100 DAYS ACTION PLAN LIST

COMPOUND WALLS TO OPEN SPACES


Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound walls as per type


Due to site dispute the work is
design for open place (6 Nos.) at Sy.No.565,567
Sri B.V.Subhakar delayed, after settlement of site
Sangamithra Enclave, Sy No.604 Srichakra
1 1 6 45.50 S.Ravinder Sagar Rao, Progress dispute by ACP Town Planning
Enclave, Kandhiguda Village, OUT Colony and
Ph : 8374924052 Section the construction of
Saibaba Nagar Edgha, Akash Joseph Enclave in
compound wall is in progress
Ward No.1 and 134p of Kapra Circle, G.H.M.C

construction of compound wall at (5 Nos) (a)


Sy.No.565 & 567 in Sangamithra Enclave (b)
B.V. Subhakar Rao
2 1 5 Sy.No.136(P), 52(P), 141 in Saket Colony Phase- 46.55 Shivarathri Swamy Completed
9704701550
II & III (c) Sy.No.604(P) Sri Chakra Enclave in
Ward No.1 & 134P

construction of compound wall at (2 Nos)


Sy.Nos.209, 210 & 211/2 at Saraswathi Nagar, B. Maheshwar
3 1 2 19.50 S. Ravinder Sagar Completed
Nacharam Village, Sy.Nos.96, 97, 98 at Gokul 9959226998
Nagar, Mallapur Village
Construction of compound wall at (2 Nos)
Sy.Nos.136P, 52P, 141 at Saket Ph-II, B.V. Subhakar Rao
4 1 2 19.50 Sri M. Swamy Completed
Sy.Nos.5,6,7,10/1, 11/1, 12, 12/42, 13/2 at 9704701550
Ammuguda

construction of compound wall at (5 nos) (a)


Sy.No.9(P), 10, 11, 12(P) & 23(P) in Krishna
M/s.
Nagar Colony in Ward No.3 (b) Sy.No.341, 343 B. Maheshwar
5 1 5 29.00 Parameshwara Completed
to 346 Situated at Sri Sai Krishna Enclave (c) 9959226998
VLCCS
Sy.No.297, 299 Situated at Venkatreddynagar,
Cherlapally in Ward No.2 Kapra Circle, GHMC.

1
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound walls as per type


Due to site dispute the work is
design for open place (4 Nos.) at Opp. Plot
Sri P.K.Bala delayed, after settlement of site
No.111, Vasavi Shiva Nagar, EWS-48, EWS, 231
6 1 4 20.10 Avula Chandu Kishan, Progress dispute by ACP Town Planning
in APIIC Colony and Nagarjuna Nagar main road
Ph : 9866506752 Section the construction of
(near H.No.1-10-28/155) in Ward No.2 of Kapra
compound wall is in progress
Circle, G.H.M.C

Due to site dispute the work is


Construction of compound walls as per type
Sri B.Ramesh delayed, after settlement of site
design for open place (1 No.) at Ashok Nagar
7 1-Kapra 1 2.20 - Babu, To be started dispute by ACP Town Planning
beside H.No.3-7-35 and Opp. H.No.3-7-30 in
Ph : 9000994035 Section the construction of
Ward No.3 Mallapur of Kapra Circle, G.H.M.C
compound wall is in progress

Construction of compound walls as per type


Sri B.Ramesh
design for open place (1 No.) at Syno.93 at
8 1-Kapra 1 25.00 Siddappa WLCCS Babu, Completed
Chanikaapuri and various placesin Ward no.4
Ph : 9000994035
Nacharam of Kapra Circle, G.H.M.C

Construction of compound walls as per type


design for open place (6 No.) at Mallapur(v),
Due to site dispute the work is
Kapra, Gokul nagar, Mallapur(v), Uppal(m),
9 1-Kapra 6 site dispute delayed, after settlement of site
Hanumannagar, communitee, Nacharam, of Saket
dispute by ACP Town Planning
Phase II, Kapra(v), Keesar(m) Ammuguda,
Kapra(v), Keesara(m) Kapra Circle, G.H.M.C

Construction of Compound Walls to (4 Nos.) of


JAI KISHAN
Open Spaces in Sy. No. 74 & 75 in TV Colony, Sri P.Damodhar
10 2 4 47.00 LAHOTI, Completed
Ramantapur (DD Colony), W. No. 7- Rao, 9966669410
9246524073
Ramanthapur in Uppal Div. No.2, GHMC.
Construction of Compound Wall (3 Nos) to
K.THIRUMALA Sri P.Damodhar
11 2 3 T.V.Colony, Ramantapur, Swaroopa Nagar, 7- 38.00 Completed
RAO, 9866198214 Rao, 9966669410
Ramanthapur in Uppal Div. No.2, GHMC.
Providing of Chainlink Fencing and leveling of Sri Baji Shaheed
Tirumala Prasad
12 2 6 green belt (Eastern side) of Green Hills Colony 7.85 Khan, AE, Completed
WLCCS
W.No.6, Habsiguda in Uppal Circle, GHMC 9849906762

2
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of Compound Walls to 3 Nos of


K.THIRUMALA Sri Baji Shaheed OU Authorities are claiming the
Open Spaces in TV Colony and P&T Colony, St. Site Disputes
13 2 3 35.00 RAO, 9866198214 Khan, AE, land and not allowing to
No.1, Habsiguda, W.No.6-Habsiguda and 7- Court Case
15-07-14 9849906762 construct compound wall.
Ramanthapur in Uppal Div. No.2, GHMC.

Construction of Compound Wall for Parks Opp:


Plot No:133 at Cosmopolitan Colony and Beside K.THIRUMALA Sri K.Venugopala
14 3A 1 Plot No:19/V at Anand Nagar and Southend Park 19.00 RAO Rao Completed
Colony in Ward No.9, Mansoorabad of L.B. 9441241174 9849908091
Nagar Circle-III, GHMC.
Construction of Compound Wall for Open Space K. SRINIVAS
Sri G.Sainath Goud
15 3A 1 at Pavangiri Colony in Ward No.10, Hayath Nagar 13.00 9948081158 Completed
9000631586
of L.B. Nagar Circle-III, GHMC. 040-24550837
SRI NARENDRA
Construction of Balance Compound Wall for
WLCCS
Parks at Trishakthi Temple, at Hariharapuram in Sri R.Mangulal
16 3A 1 10.80 (O.NARENDRA Completed
Ward No.11, Vanasthalipuram of L.B. Nagar 9701362707
RAJU)
Circle-III, GHMC. (Reserved for SC/ST/WLCCS)
9502640804

Construction of Compound Wall for Open Space ANNU SRINIVAS


at Hanuman Nagar Near TKR College in Ward REDDY Sri G.Nikhil Reddy
17 3A 1 16.70 Completed
No:12, Karmanghat of L.B Nagar Circle-III, 9618088222 9701365524
GHMC. 8801742422
ANNU SRINIVAS
Construction of Compound Wall for Open Space
REDDY Sri G.Nikhil Reddy
18 3A 1 at Venkataramana Colony in Ward No: 12, 12.00 Completed
9618088222 9701365524
Karmanghat of L.B Nagar Circle-III, GHMC.
8801742422
ANNU SRINIVAS
Construction of Compound Wall for Open Space
REDDY Sri G.Nikhil Reddy
19 3A 1 at Sai Thirumala Colony in Ward No: 12, 16.50 Completed
9618088222 9701365524
Karmanghat of L.B Nagar Circle-III, GHMC.
8801742422

3
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of Compound Wall for Open Space


at opp: Block No:4 & 6, at Vambay colony In PENTAMMA
Sri G.Nikhil Reddy
20 3A 1 Nanadanvanam in Ward No.12, Karmanghat of 11.70 THALLI WLCCS Completed
9701365524
L.B. Nagar Circle-III, GHMC. (Reserved for 9848093776
SC/ST/WLCCS)
Construction of Compound Wall to Open Space at
RAJESH LAHOTI Sri G.Nikhil Reddy
21 3A 1 Srinivasapuram Colony in Ward No.12, 15.00 Completed
9391034094 9701365524
Karmanghat of L.B. Nagar Circle-III, GHMC.
T GOVARDHAN
Construction of Compound Wall to Open Space at
REDDY Sri G.Nikhil Reddy
22 3A 1 Kasthuri Colony in Ward No.12, Karmanghat of 20.00 Completed
9440901509 9701365524
L.B.Nagar Circle-III, GHMC.
04024241964
Construction of Compound Wall for Open Spaces
Sri K.Venugopala
at Sri Ram Nagar (2 Nos), South End Park (2Nos) S Sri Ram Reddy
23 3A 4 33.50 Rao Completed
in Ward No.9, Mansoorabad of L.B.Nagar Circle- 9247370002
9849908091
III, GHMC.
AZTEC
Construction of Compound Wall for Open Spaces Sri K.Venugopala
CONSTRUCTION
24 3A 8 at Shivam Hills (8Nos) in Ward No.10, Hayath 48.00 Rao Completed
S
Nagar of L.B.Nagar Circle-III, GHMC. 9849908091
9849644459

Construction of Compound Wall for Open Spaces


T VISHNU
at Shivam Hills (2Nos), Raghavendra Nagar Sri K.Venugopala 1 No.s site not cleared at Shivam
MURTHY
25 3A 4 Colony (1No)and Septic Tank Munuganoor 48.70 Rao Progress Hills, 1 No.s site dispute, Shivam
9848094136
Village SY No.44 (1No) in Ward No.10, Hayath 9849908091 Hills
8682222842
Nagar of L.B.Nagar Circle-III, GHMC.

Construction of Compound Wall for Open Spaces


PATNAM
at Sathya Nagar Colony (Road No.4) (1No) and Sri G.Sainath Goud
26 3A 4 47.80 SRISAILAM Completed
Surya Nagar (3 Nos) in Ward No.10, Hayath 9000631586
8686807070
Nagar of L.B.Nagar Circle-III, GHMC.
Construction of Compound Wall for Open Spaces
at Sri Balaji Nagar (3 Nos) and Huda Sai Nagar S Sri Ram Reddy Sri G.Sainath Goud
27 3A 4 46.50 Completed
(1No) in Ward No.10, Hayath Nagar of L.B.Nagar 9247370002 9000631586
Circle-III, GHMC.
4
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Construction of Compound Wall for Open Spaces APWLCCS LTD
Sri G.Sainath Goud
28 3A 1 at High Court Colony (1No) in Ward No.10, 11.75 (Yellaiah) Completed
9000631586
Hayath Nagar of L.B.Nagar Circle-III, GHMC. 9849434318

Construction of Compound Wall for Open Spaces


at Kasturi Colony (3 Nos), Hasthinapuram,
PATNAM
Bhagya Nagar Colony Phase-I, Hasthinapuram Sri G.Nikhil Reddy
29 3A 5 47.00 SRISAILAM Completed
North North Extension (1No) and Sri Rama 9701365524
8686807070
Ayodhya Nagar (1No) in Ward No.12,
Karmanghat of L.B.Nagar Circle-III, GHMC.

AZTEC
Construction of Compound Wall for Open Spaces
CONSTRUCTION Sri G.Nikhil Reddy
30 3A 2 at Agriculture Colony (2 Nos) in Ward No.12, 21.00 To be started Site not cleared
S 9701365524
Karmanghat of L.B.Nagar Circle-III, GHMC.
9849644459
Construction of Compound Wall for Open Spaces THOTA
Sri G.Nikhil Reddy
31 3A 4 at Agriculture Colony (4Nos) in Ward No.12, 45.00 CHENNAIAH Completed
9701365524
Karmanghat of L.B.Nagar Circle-III, GHMC. 9246346268
Construction of Compound Wall for Open Spaces
SRI LAXMI
at Agriculture Colony (6Nos) in Ward No.12, Sri G.Nikhil Reddy
32 3A 6 36.50 BHAVANI To be started Site not cleared
Karmanghat of L.B.Nagar Circle-III, GHMC. 9701365524
WLCCS
(Reserved for SC/ST/WLCCS)
Construction of Compound Wall for Open Spaces
(6 nos) at Fatulguda, Chitra layout, Vyshya
33 3A 6 To be started Site Disputes
Graduates Co.op society (3nos), Indra Prastha
enclave
Omer Site Disputes Site Disputes
34 4B 1 Compound wall at Saleem Nagar Colony
9963550438 Court Case Court Case
CONSTRUCTION OF COMPOUND WALL
35 1 AND FENCING WITH HEAD LOAD TO Sri Rama Krishna
5 15.15 M A Khadeer Progress Due to Contractor delay
GRAVEYARD TAKYA DALMANDI NEAR 8008066911
MUSLIM JUNG PUL IN DHOOLPET DIVN.

5
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

CONSTRUCTION OF COMPOUND WALL WITH


19- Site Disputes
36 1 GHMC TYPE DESIGN FOR OPEN SPACE / PARK Sri Rama Krishna Court Case
5 AT APHB COLNY BAHADURPURA IN
10.75 Site Dispute
8008066911 21-Under Sanction
KISHANBAGH DIVN.

17- Site Disputes


37 38 Construction of compound wall for 38 nos open Site Disputes Court Case
5
spaces in various locations of, GHMC Court Case 21-Under Sanction

Construction of compound wall for open spaces in


38 1 Sy.No. 52 (P) of Kattedan (V) (Town Planning D Shravan Sagar
6 17.00 Completed
S.No. 3) in Ward No. 58 in Rajendranagar Circle, 13.10% Less
GHMC For Perimeter 189.40 Rmt.
Construction of compound wall for open spaces in
39 1 Sy.No. 52/1 (P) of Laxmiguda (V) (Town
6 10.00 R. RAJU Completed
Planning S.No. 6) in Ward No. 58 in
Rajendranagar Circle, GHMC
Construction of compound wall for open spaces in
40 1 Sy.No. 52 of Kattedan (V) (Town Planning S.No. Muqeet 2.99%
6 17.00 Completed
1) in Ward No. 58 in Rajendranagar Circle, Less
GHMC For Perimeter 193.75 Rmt.

Construction of compound wall for open spaces in


Sy.No. 156/1 (P) of Mailardevpally (V) (Town
41 1 Sri Kamadenuvu
6 Planning S.No. 120) in Ward No. 58 in 17.50 Completed
WLCCS
Rajendranagar Circle, GHMC For Perimeter 136.6
Rmt. (Reserved for SC/ST/WLCCS)
Construction of compound wall for open spaces in
Sy.No. 156/1 (P) of Mailardevpally (V) (Town
42 1 D Shravan Sagar
6 Planning S.No. 4) in Ward No. 58 in 20.00 Completed
12.2% Less
Rajendranagar Circle, GHMC For Perimeter 239.6
Rmt.
Construction of compound wall for open spaces in
Sy.No. 156/1 (P) of Mailardevpally (V) (Town
43 1 D Shravan Sagar
6 Planning S.No. 119) in Ward No. 58 in 12.70 Completed
12.01% Less
Rajendranagar Circle, GHMC For Perimeter 126.3
Rmt.
6
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound wall for open spaces in


Sy.No. 134/20 (P) of Mailardevpally (V) (Town
44 1 Muqeet 11.25%
6 Planning S.No. 118) in Ward No. 58 in 17.50 Completed
Less
Rajendranagar Circle, GHMC For Perimeter 196
Rmt.

Construction of Compound wall for open spaces


in Sy.No. 304 to 309, Manasa Hills, Budvel (V) Sri Lakshmi
45 6 1 (S.No.3) of Rajendranagar in Ward no.59 in 19.70 Manasa WLCCS Completed
Rajendranagar Circle-VI, GHMC For Perimeter LTD 5.55% Less
305.00 Rmt(Reserved for SC/ST/WLCCS)

Construction of Compound wall for open spaces


in Sy.No. 304 to 309, Manasa Hills, Budvel (V)
46 6 1 (S.No.2) of Rajendranagar in Ward no.59 in 19.00 Gunja Raju Completed
Rajendranagar Circle-VI, GHMC For Perimeter
290.00 Rmt

Construction of Compound wall for open spaces


in Sy.No. 304 to 309, Manasa Hills, Budvel (V)
47 1 M/s Babu Rao &
6 (S.No.1) of Rajendranagar in Ward no.59 in 32.20 Completed
Co 15.93% Less
Rajendranagar Circle-VI, GHMC For Perimeter
590.00 Rmt

Construction of compound wall for open spaces in


Sy.No. 26 of Laxmiguda (V) & 148 of Shivarathry
48 6 1 Mailardevpally (V) (Town Planning S.No. 67) in 10.30 Kumara Swamy Completed
Ward No. 58 in Rajendranagar Circle, GHMC For 6.99% Less
Perimeter 88.57 Rmt.

Construction of compound wall for open spaces in


Sy.No. 26 of Laxmiguda (V) & 148 of
49 1 D Shravan Sagar
6 Mailardevpally (V) (Town Planning S.No. 68) in 19.50 Completed
8.10% Less
Ward No. 58 in Rajendranagar Circle, GHMC For
Perimeter 231.21 Rmt.

7
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound wall for open spaces in


Sy.No. 52/1 of Laxmiguda (V) (Town Planning
50 1 Kartik WLCCS
6 S.No. 7) in Ward No. 58 in Rajendranagar Circle, 13.00 Completed
LTD 9.41% Less
GHMC For Perimeter 126.70 Rmt. (Reserved for
SC/ST/WLCCS)
Construction of compound wall for open spaces in
Sy.No. 52/1 (P) of Laxmiguda (V) (Town Shivarathry
51 6 1 Planning S.No. 5) in Ward No. 58 in 13.70 Kumara Swamy Completed
Rajendranagar Circle, GHMC For Perimeter 6.99% Less
143.20 Rmt.
Construction of compound wall for open spaces in
Sy.No. 156/1 (P) of Mailardevpally (V) (Town
52 1 Kartik WLCCS
6 Planning S.No. 125) in Ward No. 58 in 14.50 Completed
LTD 9.41% Less
Rajendranagar Circle, GHMC For Perimeter 151.8
Rmt. (Reserved for SC/ST/WLCCS)

Construction of compound wall for open spaces in


Sy.No. 156/1 (P) of Mailardevpally (V) (Town
53 1 Sri Kamadenuvu Work delayed due to Local
6 Planning S.No. 124) in Ward No. 58 in 19.20 Progress
WLCCS disputes
Rajendranagar Circle, GHMC For Perimeter 227.5
Rmt. (Reserved for SC/ST/WLCCS)

Construction of Compound wall for open spaces


in Sy.No. 304 to 309, Manasa Hills, Budvel (V)
54 1 Work delayed due to Local
6 (S.No.4) of Rajendranagar in Ward no.59 in 24.20 Gunja Raju Progress
disputes
Rajendranagar Circle-VI, GHMC For Perimeter
408.00 Rmt

Construction of compound wall for open spaces in


55 1 Sy.No. 26 of Laxmiguda (V) & 148 of Work delayed due to Local
6 9.50 E.GANESH Progress
Mailardevpally (V) (Town Planning S.No. 66) in disputes
Ward No. 58 in Rajendranagar Circle, GHMC

8
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound wall for open spaces in


Sy.No. 156/1 (P) of Mailardevpally (V) (Town Shivarathry
56 6 1 Planning S.No. 122) in Ward No. 58 in 12.70 Kumara Swamy To Be Started Due to Contractor delay
Rajendranagar Circle, GHMC For Perimeter 127.3 6.99% Less
Rmt.

Construction of compound wall for open spaces in


Sy.No. 156/1 (P) of Mailardevpally (V) (Town
57 1 Aga Constructions
6 Planning S.No. 123) in Ward No. 58 in 16.00 To Be Started Due to Contractor delay
11.99% Less
Rajendranagar Circle, GHMC For Perimeter 170.6
Rmt.

Construction of compound wall for open spaces in


Sy.No. 156/1 (P) of Mailardevpally (V) (Town
58 1 Aga Constructions
6 Planning S.No. 121) in Ward No. 58 in 12.70 To Be Started Due to Contractor delay
11.99% Less
Rajendranagar Circle, GHMC For Perimeter 127.3
Rmt.

Construction of compound wall for open spaces in


59 1 Sy.No. 26 of Laxmiguda (V) & 148 of
6 10.00 E.GANESH To Be Started Due to Contractor delay
Mailardevpally (V) (Town Planning S.No. 69) in
Ward No. 58 in Rajendranagar Circle, GHMC

Construction of compound wall for open spaces in


60 1 Sy.No. 52 (P) of Kattedan (V) (Town Planning CHAKRAVARTHI
6 9.50 To Be Started Due to Contractor delay
S.No. 2) in Ward No. 58 in Rajendranagar Circle, WLCCS
GHMC (Reserved for SC,ST,WLCCS Societies)

Construction of compound wall for open spaces in


61 1 Sy.No. 18/2 (P) of Upperpally (V) Ward No. 60, MS SHIVA
6 10.00 To Be Started Due to Contractor delay
Attapur in Rajendranagar (Town Planning Sy.No. GANESH WLCCS
18/2(P) =1) in Rajendranagar Circle, GHMC

9
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound wall for open spaces in


Sy.No. 32,33,29(P) of 30((P) & 34 (Part) Ashok
62 6 1 Vihar -I of Upperpally (V) Ward No. 60, Attapur 7.60 A RAM REDDY To Be Started Due to Contractor delay
in Rajendranagar (Town Planning S.No. 59) in
Rajendranagar Circle, GHMC

Construction of Compound wall for open spaces


in Sy.No 32,33,29(P) of 30(P) & 34 (Part) Ashok
Shivarathry
63 1 Vihar-1 of Upperpally (V) Ward No. 60. Attapur
6 11.60 Anjaneyulu To Be Started Due to Contractor delay
in Rajendranagar (Town Planning S.No. 56) in
9885717812
Rajendranagar Circle, GHMC For Perimeter
155.00 Rmt

Construction of compound wall for open spaces in


Sy.No. 18/2(P) of Upperpally (V) Ward No. 60
64 1 Mohd Hafeez
6 Attapur in Rajendranagar (Town Planning 12.00 To Be Started Due to Contractor delay
11.99% Less
Sy.No.18/2 (P)=2) in Rajendranagar Circle-6,
GHMC For Perimeter 162.00 Rmt.
Construction of compound wall for open spaces in
Sy.No. 134/20 of Sashtripuram (V) (Town
65 1 D Shravan Sagar
6 Planning S.No. 140) in Ward No. 57 in 25.00 To Be Started Due to Contractor delay
9.00% Less
Rajendranagar Circle, GHMC For Perimeter 326
Rmt.
66 22 Construction of compound wall at 22 locations at
6 To Be Started Site Disputes
various places Rajendranagar Circle, GHMC
67 9A 1 Mother dairy play ground, Bagh Lingampally 2.35 Completed
68 9A 1 Open space at Jawahar Nagar Community hall 5.70 Completed
At Ashta Laxmi Temple, Labour Commissioner Office
69 9A 1 10.00 Completed
Road
Near H. No. 1-10-161 Opp. labour Commissioner
70 9A 1 6.70 Completed
Office

71 9B 1 Opp.Side H.No.2-3-722//A Zinda Telismath Road 1.00


Sri N. Devender MS SANTOOSH
Completed
sagar 9701365525

72 9B 1 CIB Quarters - - Site Dispute Existing Temple


Kachiguda Railway Station Opp: Veeranna Gutta PRERANA PANDA
73 9B 1 Kachiguda
1.50 -
9000114870
Completed

10
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Kachiguda Railway Station Opp: Veeranna Gutta Kannka Someshwara PRERANA PANDA
74 9B 1 Kachiguda
5.00 To be started Due to Existing Temple problem
WLCCS 9000114870

75 10A 1 Jayprakash Nagar, Balkampet 2.7


M/s Sree laxmi Mohan Completed
wlccs
76 10A 1 3.75
M/s Sree laxmi Completed
LIGH Housing Board Colony Ashok Rao
wlccs
77 10A 1 NISHAT Bagh Begumpet 8.25
M/s Sree laxmi Ashok Rao Completed
wlccs
Construction of compound wall to open space at Plot
78 10B 1 No. 722 (South Side) in Road No. 37 Jubilee Hills Div 37.62 Sri K. Subramanyam Mohan Rao, AE Completed
No. 10B, CZ, GHMC (3rd Re-call)
Construction of Compound Wall balanced portion at
GHMC park Beside Plot No-61 and Providing of
M/s.N. Babu Rao &
79 10B 1 Footpath from Andhra Jyothi Press to Plot No-61 at 15.00 Mohan Rao, AE Completed
Co
GHMC park Ashwini Layhout, Jubilee Hills, Div-10B,
CZ, GHMC
Construction of compound wall to open space at Plot
Sri Varikuppala
80 10B 1 No. 722 (East Side) in Road No. 37 Jubilee Hills Div 41.37 Mohan Rao, AE Completed
Ramesh
No. 10B, CZ, GHMC
Construction of compound wall to open space at Plot
M/s.Kiran SC LCCS
81 10B 1 No. 745,744 & 743 in Road No. 37 Jubilee Hills Div No. 49.80 Mohan Rao, AE Completed
Ltd
10B, CZ, GHMC
Construction of compound wall to open space at Road
M/s.Suryodaya
82 10B 1 No.86 beside Plot No. 443- A54,A55,A56,A58,A59, 46.30 Mohan Rao, AE Completed
Constructions
Jubilee Hills Div No. 10B, CZ, GHMC
Construction of Compound Wall in the open space
abutting to Govt. land near Darga in Jubilee Hills, M/s.N. Babu Rao &
83 10B 1 35.00 Mohan Rao, AE Completed
Cooperative House Building Society, Div No.10B (CZ) Co
GHMC
Construction of Compound Wall in the open space
from existing Compound Wall between Govt. land M/s.N. Babu Rao &
84 10B 1 38.50 Mohan Rao, AE Completed
and Park in Jubilee Hills, Cooperative House Building Co
Society, Div No.10B (CZ) GHMC

11
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Construction of compound wall to open space (a) at
Road No. 86 beside Plot No. 488, Jubilee Hills Div No.
M/s.Shiva Ganga SC
85 10B 1 10B, CZ, GHMC (b) from Plot No. 008 to 035 at 49.80 B. Shanker, AE Progress
ST WLCCS Ltd.
Prosper valley (OU Colony) Shaikpet, Div No. 10B,
CZ,GHMC.
Construction of Compound wall to layout open space
for gap portion beside Hakeem Baba Darga at rock Sri L. Karunakar
86 10B 1 29.90 Mohan Rao, AE Completed
garden, Road No. 86, Film Nagar Jubilee hills Div No. Reddy
10B, CZ, GHMC. (1st Re-call)
Construction of Compound Wall to the GHMC open Progress
Sri Mohd. Ahmed
87 10B 1 place Krishnapuram at Road No.10, Banjara Hills, Div- 41.10 Ashok Kumar AEE RR masonry RR masonry work is in progress
Hussain
10B, (CZ), GHMC work
Construction of compound wall to open space (a) at
Plot No. 775C in Road No. 45 Jubilee Hills Div No. M/s.Suryodaya Work will be completed with in a
88 10B 1 44.75 Mohan Rao, AE Progress
10B, CZ, GHMC (b) Plot No. 990A in Road No. 46 Constructions week time
Jubilee Hills Div No. 10B, CZ,GHMC.
Construction of Compound wall to Open space (a)
rear side of Plot No. 13 & 14 MLA Colony Banjara M/s.YMR
89 10B 1 42.23 Ashok Kumar AEE Completed
Hills Div. No. 10B, CZ, GHMC. (b) at HUDA Layout Constructions
Banjara Hills Div. No. 10B, CZ, GHMC.
Construction of Compound wall at Kothacheruvu for
90 10B 1 beautification of tank in Shaikpet, Div-10B, (CZ), 48.55 Sri P Venkanna B. Shanker, AE Completed
GHMC.
Construction of Compound Wall to GHMC Open
space (a) at Kamalapuri colony Srinagar colony, Div M/s.Sree Laxmi
91 10B 1 27.01 Ashok Kumar AEE To be started Site not clear
No. 10B, CZ, GHMC. (b) at Plot No. 317/A/D MLA WLCCS LTD
Colony Banjara Hills Div. No. 10B, CZ, GHMC.
Construction of Compound wall to Open space (a)
adjacent to Plot No. 37 & 43 MLA Colony Banjara Hills
92 10B 1 35.55 Sri B. Veera Reddy Ashok Kumar AEE To be started Site not clear
Div. No. 10B, CZ, GHMC. (b) at Roja Ramadevi house
Banjara Hills Div no. 10B, CZ, GHMC.
Construction of Compound wall to Open space (a)
93 10B 1 rear of Plot No. 53 to 65 MLA Colony Banjara Hills 41.18 Sri Mohd. Osman Ashok Kumar AEE To be started Site not clear
Div. No. 10B, CZ, GHMC.
Construction of Compound wall to Open space (a)
rear of Plot No. 134 MLA Colony Banjara Hills Div. M/s.YMR
94 10B 1 38.86 Ashok Kumar AEE To be started Site not clear
No. 10B, CZ, GHMC.(b) at Khazimunnisa & Others Constructions
house Banjara Hills Div No. 10B, CZ, GHMC.

12
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Construction of Compound wall to Open space (a) at
P. Satya Narayana & Others House Banjara Hills Div.
95 10B 1 No. 10B, CZ, GHMC.(b) at Mahaveer Co-Operative 42.62 M/s.APWLCCS LTD Ashok Kumar AEE To be started Site not clear
Society Road No.10 Banjara Hills Div No. 10B, CZ,
GHMC.
Construction of compound wall to open space at Plot
M/s.Sri Sai
96 10B 1 No. 722 (North Side) in Road No. 37 Jubilee Hills Div 45.12 Mohan Rao, AE To be started Site not clear
Constructions & Co
No. 10B, CZ, GHMC
Construction of compound wall to open space at Plot
M/s.Sri Sai
97 10B 1 No. 710 in Road No. 36, Jubilee Hills Div No. 10B, CZ, 49.75 Mohan Rao, AE To be started Site not clear
Constructions & Co
GHMC
Construction of compound wall to open space (a) at
Plot No. 899A in Road No. 46 Jubilee Hills Div No. M/s.YMR
98 10B 1 45.94 Mohan Rao, AE To be started Site not clear
10B, CZ, GHMC (b) Plot No. 1090 in Road No. 55 Constructions
Jubilee Hills Div No. 10B, CZ,GHMC.

Construction of compound wall to open space at Park MOHAMMED B.Kanakaiah


99 11 1 1,2 &3 of TNGO’s (Secretariat Colony)Gachibowli in 49.30 MUJEEB 9704345024 Completed
Serilingampally Division-11, West Zone, GHMC. 9866185564

Construction of compound wall to open space at Park MODALASRINIVA B.Kanakaiah


100 11 1 4,5,6 & 7 of TNGO’s (Secretariat Colony)Gachibowli 50.00 SULU 9704345024 Completed Grill work is in progress
in Serilingampally Division-11, West Zone, GHMC. 9849529275

Construction of compound wall to open space at Park B.Kanakaiah


MOHAMMED
101 1 8,9,10 & 11 of TNGO’s (Secretariat
11
Colony)Gachibowli in Serilingampally Division-11,
43.10 MUJEEB 9704345024 Completed
9866185564
West Zone, GHMC.

Construction of compound wall to open space at Park B.Kanakaiah


MOHAMMED
102 1 12,13 & 14 of TNGO’s (Secretariat
11
Colony)Gachibowli in Serilingampally Division-11,
38.50 MUJEEB 9704345024 Completed
9866185564
West Zone, GHMC.
Construction of compound wall with pre-fab blocks at APHB T. Sunil Kumar
103 14A 1 6th phase Mini Rythu Bazar in Ward no. 117 of GHMC, 5.77 (9246540855) A.Rupadevi To be Started Site not identified
Kukatpally Circle (New ward no. 114)
Construction of compound wall with pre-fab blocks at APHB WALTHATY SESHADRI
104 14A 1 3rd phase, LIG 88, 102, 105 in Ward No. 117 of GHMC, 2.00 SESHANDER RAO A.Rupadevi To be Started Site not clear
Kukatpally Circle - 14A (New Ward No. 115) 7416603604

13
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of compound wall with pre-fab blocks at APHB Skandaya


Infrastructures Pvt
105 14A 1 3rd LIG 117, 116, 76 in Ward no. 117 of GHMC, Kukatpally 1.47 Ltd., A.Rupadevi To be Started Site not clear
Circle-14A (New ward no. 115)
(9347776267 )
Construction of compound wall with pre-fab blocks at APHB
106 14A 1 3rd MIG 190 in Ward no. 117 of GHMC, Kukatpally Circle- 2.45 Eppalapally Anil Kumar A.Rupadevi To be Started Site not clear
14A (New ward no. 114)
Construction of compound wall with pre-fab blocks at APHB G. Satish Kumar
107 14A 1 3rd 120 feet road in Ward no. 117 of GHMC, Kukatpally 3.21 (8106088883) A.Rupadevi To be Started Site not clear
Circle-14A (New ward no. 114)
Construction of compound wall with pre-fab blocks at APHB T. Sunil Kumar
108 14A 1 3rd LIG 5, LIG 3 in Ward no. 117 of GHMC, Kukatpally 3.44
(9246540855) A.Rupadevi To be Started Site not clear
Circle-14A (New ward no. 114)
Construction of compound wall with pre-fab blocks at APHB D. Goverdhan
109 14A 1 3rd LIG 145, LIG 132 in Ward no. 117 of GHMC, Kukatpally 2.00 Eppalapally Anil Kumar To be Started Site not clear
Circle-14A (New ward no. 115) Goud
Construction of compound wall with pre-fab blocks at 3rd G. Satish Kumar D. Goverdhan
110 14A 1 Phase LIG 135, LIG 142 in Ward no. 117 of GHMC, 2.53 (8106088883) To be Started Site not clear
Kukatpally Circle-14A (New ward no. 115) Goud
Construction of compound wall with pre-fab blocks at 3rd J. Srinivasa Rao D. Goverdhan
111 14A 1 Phase LIG 137, 140 in Ward no. 117 of GHMC, Kukatpally 2.15 9347008939 To be Started Site not clear
Circle-14A (New wsard no. 115) Goud
Construction of compound wall with pre-fab blocks at 3rd D. Goverdhan
J. Srinivasa Rao
112 14A 1 Phase Nala Phase - I & II in Ward no. 117 of GHMC, 1.92 9347008939 To be Started Site not clear
Kukatpally Circle-14A (New ward no. 115) Goud
Construction of compound wall with pre-fab blocks at 3rd Krishna Sagar KP progress(earth
113 14A 1 Phase, LIG- 107, 106, 111, 108 in Ward no. 117 of GHMC, 1.39 (9705043129 ) A.Rupadevi work completed)
Kukatpally Circle-14A (New ward no. 114)
Construction of compound wall with pre-fab blocks at
Vasanth Nagar, Kukatpally in Ward no. 117 of GHMC, Sri Vijaya Laxmi WLCCS
114 14A 1 Kukatpally Circle-14A (New ward no. 114) (Reservation 5.35 (9030868984) A.Rupadevi To be Started Site not clear
work)
Construction of compound wall with pre-fab blocks at KPHB VJS Infrastructures D. Goverdhan
115 14A 1 Phase-I & II Kukatpally in Ward no. 117 of GHMC, 9.52 (9603119097 ) To be Started Site not clear
Kukatpally Circle-14A (New ward no. 115) Goud
Construction of compound wall with pre-fab blocks at Srila
VJS Infrastructures
116 14A 1 park pride open site in Ward no. 117 of GHMC, Kukatpally 9.22 (9603119097 ) A.Rupadevi To be Started Site not clear
Circle-14A (New ward 114)

14
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Construction of compound wall with pre-fab blocks at G. VJS Infrastructures
117 14A 1 Pratap Reddy, Vishvambara enclave Srila pride in Ward no. 7.34 (9603119097 ) A.Rupadevi completed
117 of GHMC, Kukatpally Circle-14A (New ward 114)
Construction of compound wall with pre-fab blocks at Srila VJS Infrastructures
118 14A 1 pride (Septic tank) in Ward no. 117 of GHMC, Kukatpally 9.29 (9603119097 ) A.Rupadevi Site Dispute
Circle-14A (New ward 114)
Construction of compound wall with pre-fab blocks at KPHB
G. Satish Kumar progress(earth
119 14A 1 Colony Phase -IX in Ward no. 117 of GHMC, Kukatpally 3.29
(8106088883) A.Rupadevi work completed)
Circle-14A (New ward 114)

Construction of compound wall with pre-fab blocks at RR Town M.S. V.J.S Infrastructure
120 14B 1 Ship Kukatpally in Ward No. 121 of GHMC, Kukatpally Circle (9603119097 ) Completed

Construction of compound wall with pre-fab blocks at Ramraj Walthaty Seshadri


121 14B 1 Colony diary form road in Ward No. 121 of GHMC, Kukatpally 2.91 Seshander rao S. Raghu Site Dispute
Circle 7416603604

Construction of compound wall with pre-fab blocks at M.S. V.J.S Infrastructure


122 14B 1 Ferozguda, Phool Bhag Road in Ward No. 121 of GHMC, 4.70 (9603119097 ) S. Raghu Site Dispute
Kukatpally Circle

Construction of compound wall with pre-fab blocks at HMT M.S. V.J.S Infrastructure
123 14B 1 Hills water tank in Ward No. 124 of GHMC, Kukatpally Circle 5.66 (9603119097 ) D. Ramesh Completed

Package No.2 Construction of Pre-cast


Compound Wall to open space in 3 places in Sri. A.Papa Rao Sri
Aeronotics Employes colony opp Hsg society, at (-) 16.99% Less K.Ramachander
124 15 5 Telangana SPG &WVG mills patvari enclave and 49.26 Cell No. raju Completed
2 nos at Lady Enterpreneureof Gajullaramaram 9989269591 Ph
& Suraram colony of Ward no.125- No.7702775297
Gajularamaram Quthbullpur Mandal, RR District.

Sri. A.Papa Rao Sri


Package No.5 Construction of Pre-cast K.Ramachander
(-) 15.99% Less
125 Compound Wall to open space of 17 no. Sriram
15 17
Nagar Colony, Gajularamaram(V), Ward no.125-
48.15 Cell No. raju COMPLETED
9989269591 Ph
Gajularamaram Quthbullpur Mandal, GHMC.
No.7702775297

15
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Package No.3 Construction of Pre-cast
Compound Wall to open space in 2 places in
Sri. B.Srinivas Sri. N.Bhanu
APIIC Colony, Near Sigma Hospital,Godavari
(-) 15.69% Less
126 6 Homes(2 nos.),Raghavendra colony, Apuroopa Prathap Naidu
15 48.97 Cell No. Completed
colony(2nos) & Venkateshwara Enclave of Ph
9866190999
Jeedimatela (V) and Venkateshwara colony of no.9701365523
Ward no.130-Subash Nagar Quthbullpur Mandal,
RR District.
Construction of Pre-cast Compound Wall to open
127 15 20 space in 20 places Quthbullpur Mandal, RR 208.00 Completed
District.
128 Open space in Villa springs adjacent dargah,
16 1 18.80 G. Saidulu V. Kondal Rao Completed
Yapral (Sy.No.51P & 240) Open spaces-I & II
129 Open spaces in Andal Homes (HUDA Layout),
16 1 13.70 Chiluka Saidulu V. Kondal Rao Completed
Sy.No.21, 22, 70 & 77 to 82) Space-I
130 Open spaces in Andal Homes (HUDA Layout),
16 1 13.40 Chiluka Saidulu V. Kondal Rao Completed
Sy.No.21, 22, 70 & 77 to 82), Space-III
131 Open space in Villa springs adjacent dargah,
16 1 10.40 G. Saidulu V. Kondal Rao Completed
Yapral (Sy.No.51P & 240) Open spaces-VI
132 Open space in Villa springs adjacent dargah,
16 1 19.30 Gouni Ravi V. Kondal Rao Completed
Yapral (Sy.No.51P & 240) Open spaces-IV & V
133 Open spaces in Sy.No.127, 139 part of Yapral
16 1 41.00 Gouni Ravi V. Kondal Rao Completed
Village
134 16 1 Open spaces in Sy.No.134, 142 of Yapral Village 50.00 Chiluka Saidulu V. Kondal Rao Completed
135 Compound wall for graveyard in Sy.No.129, 131
16 1 30.00 Vemula Srinivasulu V. Kondal Rao Completed
& 133 of Macha Bollarum
136 Compound wall for open space in Sy.No.363, 364
16 1 11.20 Vemula Srinivasulu Completed
& 371, 372 in Indiranagar Colony, Khanajiguda
137 Compound wall for open space in Sy.No.50 in
16 1 14.70 Vemula Srinivasulu Completed
Venu Gopal Nagar Colony
Compound wall for open space in Sy.No.50 in
138 16 1 Venu Gopal Nagar Colony, 9.80 Vemula Srinivasulu Completed
Park-II

139 Compound wall for open space-3 in Sy.No.205 &


16 1 12.40 Gouni Saidulu Completed
206 at Gordhanpuri Gardens, Yapral
16
Name of the Name of the Present Status
Sl. Div No. of Name of the Work Amount of Agency / Contact Responsible Officer of work in Remarks
No. Works estimate No. detail
AE / AEE
1 2 3 4 5 6 7 8 9
Construction of prestressed, precast RCC Progress Work delay for local public
Sri.
140 16 9 boundary walls in various locations of Ward 39.00 T. Sunil Kumar Mark out objection
B.Maheshwar, AE
No.132 (9 nos) Given Earth work is in progress,
Construction of prestressed, precast RCC Progress Work delay for local public
Sri. V. Kondal
141 16 11 boundary walls in various locations of Ward 47.25 T.Sunil Kumar Mark out objection
Rao, AE
No.133 (11 nos) Given Earth work is in progress,
Construction of prestressed, precast RCC
boundary walls in various locations of Ward
No.133 (9 nos) 5 Packages (Railwal Progress Work delay for local public
Sri. V. Kondal
142 17 9 Underpass, R.K.Nagar, Uttam Nagar, Ever 172.20 T.Sunil Kumar Mark out objection
Rao, AE
Road Factory Moula Ali, APIIC, Jawahaer Given Earth work is in progress,
Nagar Colony, Near Neredmet Police Station,
Near Neredmet Police Station
Construction of prestressed, precast RCC
boundary walls in (2 nos) locations Srinidhi
143 18A 2 Colony 32.63 Completed
Layout, Warasiguda Open
Space
Construction of prestressed, precast RCC
boundary walls in (6 nos) locations,
Patigadda Layout, Open Space Lalapet,
144 18B 6 Padma Rao Nagar, New Bhoiguda, Open 32.63 To Be Started Site Dispute
Land Tarnaka, Mekalabanda
Play ground, B/s. Shopers
Stop Open Space

Total 350 3397.35