THERMAL INSULATION DESIGN OF EGINA

SUBSEA PRODUCTION SYSTEM


Sunday OMOWUNMI - TEP Nigeria / EGINA Project
Julien ROLLAND - DEV/ED/ECP
CONTENTS

● Egina hydrate prevention philosophy

● SPS cooldown requirements

● Thermal analysis methodology

● Thermal analysis results

● Cooldown test results

Flow Assurance Days 2014 - 13 - 14 November - Pau 2


EGINA HYDRATE PREVENTION PHILOSOPHY

● Normal operation shall be outside hydrate formation zone.


● Thermal insulation of subsea equipment shall give required
cooldown time during shutdown (GS EP SPS 008).
● Hydrate inhibition by chemical injection during start up in early –
mid life.
- MeOH injection at the Xmas tree
- LDHI-AA injection at the manifold

● Hot dead oil re-circulation to warm up production loop during very


high WC in later life.
● Subsea preservation during shutdown.
- MeOH flushing of tubing, jumper and gas lift riser
- Dead oil circulation of production loop

Flow Assurance Days 2014 - 13 - 14 November - Pau 3


HYDRATE RISK - CONDITIONS DURING SU/SD

● Start up
- Cold restart: T ~ 4oC
- Aborted start up: 4 < T < 35 oC
- Warm restart: T > 35 oC Hydrate
zone!!!

● Shut down No risk of


Hydrate
- Long shut down: T ~ 4 oC Start up

- Short shut down: T > 35oC


Shut down

Flow Assurance Days 2014 - 13 - 14 November - Pau 4


SPS COOLDOWN REQUIREMENTS

● Xmas Tree Cooldown


requirement. XTree
Manifold
- 40 down to 23 °C in 8 hrs U/S Jumper

PWV MPP

- 40 down to 20 °C in 8 hrs D/S

OHTC [W/m2/K]
PWV PWV: Production Wing Valve

Girassol Dalia Rosa Moho Akpo Pazflor Usan Clov Girri Moho Moho Egina Kaombo
Bilondo 1bis North

● Challenges Fluid in
- Low Wellhead temperature
- Cold spots (valves, sensors,
injection points etc)

Cold wells (WHFT 32 oC) to be preserved in priority during production shutdown

Flow Assurance Days 2014 - 13 - 14 November - Pau 5


MANIFOLD COOLDOWN REQUIREMENTS

● Manifold Cooldown requirement


- Deadleg to be above 20 oC in Steady State
- X – 20 oC in 8 hrs in header and branch
deadleg
- 40 – 20 oC in 13 hrs elsewhere

● Challenges
- Low Wellhead temperature
- Cold spots (valves, sensors, injection
injection points etc)
- Long deadleg due to six-slot configuration

Flow Assurance Days 2014 - 13 - 14 November - Pau 6


THERMAL ANALYSIS METHODOLOGY

There are 3 Phases:

● Phase 1: Calibration of analysis methodology by FEA/CFD modelling


and Pilot cooldown test.

● Phase 2: Thermal insulation design by thermal analysis for each


subsea equipment, subsystems and systems in order to meet the
cooldown requirement.

● Phase 3: Thermal analyses of actual “test setup” to verify insulation


design by comparing results from modelling and Cool down test.

Flow Assurance Days 2014 - 13 - 14 November - Pau 7


THERMAL ANALYSIS METHODOLOGY (PHASE 1)
Estimation of thermal input parameters for FEA
Artificial thermal conductivity, Keff
Convective Conductive

External Heat transfer coefficient, eHTC


AND

Churchill-Bernstein, forced convection

Internal Heat transfer coefficient, iHTC

Churchill and Chu, free convection (Cooldown)

Other iHTC correlations for forced convection (Steady state)

Flow Assurance Days 2014 - 13 - 14 November - Pau 8


THERMAL ANALYSIS METHODOLOGY (PHASE 1)

Internal Heat transfer coefficient, iHTC

Flow Assurance Days 2014 - 13 - 14 November - Pau 9


XMAS TREE - FEA SET UP (PHASE 2)
Project Rosa Moho Clov Egina
Insulation thickness (inches) 3 NA 3 1/4 4 1/4

Insulation volume (liters) 2,200 3,500 4,700 5,600

Isometric view with insulation Cross sectional view Isometric view without insulation

PSV Cavity
(ref. only)

Flow Assurance Days 2014 - 13 - 14 November - Pau 10


XMAS TREE - FEA RESULTS (PHASE 2)
Gas initially at 40 oC

23 oC
20 oC

Flow Assurance Days 2014 - 13 - 14 November - Pau 11


MANIFOLD DEAD LEG CFD RESULTS (PHASE 2)
Gas initially at 40 oC – temperature after 8 hrs of Cooldown
● Bulk temperature in header (volume average) of 22 oC.
● Coldest location 14.7 oC - at wall of gate valve in shut-in position.

Coldest location in
contact with live fluid

Flow Assurance Days 2014 - 13 - 14 November - Pau 12


MANIFOLD DEAD LEG CFD RESULTS (PHASE 2)

Oil initially at 40 oC – temperature after 8 hrs of Cooldown


● Bulk temperature (volume average) of 28 oC.
● Coldest location 13.5 oC - at wall of gate valve in shut-in position.

Coldest location in
contact with live fluid

Flow Assurance Days 2014 - 13 - 14 November - Pau 13


MANIFOLD DEAD LEG CFD RESULTS (PHASE 2)
Coldest Location on Gate Valve

Egina Gas Egina Oil Unit


Momentum diffusivity, n = µ/r 1.6E-07 1.1E-05 m2/s

Thermal diffusivity, a = k /r Cp 1.6E-07 7.6E-08 m2/s


Pr indicates the relative thickness of
Prandtl number, n /a = µCp/k 1.0 144.5 momentum and thermal boundary layers

Gas Oil

14.7 oC 13.5 oC

Flow Assurance Days 2014 - 13 - 14 November - Pau 14


COOLDOWN TEST (PHASE 3)
Cooldown tests scheduled between 2014 and 2016

Subsystem / System CDT Part of (System) Location Status


Gate valve Manifold branch Norway Completed
Ball valve Manifold header Norway Completed
Connectors XT and Manifold Norway Pending
MPFM Manifold Norway Pending
Choke Valve XT Norway Pending
Manifold header dead leg Manifold Norway Pending
XT System Norway Pending
Manifold System Nigeria Pending

Test site
Test tank

Flow Assurance Days 2014 - 13 - 14 November - Pau 15


COOLDOWN TEST RESULT (PHASE 3)
5 1/8” Manifold Gate Valve
Test set up
Valve actuator
piping
Valve body

Flow Assurance Days 2014 - 13 - 14 November - Pau 16


WAY FORWARD – HYDRATE RISK ASSESSMENT

● Impact of geometry and phase segregation.

● Design criteria vs actual field conditions.


- Evolution of Well head temperature and pressure as watercut increases

● Stoichiometry of stagnant phases.


- Water/gas ratio required to form hydrate plug (watercut, GOR)

● Propensity of Egina crude to form hydrate.


- Lab test at different subcooling

● Operator guide manual for proper risk assessment

Flow Assurance Days 2014 - 13 - 14 November - Pau 17


Bedankt
gracias Terima Kasih
Cám ơn
谢谢
Thank you

merci
спасибо

Obrigado
‫ﺷﻛﺭﺍ‬
Tusen takk
Flow Assurance Days 2014 - 13 - 14 November - Pau 18
BACK-UP

Flow Assurance Days 2014 - 13 - 14 November - Pau 19


EGINA HYDRATE CURVE

Flow Assurance Days 2014 - 13 - 14 November - Pau 20


SPS COOLDOWN REQUIREMENTS

Xmas Tree Cooldown requirement


● 40 (32) – 23 oC in 8 hrs U/S PWV
● 40 (32) – 20 oC in 8 hrs D/S PWV

Challenges
● Low Wellhead temperature
● Many cold spots (valves, sensors, choke etc)

Flow Assurance Days 2014 - 13 - 14 November - Pau 21


XMAS TREE FEA RESULTS
Gas initially at 32 oC and 0.25 m/s after 8 hrs of cooldown

Cold wells (WHFT 32 oC) to be preserved in priority during production


shutdown

Flow Assurance Days 2014 - 13 - 14 November - Pau 22


WELLHEAD FLOWING TEMPERATURES
Temperature {oC} Temperature {oC}
# Well # Well
Min Max Average Min Max Average
1 A_P1 33.0 47.4 40.2 12
C_P2 61.6 71.2 66.4
2 A_P3 34.7 48.6 41.7 46.0 13 58.8
B_P2 50.4 60.6 55.5
3 B_22 53.1 58.9 56.0 14
B_P3 52.7 60.2 56.5

4 A_P2 44.7 48.3 46.5 15 B_P4 52.3 59.2 55.8


49.3
5 A_P5 43.3 47.6 45.5 16 B_P5 56.2 59.1 57.7
58.6
6 BP_10 51.8 60.1 56.0 17 B_P9 56.6 57.8 57.2

7 A_P2B 42.9 47.7 45.3 18 C_P1 57.6 69.9 63.8

8 B_P7 51.1 55.9 53.5 19 B_P7B 52.9 55.3 54.1


52.7
52.3
9 B_P6E 45.9 59.8 52.9 20 B_P6D 45.2 58.6 51.9

10 B_P12 57.4 61.2 59.3 21 B_P8 46.5 55.2 50.9

11 B_P1 53.5 60.5 57.0

Flow Assurance Days 2014 - 13 - 14 November - Pau 23


WELLHEAD FLOWING PRESSURES

Flow Assurance Days 2014 - 13 - 14 November - Pau 24


MANIFOLD GATE VALVE

Flow Assurance Days 2014 - 13 - 14 November - Pau 25


XMAS TREE MASTER VALVE

Flow Assurance Days 2014 - 13 - 14 November - Pau 26


XMAS TREE – BOUNDARY CONDITIONS (PHASE 2)

Well CFD Well CFD

Flow Assurance Days 2014 - 13 - 14 November - Pau 27


HEAT TRANSFER FUNDAMENTALS

r3

r2Heat transfer principles


Conduction r1
Forced convection
Free convection

Methods
Analytical
Numerical
FEA
CFD
Test

Flow Assurance Days 2014 - 13 - 14 November - Pau 28


DISCLAIMER and COPYRIGHT RESERVATION
The TOTAL GROUP is defined as TOTAL S.A. and its affiliates and shall include the person
and the entity making the presentation.
Disclaimer
This presentation may include forward-looking statements within the meaning of the Private
Securities Litigation Reform Act of 1995 with respect to the financial condition, results of
operations, business, strategy and plans of TOTAL GROUP that are subject to risk factors
and uncertainties caused by changes in, without limitation, technological development and
innovation, supply sources, legal framework, market conditions, political or economic
events.
TOTAL GROUP does not assume any obligation to update publicly any forward-looking
statement, whether as a result of new information, future events or otherwise. Further
information on factors which could affect the company’s financial results is provided in
documents filed by TOTAL GROUP with the French Autorité des Marchés Financiers and
the US Securities and Exchange Commission.
Accordingly, no reliance may be placed on the accuracy or correctness of any such
statements.
Copyright
All rights are reserved and all material in this presentation may not be reproduced without
the express written permission of the TOTAL GROUP.

Flow Assurance Days 2014 - 13 - 14 November - Pau ● 29