Beruflich Dokumente
Kultur Dokumente
FPSO PETROJARL 1, PGS FSU NJORD, NORSK HYDRO MV FUTURA & NATURA, NESTE SHIPPING
FSO CAKERAWALA, C-TOC FPSO PETROJARL FOINAVEN, PGS FSO BAYU UNDAN, CONOCOPHILLIPS
2
CARGO EXPORT, BALLAST & BOOSTER PUMPS
PUMP UNIT
Multi - stage
Centrifugal
BOTTOM SUPPORT
3
THE ADVANTAGES OF EUREKA ELECTRIC DRIVEN
DISTRIBUTED PUMP OFFLOADING SYSTEM
4
TANDEM OR SIDE BY SIDE OFF-LOADING
This crude oil export system is based Tandem configuration Side by side configuration
on off-loading to a shuttle tanker or Off-loading is carried out to a tanker via The tanker is moored side by side with
conventional tanker in either tandem a floating hose. The tanker is moored in the FPSO and off-loading is carried out
or side by side configuration. The tandem with the FPSO. The hose is via a flexible hose between the cross over
pressure required by the off-loading connected between the stern off-loading manifold of the FPSO and the tanker.
system is normally below 15 bar station on the FPSO and to the cross
over manifold of the tanker.
Crude Oil Export Arrangement
Crude oil export is carried out by one
multi stage deepwell pump (1) in each
cargo tank. The pump pressure is
sufficient to pump directly to the shuttle
tanker via the off-loading header.
Pump Specification
Crude oil export off-loading system based
on one crude oil export pump in each
cargo tank. The pumps have sufficient
head to offload directly to the shuttle
tanker. The total rated off-loading
capacity is achieved by operating a
number of pumps simultaneously. The
pump pressure should be sufficient to
achieve required off-loading pressure
(Considering friction loss and static
height in the total system including FPSO,
shuttle tanker and off-loading hose).
5
PIPELINE & BUOY OFF-LOADING
This crude oil export system is based on off-loading to a pipe line where high
pressure of up to 50 bar is normally required
6
UTILITY SYSTEMS
The portable pump can also be used for completely draining of a cargo tank in case
of maintenance and gas freeing. The pump is supplied together with a portable
tripod winch.
7
ACCESSORIES
Photo: StatoilHydro
8
CARGO EXPORT, BALLAST & BOOSTER PUMPS
9
COMPONENTS OF
THE EUREKA DEEPWELL PUMP
The Eureka deepwell pump is a FEATURES Continuous duty under all operation
vertical turbine product lubricated API 610 design - Journal bearing distance conditions – Line shaft is an efficient
line shaft type pump. It is designed is according to API 610. The running way of transferring power. The energy
according to API 610 for continuous speed of the pump is max. 75% of the transferred in the Eureka pump is very
pumping duty under all operating critical speed. This gives an under-critical low and do not cause any damage to the
conditions. For crude, condensate, tolerance of minimum 25% as specified journal bearings. The line shaft pump with
LPG and methanol duty the pump is by API 610. a typical length of +/- 30 m can deviate
delivered in SS316 material. For 30 cm from alignment centre without
ballast and seawater duty the pump Easy and safe disassembly and causing any damage. Hence, the pump is
is delivered in Duplex 22Cr, 25Cr, or assembly – The pump can be not critical to bulkhead deflection or
Ni-Al- Br material. The drive shaft is disassembled without entering the tank, bending of vessel hull.
always delivered in Duplex 25Cr or in the tank when equipped with
material. dismantling boxes. In order to pull the With FEM analysis the location of the
pump below the process deck the pump pump supports are predicted to avoid
can be delivered with reduced shaft vibrations on the deck head. Typically a
length (option). pump have one intermediate and one
The in tank components are long lifetime bottom support. Pump axial thrust is
items (min. 20.000 hours). taken by deck head mounted thrust
All critical parts are situated on deck in bearing.
the top unit or electro motor. An
inflatable safety seal is used to prevent
gas leakage by maintenance operation in
the top unit.
10
HIGH VISCOSITY QUALIFICATION
OF EUREKA API 610 LINE-SHAFT PUMPS
THROUGH EXTENSIVE FULL SCALE TESTING
In 2014 and for the first time Eureka Measured results were then compared within the industry and not for validation
Pumps performed a full scale, high to published methods for pump of published methods of viscosity
viscosity pump performance test for a characteristics viscosity correction. The correction for pump characteristics.
2-stage vertically suspended (VS1) objective for these additional analyses
API610 pump. The test scope was part of was to evaluate possible alternative The test results provide valuable insight
an ongoing EPC project and exclusively approaches in order to improve of the effects on high viscosity pumping
conducted for industrial purposes. The uncertainties with viscous prediction and and by improving the predictions this will
viscosity range for the complete test ultimately reduce the number of tests/ allow a more accurate rating and efficient
scope, including the internal test test scope in future projects. optimization of the process equipment,
conducted in preparation for the official e.g. electrical motor, valves, cooling
tests was 480 cP to 3075 cP. The The conclusion was quite interesting. Test system.
objective, to simulate real field operation results compared with Hydraulic Institute
with crude oil and qualify the pump for (HI) and Gülich’s viscosity prediction In cases where installation cost, main-
the given field conditions and require- shows discrepancies for all performance tenance cost and loss of production are
ments were successfully achieved. The parameters consisting of flow, head and critical in financial terms and where the
test stand with its complexity worked power/efficiency. A major observation is uncertainties regarding performance
satisfactorily throughout the complete the significant under-prediction of power predictions are high, realistic laboratory
viscosity range (480 - 3075 cP). for both Gülich’s and Hydraulic Institute testing with real fluids, real operating
(HI) prediction from 1994 and 2010 points and specific design of the pump
Furthermore, the reason for conducting when compared to actual measured may be necessary to mitigate the
this test scope was the uncertainties in power consumption. The discrepancy potential risks.
published methods of predicting high increased with increasing viscosity. HI
viscosity fluid pump characteristics, from 1994 gave the most conservative- Ref. “High Viscosity Test of a Crude Oil Pump”
limited available literature, hence reduced hence the most accurate power a scientific paper by Brigitte Le Fur,
field operational risks. corrections. It should be emphasized that Cato Knutsen Moe & Fabien Cerru.
this comparison is simply for discussion
Caisson
Heat exchanger
cooling water
in-/outlet
11
Part of
| 0130
EUREKA PUMPS AS is a Norwegian pump supplier with more than 40 years of experience in the
oil & gas and marine industry, offering a range of pumps and generator sets that covers a majority
of applications. EUREKA PUMPS supplies to new builds and offers services for upgrading, modification,
equipment testing, installation and commissioning.
EUREKA PUMPS is a market leader among companies operating on the Norwegian Continental shelf,
and it is also present in International markets with selected applications, based on own technology.
EUREKA PUMPS main office is in Oslo (Lysaker), Norway, and has offices and advanced service facilities
along the Norwegian coast. EUREKA PUMPS also has offices in Houston St. Johns, Busan and
Kuala Lumpur.
EUREKA PUMPS is one of five companies in the ALIGN group, a leading supplier of production
equipment and safety critical products and solutions. ALIGN offers services ensuring continuous
production, a perspective that safeguards optimal operations and lower life-cycle costs.
The ALIGN group is owned by Converto Capital and HitecVision.
EUREKA PUMPS AS
Agent
Hammerfest
Kristiansund N
Mongstad Oslo
Stavanger
Busan
Houston
Kuala Lumpur
Rio
www.eureka.no
EUREKA PUMPS AS | P.O. Box 229, NO-1326 Lysaker, Norway | Oksenøyveien 10, NO-1366 Lysaker, Norway