RENCANA KEBUTUHAN KABEL FEEDER --> REAL LAPANGAN

VOLUME BANGUNAN RUAN LOKASI

SATUAN
G
REAL RUANG
POWE
BQ LAPANGA SELISIH LUAR DALAM GENSE
R
N T
HOUS
→ NYY (8 x 1C x 240) sqmm 210.0 188.6 21.40 m' 115.8 54.5 E
18.3 0
→ NYY (8 x 1C x 240) sqmm 230.0 220.8 9.20 m' 115.8 86.7 18.3 0
→ NYY (8 x 1C x 240) sqmm 210.0 188.6 21.40 m' 115.8 54.5 18.3 0
berubah → NYY (4 x 1C x 240) sqmm 230.0 291.5 (61.50) m' 121.2 152 18.3 0
berubah → NYY (4 x 1C x 240) sqmm 230.0 294.1 (64.10) m' 121.2 152 0 20.9
→ FRC 4 x 10 sqmm 145.0 159.0 (14.00) m' 121.2 37.8 0 0
→ NYY 4 x 35 sqmm 105.0 121.2 (16.20) m' 121.2 0 0 0
→ NYY 4C x 120 sqmm 65.0 71.2 (6.20) m' 71.2 0 0 0
→ NYY 4C x 16 sqmm (PP-PL.1) 140.0 29.0 ### m' 29 0 0 0
bertambah→ NYY 4C x 16 sqmm (PP-PL.2) 156.0 156.0 0.00 m' 156 0 0 0
→ NYY (4 x 1C x 185) sqmm 270.0 233.4 36.60 m' 121.2 112.2 0 0
→ FRC 4 x 150 sqmm 239.0 188.7 50.30 m' 121.2 67.5 0 0
LOKASI

SPARE
RUANG
KONTRO ATAP
L
0 0 0%
0 0 0%
0 0 0%
0 0 0%
0 0 0%
20 0 0%
0 0 0%
0 0 0%
0 0 0%
0 0 0%
0 56.4 0%
0 56.4 0%
BOBOT
NO ITEM PEKERJAAN VOLUMESATUANHARGA SATUANJUMLAH HARGA PEKERJAA
N
1. Pekerjaan Boring Tanah Grounding 13.0 titik 4,465,000.0 58,045,000.0 34.58%
incl. Box Control dan Material Bantu
2. Pemasangan Cooper Rod dan Split Cooper 13.0 titik 4,607,500.0 59,897,500.0 35.68%
incl. Material Bantu
3. Instalasi Grounding, NYA 1 x 70 mm2 (MVMDP), R. POWER HOUSE 1.0 titik 3,681,250.0 3,681,250.0 2.19%
4. Instalasi Grounding, NYA 1 x 70 mm2 (Body TRAFO), R. POWER H 1.0 titik 3,681,250.0 3,681,250.0 2.19%
5. Instalasi Grounding, NYA 1 x 70 mm2 (Netral TRAFO), R. POWER 1.0 titik 3,681,250.0 3,681,250.0 2.19%
6. Instalasi Grounding, NYA 1 x 120 mm2 (LVMDP), R. POWER HOUSE 1.0 titik 3,681,250.0 3,681,250.0 2.19%
7. Instalasi Grounding, NYA 1 x 120 mm2 (Body GENSET), R. GENSET 1.0 titik 4,712,000.0 4,712,000.0 2.81%
8. Instalasi Grounding, NYA 1 x 120 mm2 (Netral GENSET), R. GENSE 1.0 titik 4,712,000.0 4,712,000.0 2.81%
9. Instalasi Grounding, NYA 1 x 70 mm2 (SDP-IT R. Server), Lt. 5 Ge 1.0 titik 3,681,250.0 3,681,250.0 2.19%
10. Instalasi Grounding, NYA 1 x 70 mm2 (SERVER), Lt. 5 Gedung-A 1.0 titik 3,681,250.0 3,681,250.0 2.19%
11. Instalasi Grounding, NYA 1 x 70 mm2 (Panel ELEKTRONIK), Lt. Das 1.0 titik 3,681,250.0 3,681,250.0 2.19%
12. Instalasi Grounding, NYA 1 x 70 mm2 (Panel LIFT), Lt. ATAP Gedun 4.0 titik 3,681,250.0 14,725,000.0 8.77%

### 100.00%
BOBOT
JUMLAH HARGA PEKERJAA
N
75% 43,533,750.00 25.93%

75% 44,923,125.00 26.76%

50% 1,840,625.00 1.10%


50% 1,840,625.00 1.10%
50% 1,840,625.00 1.10%
0% - 0.00%
0% - 0.00%
0% - 0.00%
50% 1,840,625.00 1.10%
50% 1,840,625.00 1.10%
50% 1,840,625.00 1.10%
50% 7,362,500.00 4.39%

### 63.66%