Sie sind auf Seite 1von 250
BILFINGER| BERGER Barwa Cty Phase 4 be Document Revi Section | Revision Description Prepared | Reviewed | Approved Approved Date [BBQ] [BBQ] [BBQ] [Aecom] Descpton ot oe 1 | 20112011 | ted Sencze and | subcon 2M. | ow ree Sysen wn) teen ‘Schedule of COM, one 2 aosnzors | setae sion $0, [ewe | Equipment Technical com, ose 3 |zosnaonn | Eau swam |S, femrce J com, me 4 | 20112011 | operation sutcon |SM. | ew roe , com, ove 5 | 2012011 | maintenance sutcon SM. | cm voe Pars entiation & com on 6 | zosz011 | Recommended subcon | 20. | omic 5 ane area mt aean Name ad Asso om 7 20.11.2011 | Manufacturers and ‘Subcon com, (CM/CE " ane onto an Waranty/ Guan, = font aoa, cow, 2 | aoanzoys | Auto aporanis. | cupoon | SOM. | eure Gers wet ten COM, os 2 [2012011 | oawingstist —— | subom | 20M. | cw rce wee te Manufacturer's ‘COM, ae to | acanzors | Manat sutcon |20M. | cmrce von ee BOPLOMS.63 Rev Det: 10012012 Page2 BILFINGER|BERGER Barwa City Phase 1 ov Document Revision Sheet Section | Revision | Description | Prepared | Reviewed | Approved | Approved Date 1eBq] | [BBQ] | [BBQ] [Aecom] Description of me: 1 | 20.11.2011 | installed Services and | subcon | SQM. | cM/CE System me Stee Schedule of com, oe 2 | 2oan.zors | Sere Sutcon Gnd feM/ce | Equipment Technical | cuiyog, | COM ad 3 | 20.11.2011 | Eau suc endo |eMsce | . com, oe 4 | 20.11.2011 | operation Subeon | COM. | cwcE Name 1 Sate com, oe 5 | 20.11.2011 | Maintenance Subcon | COM | cmsce name 1 See arts Mdentification & com oe 6 | 20.11.2011 | Recommended Subcon \ coMsce Spares onae ™ 1s Name and Address of com ae 7 | 20.11.2011 | Manutactuers and | Subcon \ omsce x awac Supplies moet Sagtre Warranty / Guaranty we Authority Approvals. | gy com, 8 | 20.11.2011 | Aulherty Approvals. | subcon | COM | cmice Reports tne 1 Sere com, ~~“ 9 | 20.11.2011 | Drawings List Sutcon [Garde [oM/cE | . Manufacturer's com, ou to | zost2611 | Manufac subcon | SOM. | omsce hme 1 Sete some te BCP1-OM56.3_Rev1 Date: 10.01.2012 Page 2 Barwa City Phase 1 oO) BILFINGER|BERGER Document Revision Sheet Section | Revision Description Prepared | Reviewed | Approved Approved Date [BBQ] | [BBQ] [BBQ] [Aecom] Nome 1 Sian ane ' Sonnee co 1 Sepa sare 1 Sot ame ' Sinanre Non ' Sonanse Nar 1 sutre ane ‘ Sore rae ' Sinanee Ns 1 Sure BCP1-OM5.6.3_ Rev 1 Date: 10.01.2012 Page 3

Das könnte Ihnen auch gefallen