0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
75 Ansichten4 Seiten
This document provides a template for an inspection and test plan format. It outlines 6 main sections to be verified with various acceptance criteria and responsible parties. The sections include: 1) document control, 2) personnel qualification, 3) material procurement and inspection, 4) test equipment calibration, 5) non-conformance reporting, and 6) site planning, preparation, and works commencement. Various records are required to be generated including logs, registers, checklists, and reports. Inspections will occur on a regular basis, prior to commencement of works, during works, and for final inspection/acceptance.
This document provides a template for an inspection and test plan format. It outlines 6 main sections to be verified with various acceptance criteria and responsible parties. The sections include: 1) document control, 2) personnel qualification, 3) material procurement and inspection, 4) test equipment calibration, 5) non-conformance reporting, and 6) site planning, preparation, and works commencement. Various records are required to be generated including logs, registers, checklists, and reports. Inspections will occur on a regular basis, prior to commencement of works, during works, and for final inspection/acceptance.
This document provides a template for an inspection and test plan format. It outlines 6 main sections to be verified with various acceptance criteria and responsible parties. The sections include: 1) document control, 2) personnel qualification, 3) material procurement and inspection, 4) test equipment calibration, 5) non-conformance reporting, and 6) site planning, preparation, and works commencement. Various records are required to be generated including logs, registers, checklists, and reports. Inspections will occur on a regular basis, prior to commencement of works, during works, and for final inspection/acceptance.
No. To be Verified Frequency Acceptance Criteria Inspection Points Records to be Generated Activity Documents Person KM CONS CONT General Verify availability of approved QA/QC documents such as: Document / Each Contract, Manager / Document Control 1.0 PQP, MS, ITP, Drawings, previous Client Approval H H H Record Control inspection QCS Engineer, Register inspection / test, FAT report, RO2, KM RO3 QA/QC Approved personnel Personnel Approval / Qualification of Contract, 2.0 As required Manager, Client Approval H H H Control Register, Qualification contract required personnel QCS KM Qualification Certificates - Vendor / Supplier Approval Contract, Material - Material sample and approval Each QCS, QA/QC or Approved Material 3.0 Procurement & Client Approval H H H - Handling, transport, storage, inspection Manufacturer site engineer Control Register Inspection identification records, FAT Test instrument every use of Calibration QA/QC or Valid calibration of test 4.0 / Equipment Calibration Certificates instrument / sticker and Test W H H Calibration Log instrument / equipment calibration equipment certificate Engineer Findings / NCR - Identify Non-conformity QA/QC and Corrections, - Verify corrections and corrective Contract, 5.0 Case by case Manager / Client Acceptance W H H Finding / NCR Log Corrective actions taken QCS Engineer Actions - NCR close out Project billboards (project details Project QA/QC or and safety notices), Warning Specification, Site Planning Each site Site is in acceptable condition as 6.0 instruments, barricade, PPE, QCS, MS, W H H Project Billboards and HSE inspection engineer, per reference requirements complete tools, materials, Manufacturer HSE equipment’s requirements - Clearance of the site and Contract, required permits. Project Prior to Start of Each QA/QC or 6.1 - Tool box talk done Specification, Approved toolbox talk W H H Toolbox talk works inspection site engineer - Manufacturer recommendations QCS, - Check Earthing if required Manufacturer Inspection and Test Plan Format
Description Of Reference Responsible
No. To be Verified Frequency Acceptance Criteria Inspection Points Records to be Generated Activity Documents Person KM CONS CONT QA/QC or Requirements mentioned in the - Implementation of the works as Each site references Commencement Contract, Checklist, inspection and 6.2 per approved Method statement, Inspection/ engineer, W H H of Works QCS test results ITP, test HSE test engineer QA/QC or Requirements mentioned in the site references Procedure, manuals, safety Each Contract, Commencemen engineer, Checklist, inspection and 6.2 requirements, manufacturer Inspection / QCS, manuals, W H H t of Works HSE, test results recommendations test procedures Test Engineer QA/QC or Project site Each Checklist, inspection, and Final inspection Inspection and test records, Hand Specification, engineer, Requirements mentioned in the 6.3 Inspection / H H H test results, and hand / Acceptance over forms, over all site condition QCS, FAT, MS, HSE, references test over forms ITP Test Engineer
7.0 Substation Works / Cable Works
7.1
7.2
7.3
7.4 Inspection and Test Plan Format
Description Of Reference Responsible Records to be Generated
No. To be Verified Frequency Acceptance Criteria Inspection Points Activity Documents Person No
7.5
7.6
7.7
7.8
7.9 Inspection and Test Plan Format
Description Of Reference Responsible
No. To be Verified Frequency Acceptance Criteria Inspection Points Records to be Generated Activity Documents Person