CASCADE Air Lines

DATE VERIFIED
ONSHORE OPERATION DAILY MAINTENANCE REPORT
Company man Name Aamir Ameen
RIG NAME SLR-215

EEBA
SABA

SCBA
LOCATION Mitha 01 WELL No.: 1
USL H2S Support Engineer Amir Hamza STATIONS
DATE 8-Aug-18
Status

Monkey Board 1 1 8/8/2018


DAILY REQUIREMENTS Rig Floor 4 6 8/8/2018
Dog house 1 1 8/8/2018
Carried out regular inspection for all mesh guard devices overall around of RIG's H2S Office 1 8/8/2018
Regulary monitoring and inspect all Breathing Air supply - all HP & LP gauges, lines, manifolds, regulators, fittings, cascade racks for leaks and appropriate pressure readings. Shale shakers 2 3 8/8/2018
To Check fixed gas monitoring system for all stations . Muster station A 3 8/8/2018
To inspect & maintain all SCBAs & SABAs. Muster Station B 3 8/8/2018
Conducting, H2S awarness training as mandatory requirements for new commer, Visitor Orientations & H2S Refresh Trainings as required - and recorded accordingly Mud logging unit 8/8/2018
Actively monitoring the RIG operation Medic 1 8/8/2018
Actively and participate for all safety meetings
#REF!
and provide relevant input accordingly Company man office 2 8/8/2018
Rig manager office 1 8/8/2018
Cementing unit dowel 2 8/8/2018
Mud pits 2 3 8/8/2018
ACTIVITIES FOR 24 HOURS : DAY & Night Amir Hamza Pump room 8/8/2018
Sack area 1 2 8/8/2018
* Participated in daily morning safety meeting. * Training Room 1 1 1 8/8/2018
* Installed electric cable for united safety container at rig site. * Choke manifold 1 3 8/8/2018
* Installed & function tested FMC controller at united safety office. * Client HSE 1 8/8/2018
* Installed relay box, magic cables, alarm bar, alarm bar cables, * Rig HSE 1 8/8/2018
flash light at different areas of rig. * Step oil tool 2 8/8/2018
* Installed 03 air horn with cables & splitters at main deck & rig floor * Enviromental office 1 8/8/2018
to cover whole site of rig. * Material man office 1 8/8/2018
* Installed manifold with regulator & l.p hoses for air horn at main deck & rig floor. * Mud engineer 2 8/8/2018
* Function tested air horn at rig site working fine. security 1 8/8/2018
* Done leak test & no leakage was found loop delivery working fine. Geologist 1 8/8/2018
* FMC controller, sensors & air loop delivery with cascade working fine. Rig ware house 1 8/8/2018
* Finished rig up with all double checks working good. PMS office 2 8/8/2018
* Done paper work & updated computer logs. Radio Room 1 8/8/2018
Mud logger 3 8/8/2018
DD unit 2 8/8/2018
Engine area 2 8/8/2018
Well head area 1 2 8/8/2018

MONTHLY REPORTS & SUBMISSION Fire, Abandon & H2S Drill

Mesh Guard calibration was done on 6 Aug 2018 & next due on 6 Sept Last Fire drill was conducted on 3 Aug 2018
Gas alert micro 5 & single gas clip bump tested on 6 Aug 2018 & next due on 6 Sept

TOTAL : 14 12 23 22

QUARTERLY ACCOMMODATIONS*
Cabin # Occupy N0. Cabin # Occup.N0. Cabin # Occup.N0

TOOLS & EQUIPMENT ONBOARD DETECTION SYSTEM Fixed sensors, ITX & GAS badges sensor calibration
NO. ITEMS QTY SERIAL NO. Station QTY TYPE LAST DATE NEXT DATE
Wire Brush 1 Main Deck 1 H2S 6-Aug-18 6-Sep-18
Bug Blowers - 30 inches in size 2 Rig Floor 1 H2S 6-Aug-18 6-Sep-18
Bull Hornes 1 Shale Shakers 1 H2S 6-Aug-18 6-Sep-18
Windsock w/Poles - Windsocks & Poles 2 Mud Pits 1 H2S 6-Aug-18 6-Sep-18
Intrinsically safe Torches - Flash Lights Well Head 1 H2S 6-Aug-18 6-Sep-18
Screw drivers 1 Choke Manifold 1 H2S 6-Aug-18 6-Sep-18
Rescue Stretcher
Oxygen Resuscitator
Air analysis Kit 1
Air analysis Test tubes 1
Digital Anometer 1
Allen Key Set 1
Cutter 1 Single Gas Clip 12 H2S 6-Aug-18 6-Sep-18
Pliers 1 Multi Gas Detector 3 H2S,LEL,CO,O2 6-Aug-18 6-Sep-18
Crescent Wrench 1 Rae Pump 2 Multi Tubes Nill Nill
Tool Bag 1
Printer 1
Voice amplifiers 3

PENDING ISSUES ACTION TAKEN

* POB in Chambers:
POB Total onboard = 144 Max. allowable POB =

BA on board & operational ( SCBA 2216psi & SABA 4500psi )


DAILY OPERATIONS SUMMARY MISCELLANEOUS / OTHER Cascade racks 3 ( With 6 cylinders)
Cascade Air Lines 23

Day Shift Rescue Team : Night Shift Rescue Team :


Crane C
Team # 1: Rig Manager, Roustabouts Team # 2: Doctor, Electrician, Mechanic
Rig: Cement Job

Amir Hamza
H2S Support Engineer