.16 Unprotected EPN and EVPN circuit (100GE)
Item Description
Test ID 5-16 Unprotected EPN and EVPN circuit (100GE)
Objective To demonstrate mTera supports 100GE unprotected EPN and EVPN circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Provision any needed ODUj’s, COS Class Maps, Meter Profiles, policers,
Policy Maps/Associations, and MAC interfaces. Resync the NEs, then re-
discover the packet configuration.
2 Create any needed L2/ethernet network links (if needed)
3 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
4 Select the ports which are the endpoints for the service. Click Next.
5a (EPN) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
5b (EVPN) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
6 Verify error-free traffic is flowing among the interfaces.
Actual Passed
Results Failed
5.17 Protected EPN and EVPN circuit (10GE)
Item Description
Test ID 5-17 Protected EPN and EVPN circuit (10GE)
Objective To demonstrate mTera supports 10GE protected EPN and EVPN circuits
Prerequisite TNMS ready and mTera is up and running
Action 1 Create any needed L2/ethernet network links (if needed)
2 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
3 Select the ports which are the endpoints for the service. Click Next.
4a (EPL) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
4b (EVPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
5 Verify error-free traffic is flowing among the interfaces.
6 Test protection switch times and verify switch times are <60ms
Actual Passed
Results Failed
5.18 Protected EPN and EVPN circuit (100GE)
Item Description
Test ID 5-18 Protected EPN and EVPN circuit (100GE)
Objective To demonstrate mTera supports 100GE protected EPN and EVPN cirucits
Prerequisite TNMS ready and mTera is up and running
Action 1 Create any needed L2/ethernet network links (if needed)
2 In TNMS, select Configuration->Ethernet->New Service to create a new
service. Select Transport type = Ethernet, Name, unique SVLAN ID, and
set service type to Enabled. Click Next.
3 Select the ports which are the endpoints for the service. Click Next.
4a (EPL) Set mapping type to Port for both ports. Route the circuit (Auto Router is
recommended). Click Finish.
4b (EVPL) Set mapping type to C-VLAN for both ports. Add the C-VLANs to be
supported on each port. Route the circuit (Auto Router is recommended).
Click Finish.
5 Verify error-free traffic is flowing among the interfaces.
6 Test protection switch times and verify switch times are <60ms
Actual Passed
Results Failed
5.19 mTera Switch Fabric redundancy Test
Item Description
Test ID 5-19 mTera Switch Fabric redundancy Test
Objective To demonstrate mTera switch fabric redundancy capability
Prerequisite TNMS ready and mTera is up and running
Action 1 Set up multiple monitored (test sets) services through the fabric.
2 Take an MFAB OOS.
3 Unseat the module taken OOS.
4 Reseat the module back into the shelf.
5 Place the module back IS, and wait until the module is restored.
6 Repeat steps 2-5 for each remaining MFAB module.
Expected No traffic service disruption should be observed on the test sets, so long is at least 5
results MFAB modules are IS.
Actual Passed
Results Failed
5.20 mTera Hitless Software Upgrade
Item Description
Test ID 5-20 mTera Hitless Software Upgrade
Objective To demonstrate mTera Hitless Software Upgrade
Prerequisite TNMS ready and mTera is up and running with FP2.1 SW
Action 1 Provisioning OTN and Ethernet between N1_MTERA to N3_MTERA
2 Connect test box and make sure Zero bit error for both circuits
3 Upgrade N1_MTERA to FP3.0
4 Make sure there is no bit error on both test box
Actual Passed
Results Failed
5.21 mTera SNMP MIB support (Ethernet Packet Performance
Statistic)
Item Description
Test ID 5-21 mTera SNMP MIB support (Ethernet Packet Performance Statistic)
Objective To demonstrate mTera Ethernet Packet performance statistic retrieval via SNMP MIB
Prerequisite TNMS ready and mTera is up and running, mTera 2.1 MIB is loaded into 3rd party SNMP
manager
Action 1. Provision E-line service as per Test 5.11
2. Connect TdC 3rd party SNMP manager to DCN port of mTera A
3. Query the TX and RX packet counters for E-line circuit
Expected 3rd Part SNMP manager retrieve mTera Ethernet performance statistic information
results successfully.
Actual Passed
Results Failed
5.22 Power loss (full shelf)
Item Description
Test ID 5-22 Power loss (full shelf)
Objective To demonstrate operation is restored after shelf power loss
Prerequisite TNMS ready and mTera is up and running
Action 1 Establish traffic with test sets, through the shelf to be tested
2 Turn off A feed breakers
3 Turn off B feed breakers
4 Verify traffic loss
5 Restore power to all three zones of either feed (A or B)
6 Monitor time for service restoration
7 Restore remaining power feeds and verify LED status is green
Actual Passed
Results Failed
5.23 STPM removal/restoration
Item Description
Test ID 5-23 STPM removal/restoration
Objective To demonstrate the impact due to the loss of a single STP, the loss of both STPMs, and
the restoration of at least one STPM.
Prerequisite TNMS ready and mTera is up and running
Action 1 Establish traffic with test sets, through the shelf to be tested
2 Unseat the active STPM
3 Verify no traffic impact
4 Wait for the standby STPM to become fully active
5 Unseat the remaining STPM
6 Verify traffic is lost
7 Reseat one of the two STPMs
8 Verify traffic returns after STPM is restored and has recovered
9 Restore remaining STPM and verify no traffic impact
Expected No traffic impact after first STPM is pulled; traffic impacted after second STPM pulled (shelf
results timing is lost); traffic restored after at least one STPM is restored and has recovered.
Actual Passed
Results Failed
5.24 Committed Information Rate (CIR) control
Item Description
Test ID 5-24 Committed Information Rate (CIR) control
Objective To demonstrate the ability to limit ingress traffic on an interface
Prerequisite TNMS ready and mTera is up and running
Action 1 Establish a 10G EPL circuit (see Test 5.11)
2 Verify 100% throughput with a test set
3 Modify CIR to 5G using TNMS, CS, or CLI
4 Verify reduced throughput with a test set
5 Modify EIR to allow burst traffic above CIR
6 Verify throughput has increased to CIR + EIR
7 Restore CIR to 10G
8 Verify 100% throughput has been restored
Expected Throughput observed on the test set, should be consistent with throughput provisioned on
results the ingress interface.
Actual Passed
Results Failed