Beruflich Dokumente
Kultur Dokumente
• Please read the EIF Guidelines for Applicants For office use only
carefully before you complete this form.
• All information required in the application form must Date received
be given.
• Your application form must not be more than 15
pages excluding appendices. Reference
Project Officer
I am / we are currently:
Please mark (X) in appropriate box
Individual
Sole Proprietor
Micro Enterprise
Small Enterprise
*Please enclose CV
1.4 Designation
1.3 Occupation
2
EIF version 10 (July 2009)
1. Managerial
Technical &
2.
Supervisory
Support
3.
Staff
Total
* Please enclose copies of Form 49 and Latest EPF Statement
2.5 Turnover (In your most recent annual accounts) 2.6 Balance Sheet (Total assets net of depreciation)
3
EIF version 10 (July 2009)
Technology Cluster
3.3
Please mark (X) in appropriate box
Biotechnology
• Plant
• Animal
• Food
• Biopharmacy
• Molecular Biology
• Medical Biotechnology
• Industrial/Environmental
Biotechnology
ICT
• Information System
• ICT Infrastructure
• Software
• Emerging IT
• Communication
• Security System
• Signal Processing
• Database Technology
• ICT Application
Industry
• Advanced Materials
• Advanced Manufacturing
• Nanotechnology
• Alternative Energy
4
EIF version 10 (July 2009)
A brief description not more than 1 page which includes the following:-
i) Objectives
ii) Methodology
iii) Project Milestones
iv) Technology used
v) Output expected / Deliverables
vi) Total Project Cost
5
EIF version 10 (July 2009)
Sub Total
Equipment (not more than 40% of total amount requested)
• _________________________________
• _________________________________
Sub Total
Expenditure for services (consultancy and testing)
• _________________________________
• _________________________________
Sub Total
Project documentation
• ____________________________
• ____________________________
Sub Total
Regulatory and standard compliance
• ____________________________
• ____________________________
Sub Total
Product testing (including samples, fees and documentation)
• ____________________________
• ____________________________
Sub Total
Grand Total
Note: The quantum and duration of funding approved under EIF will be based on the merits of each application as listed below:
Individual RM 50,000.00 12
Other RM 300,000.00 12
6
EIF version 10 (July 2009)
How do you plan to fund the portion of the project costs not funded under EIF?
3.7
Please provide evidence (e.g. bank statement, bank facility / OD)
Have you been awarded any Government grants or funds? If yes, please provide details and
3.8
amount of grant / fund awarded
7
EIF version 10 (July 2009)
Postcode
4.6 Occupation / Designation
4.5 Email Address
Postcode
8
EIF version 10 (July 2009)
PART 5: DECLARATION
5.1 Declaration
I hereby declare that the particulars furnished in this form including attachments are correct and true to the best of my
knowledge.
Name
I/C Number
Signature (Digital/Scanned)
Date
Please complete this application form and email to MOSTI via innofund@mosti.gov.my
or post the form ( in both hardcopy and softcopy) to the following address:
Innofund Secretariat
Fund Section, Planning Division,
Ministry of Science, Technology and Innovation
Level 3 Block C5, Complex C
Federal Government Administrative Centre
62662 PUTRAJAYA
MOSTI reserves the right to withdraw approval based on false information submitted by applicants.
9
EIF version 10 (July 2009)
APPLICATION CHECKLIST
(For Micro And Small Enterprises)
Please ensure that the relevant supporting documents are attached to the application form.
(Please tick [ √ ] in appropriate box)
• Project Title
- Provide project title
• Project Objectives
- Describe the measurable objectives of the project
• Project Description
- Provide a detailed description of the project in terms of:
The technology to be used
The methodology that will be used
How you expect the project to achieve its goals
The innovativeness of the product, process or service that you propose to develop compared to the
technology currently available
The deliverables
Market opportunity
Immediate and long term benefits
• Project Milestones
- List the milestones and activities in the format provided below:
10
EIF version 10 (July 2009)
• Project Timeline
- Provide a Gantt Chart to show the implementation schedule of your proposed project
Month
No Activities 1 2 3 4 5 6
1
2
3
4
• Project Team
- Please provide full CVs of all personnel involved in the project: -
Name
Position
Qualification
Experience
Achievement
• Technology Benchmark
- Comparison between the proposed technology used with the existing or similar technologies
in the market.
• Project Risk
- Please identify and describe the technical risks in the project and how these risks will
be managed
5) Copy of Return Giving Particulars in Register of Directors, Managers and Secretaries and
Changes of Shares (Form 49)
10) Soft copy of Application Form and Full Project proposal if submitted through post
APPLICATION CHECKLIST
(For Individual And Sole Proprietor)
Please ensure that the relevant supporting documents are attached to the application form.
(Please tick [ √ ] in appropriate box)
• Project Title
- Provide project title
• Project Objectives
- Describe the measurable objectives of the project
• Project Description
- Provide a detailed description of the project in terms of:
The technology to be used
The methodology that will be used
How you expect the project to achieve its goals
The innovativeness of the product, process or service that you propose to develop compared to the
technology currently available
The deliverables
Market opportunity
Immediate and long term benefits
• Project Milestones
- List the milestones and activities in the format provided below:
12
EIF version 10 (July 2009)
• Project Timeline
- Provide a Gantt Chart to show the implementation schedule of your proposed project
Month
No Activities 1 2 3 4 5 6
1
2
3
4
• Project Team
- Please provide full CVs of all personnel involved in the project: -
Name
Position
Qualification
Experience
Achievement
• Technology Benchmark
- Comparison between the proposed technology used with the existing or similar
technologies in the market.
• Project Risk
- Please identify and describe the technical risks in the project and how these risks will
be managed
5) Soft copy of Application Form and Full Project proposal if submitted through post
13