Running Account Bill
(C.P.W.A. CODE, Paragraph 10-2-10, 10-2-12, and 10-2-13)
Final Payments must invariable be made on forms printed on yellow paper which should not be used for intermediate
payment.
For Contractors-- This form provides for [1] Advance Payments, and [2] Payments for measured works. The form of
Account of Secured Advances, which has been printed separately should be attached where necessary.
Division --- Kalahandi Sub-Division ---Bhawanipatna
Cash Voucher No. --- Name of Contractor --- S.J.Singh
Bhambra Name of Work--- Construction of 40KL capacity OHT for
pws to village Gurjung under Bhawanipatna
Serial No. of
Bill--- 4th Running Account & Final Bill, No. and Date of his
Previous Bill for this work-- 3rd Running Account Bill Reference to
Agreement no. --- 66 of 2010/2011 , Date of written order to
commence the work---4.8.10 Date of actual completion of work--
2.10.10
1. Account of work Executed
Quantity
Item of work [grouped under executed up Payment on the basis of actual measurement
Remarks
"Sub-Heads" "Sub-Works" of unit Rate to date as per
estimate]
measurement up-to-date Since previous bill
book
1 2 3 4 5
Rs. p. Rs. p. Rs. p
1).Supplying all labour and
T&P for earth work excavation
in hard soil within 50 M initial
lead and 1.5 M initial lift
including rough dressing and
leveling etc., in foundation and
plinth as per direction of
Engineer –in-charge.
Pipe line
1)-Supplying all labour and
T&P for earth work excavation
in asll kind of soil and plinth as
per direction of Engineer –in-
charge.
985094.35 21540.94
When there are two or more entries in column 6 relating to each sub-head of estimate they should in the case
of work the accounts of which are kept by sub-head be totaled and total record in column 7 for posting the
works Abstract.
When there are two or more entries in column 6 relating to each sub-head of estimate they should in the case
of work the accounts of which are kept by sub-head be totaled and total record in column 7 for posting the
works Abstract.
[3]
1.- The measurement on which are based the entries in columns 1 to 6 of account where
made____________________ on_________________ and are recorded at page _________________ of
Measurement Book No._________ .
% 2. Certified that in addition to and quit a part from quantities of work actually executed as shown in column
4 of Account, some work has actually been done in connection with several item and the value of such work
after deducting there from the proportionate amount of secured advances, if any, ultimately recoverable
on account of the quantities of materials used there in ( in no case, less than advance Payments as per item 2
of memorandum of payment made or proposed to be made for the convenience of the Contractor, in
anticipation of and subject to the result of detailed measurement, which will be more) as soon as possible .
Date_____________
Signature of Officer___________
Preparing the Bill (Rank)___________
#Signature of ___________
Signature of Contractor_________ Officer Authorizing(Rank)______________
date_______ Payment_____________________
date_________
% This Certificate must be signed by the sub-division of Divisional Officer
# This signature is necessary only when the Officer who prepares the bill is not the Officer who
authorize the payment in such a case two signatures are essential.
6.-
7.- Balance , i:e: "up-to-date
Total amount of payment "already
payment _____________________
made [item 4,6]
as per Entry [K] of last Running Account Bill [K]*
No._____________ of ___________ forwarded with account for _____ 2009
[4]
8.- payment
(a) Bynow to be of
recovery made as detailed
amounts below:---
creditable to this
work . Rs. p. Rs. p.
}
___________________________________ } (a)
_____________________________________________________________________________________
Pay (_______________________) __________ * by cheque
Date_________ Initials of Disbursing Officer
Received (___________) as per above memorandum, on account of this work
Date ________
[amount in vernacular]
! Witness______________
Stamp
***should
if the net amount to be paid is less than Rs.10 and it can not be included in a cheque the payment
This figure should
be made in be tested
cash, this to seebeing
entry that italtered
agreedsuitable
with theand
total
theofalteration
item 7 and 8
attested by the dated
initials.
IV. Remarks
(This space reserved for any remarks which the Disbursing Officer or the Divisional Officer may with in
respect of the execution of the work check of measurement on the state of contractor's account.)
Material Statement 4th R/A & Final Bill
Name of Contractor --- S.J.Singh Bhambra
Name of Work--- Construction of 40KL capacity OHT for pws to village Gurjung
under Bhawanipatna
Qnty. balance
Qnty. Issued Used in Returned by with
Sl no. name of material HR no/date to work work Contractor contractor Remarks
1 cement nill 13.14 13.14 nill nill All
materials
2 sand nill 1.99 1.99 nill nill are
3 water proofing nill 86kg 86kg nill nill supplied
by the
cement paint contarctor
Qnty. balance
Qnty. Issued Used in Returned by with
Sl no. name of material HR no/date to work work Contractor contractor Remarks
1 cement nill 13.14 13.14 nill nill All
materials
2 sand nill 1.99 1.99 nill nill are
3 water proofing nill 86kg 86kg nill nill supplied
by the
cement paint contarctor
mb no, 4th final bill
measureme 5218
5342
abstract 4523
5264
Serial No. of B
Serial No. of Bill--- 4th Running Account & Final Bill, No. and Date of his Previous Bill for thi
e of his Previous Bill for this work-- 3rd Running Account Bill Reference to Agreement no. --- 66 of 2010/2011 ,
no. --- 66 of 2010/2011 ,
FINANCIAL RULE FORM NO. 12
( See Financial Rule - 205) Date of comencement:-- 24.12.11
FIRST & FINAL BILL Date of completion:-
20.01.12
(for Contractor's and Suppliers) Actual date of Completion:- 23.01.12
For use in Divisional Office For use in Accounttant General's Office
checked Completed
Checked with Schedule or Classification Reviewed
Accounts Divisional accountant rates/checked with the Checked
Payee's
Item of work or supplies grouped under sub- Ref.to
Sl.no. Quantity Rate Unit Amount Acknowle
heads and sub-work of estimate record dgement
1 2 3 4 5 6 7 8
1 Supplying all materials labour T&P
for construction of single mouth RCC
pillar type stand post, platformof size
1.2m dia using RCC ring & 1.2 m
long drain including earth work in
excavation in hard soil using 4cm size
metal cement concrete 1;2;4, 12 cm
CBHG chiups & 6 mm thick cement
plaster and punning including cost &
conveyance Taxes all complete as per
the direction-of-Engineer-in-charge
MB
4911,
pg-199 3 3400.00 each 10200.00
2 Supplying all materials labour T&P
for construction of 1.2 m dia RCC
ring masonary SV/NRV/AV chanmber
surinder jeet singh bhambra
Divisional Officer
Divisional rank
Date________
Note:--- In the Case of Payment to suppliers a red ink entry should be made across the page above the
entries relating to in out the following forms, applicable to the case (1) stock (2) purchase of Stock (3)
purchases for direct issue to work__________
24.12.11
20.01.12
23.01.12
pass
order for
this on
mb no.
5416
FINANCIAL RULE FORM NO. 12
( See Financial Rule - 205) Date of comencement:-- 24.12.11
FIRST & FINAL BILL Date of completion:-
20.01.12
(for Contractor's and Suppliers) Actual date of Completion:- 23.01.12
For use in Divisional Office For use in Accounttant General's Office
checked Completed
Checked with Schedule or Classification Reviewed
Accounts Divisional accountant rates/checked with the Checked
Payee's
Sl.no. Item of workand
or supplies grouped under sub-heads Ref.to
records Quantity Rate Unit Amount Acknowledg
sub-work of estimate
ement
1 2 3 4 5 6 7 8
1 Providing Flanged joints to flanged C I/P
V C pipes & fittings of the following dia
incl.testing of joints(excl.cost of N& MB
B,Rubber insertion no.
5013
a)-63/80mm p-198 2 15.00 each 30.00
b)-100mm 6 22.00 each 132.00
c)-150mm nill 25.00 each
2 Fitting & fixing of CISV/NRV(labour
only)
Divisional Officer
Divisional rank
Date________
Note:--- In the Case of Payment to suppliers a red ink entry should be made across the page above the
entries relating to in out the following forms, applicable to the case (1) stock (2) purchase of Stock (3)
purchases for direct issue to work__________
Material Statement 1st & Final Bill
Name of Contractor --- S.J.Singh Bhambra
Name of Work--- Construction of stand post & valve chamber
RPWS to Gurjung -Ph- II
Returned
Qnty. Qnty. by balance
HR Issued to Used in Contracto with
Sl no. name of material no/date work work r contractor Remarks
1 cement All
materials
2 sand are
3 chip supplied
by the
contarctor
Returned
Qnty. Qnty. by balance
HR Issued to Used in Contracto with
Sl no. name of material no/date work work r contractor Remarks
1 cement nill 9.23cum 9.23cum nill nill All
materials
2 sand nill 3.86cum 3.86cum nill nill are
3 chip nill 6.72cum 6.72cum nill nill supplied
by the
contarctor
Seri
Seri
Serial No. of Bill--- 4th Running Account & Final Bill, No. and Date of his Previous
Serial No. of Bill--- 4th Running Account & Final Bill, No. and Date of his Previous
o. and Date of his Previous Bill for this work-- 3rd Running Account Bill Reference to Agreement no. --- 66 of 20
o. and Date of his Previous Bill for this work-- 3rd Running Account Bill Reference to Agreement no. --- 66 of 20
reement no. --- 66 of 2010/2011 ,
Returned
Qnty. Qnty. by balance
name of HR Issued to Used in Contracto with
Sl no. material no/date work work r contractor Remarks
1 cement 28.89cum 28.89cum nill nill All
materials
2 sand 6.05cum 6.05cum nill nill are
3 4cm metal 12.10cum 12.10cum nill nill supplied
by the
contarctor
4 90mm pvc T/P 4 nos. 4 nos. nill nill
5 90m flange 4 nos. 4 nos. nill nill
6 110mm pvc T/P 6 nos. 6 nos. nill nill
7 110mm pvc flange 6 nos. 6 nos. nill nill
8 80mm S.V 2 nos. 2 nos. nill nill
9 100mm S.V. 2 nos. 2 nos. nill nill
10 100mm NRV 1 nos. 1 nos. nill nill
11 90mm pvc saddle 5 nos. 5 nos. nill nill
12 63mm pvc saddle 8 nos. 8 nos. nill nill
13 110mm pvc saddle 2 nos. 2 nos. nill nill
Material Statement 1st & Final Bill
Name of Contractor --- S.J.Singh Bhambra
Name of Work--- Dismantling cement concrete to laying pipe line for
RPWS to Gurjung PH-1
Returned
Qnty. Qnty. by balance
name of HR Issued to Used in Contracto with
Sl no. material no/date work work r contractor Remarks
1 cement 28.89cum 28.89cum nill nill All materials
are supplied
2 sand 6.05cum 6.05cum nill nill by the
3 4cm metal 12.10cum 12.10cum nill nill contarctor
Cement 0.0114
Stand post
1 sand filling found 22
2 cc 136 0.35
3 cc124 0.31
4 20cp 1;4 6.08
5 c punning 6.08
6
Schedule XLV- Form No. 16 C.P.W.A. 26/(1)
2nd Running & final Account Bill
(C.P.W.A. CODE, Paragraph 10-2-10, 10-2-12, and 10-2-13)
Final Payments must invariable be made on forms printed on yellow paper which should not be used for
intermediate payment.
Division --- Kalahandi
For Contractors-- This formSub-Division ---Bhawanipatna
provides for [1] Cash
Advance Payments, and [2] Voucher
Payments forNo. ---
measured works. The form of
NameofofSecured
Account Contractor --- S.J.Singh
Advances, Bhambra
which has Name of should
been printed separately Work---beConstruction of necessary.
attached where stand post & valve
chamber RPWS to Gurjung -Ph- II , Serial No. of Bill--- 2nd Running Account & Final Bill,
When there are two or more entries in column 6 relating to each sub-head of estimate they should in the
case of work the accounts of which are kept by sub-head be totaled and total record in column 7 for
posting the works Abstract.
When there are two or more entries in column 6 relating to each sub-head of estimate they should in the
case of work the accounts of which are kept by sub-head be totaled and total record in column 7 for
posting the works Abstract.
[3]
II- Certificate and Signature
1.- The measurement on which are based the entries in columns 1 to 6 of account where
made____________________ on_________________ and are recorded at page _________________ of
Measurement Book No._________ .
% 2. Certified that in addition to and quit a part from quantities of work actually executed as shown in
column 4 of Account, some work has actually been done in connection with several item and the value
of such work after deducting there from the proportionate amount of secured advances, if any,
ultimately recoverable on account of the quantities of materials used there in ( in no case, less than
advance Payments as per item 2 of memorandum of payment made or proposed to be made for the
convenience of the Contractor, in anticipation of and subject to the result of detailed measurement,
which will be more) as soon as possible .
#Signature of ___________
Signature of Contractor_________ Officer Authorizing(Rank)______________
date_______ Payment_____________________
date_________
% This Certificate must be signed by the sub-division of Divisional Officer
# This signature is necessary only when the Officer who prepares the bill is not the Officer who
authorize the payment in such a case two signatures are essential.
6.- Balance , i:e: "up-to-date " payment _____________________ [item 4,6] [K]*
7.- Total amount of payment already made as per Entry [K] of last Running Account Bill
No._____________ of ___________ forwarded with account for _____ 2009
[4]
8.- payment now toof
(a) By recovery beamounts
made ascreditable
detailed below:---
to this
work . Rs. p.
} Rs. p.
___________________________________ } (a)
_____________________________________________________________________________________
Pay (_______________________) __________ * by cheque
Date_________ Initials of Disbursing Officer
Received (___________) as per above memorandum, on account of this work
Date ________
[amount in vernacular]
! Witness______________
Stamp
*payment
This figure should
should be tested
be made to see
in cash, this that
entryit being
agreedaltered
with the total of
suitable anditem
the7alteration
and 8 attested by the
dated initials.
* here specify the net amount payable vide item 8 (c )
*! The
The payee's
paymentacknowledgement
should be attestedshould before
by some the person
known gross amount paid
when the as peracknowledgement
payee's item 8 ( i.e., a+b+c is
)
given by a mark thumb impression.
IV. Remarks
(This space reserved for any remarks which the Disbursing Officer or the Divisional Officer may with
in respect of the execution of the work check of measurement on the state of contractor's account.)