Method of Procedure implementation

of MBC

Initial Drafted by: EARIHHE Date: 18 Sept 2017

Reviewed by: Date:

Reviewed by: Date:

Approved by: Date:


MOP for implementation of MBC
_________________________________________________________________________________________________

Revision Record

Date Revised Version Change description Author

23 August
V2.0 Change Cabling diagram EARIHHE
2017

2
MOP for implementation of MBC
_________________________________________________________________________________________________

Table of Contents

1 EXECUTIVE SUMMARY............................................................................................................4
2 BACKGROUND AND OBJECTIVES.............................................................................................5
3 SCOPE OF WORK.....................................................................................................................6
4 DETAIL TIME TABLE OF OVERALL ACTIVITY.............................................................................7
5 DETAIL OPERATION AND EXECUTION......................................................................................8
6 SERVICE AND AREA IMPACT....................................................................................................9
7 TESTING AND VERIFICATION.................................................................................................10
8 ROLLBACK OPERATION..........................................................................................................12
9 PERSON IN CHARGE..............................................................................................................13
10 SUPPORTING DOCUMENTS...................................................................................................14

3
MOP for implementation of MBC
_________________________________________________________________________________________________

1 EXECUTIVE SUMMARY

- The purpose of this document to facilitate identifying and communicating the key steps
and actions required as part of the said MBC Activation and to ensure that ALL parties
are aware of the documentation that is required. All parties must sign the MOP for the
upgrade to commence if satisfied that all roles, responsibilities & actions are clearly
understood and in place. On completion of the full upgrade procedure, all parties must,
again sign the MOP listing any outstanding items identified with a specified completion
date. It is not the intention of this document to replace any of the implementation
procedures nor is it part of the standard deliverables.
- The involved NE descript in the NIW Request by Ericsson Project (ITC Coordinator or
Implementation Manager)
- The impact activity will cause outage during implementation on correlated node
- Correlated node will be down for 1 Hour during configuration.
- Before activity prerequisites of this activity should be fulfilled such as
 NIW Approval from Customer
 RBS Health Check
 Access to enter site should be secure
 RBS Should have No Major Alarm, any major Alarm should be got approval from
Customer via ITC Coordinator or Ericsson Implementation Manager

4
MOP for implementation of MBC
_________________________________________________________________________________________________

2 BACKGROUND AND OBJECTIVES

The objective of MBC Activation :

- Perform MBC Activation with existing configuration preparation for activation LTE
Upgrade Bandwidth 20 MHz

Diagram connection on sites:

5
MOP for implementation of MBC
_________________________________________________________________________________________________

3 SCOPE OF WORK

NO. ACTIVITIES Ericsson Indosat

PREPARATION

1 Pre-Health Check (Node)

Troubleshooting on Existing Node (any HW Faulty


2
and not ready due to error) prior MBC execution
Site Access (Permit Letter for Site access & Site Key)
3
- Shelter Room
Execution

1 Pre-Health Check (Node)

2 Activation MBC

3 SSV basic test call after

4 Post Health Check (Node)

Site Access (Permit Letter for Site access & Site Key)
5
- Shelter Room

Troubleshooting and Support HW Replacement if any


6
HW faulty

6
MOP for implementation of MBC
_________________________________________________________________________________________________

4 DETAIL TIME TABLE OF OVERALL ACTIVITY

Time Operation Detail Service Impact

10.00 –
Pre-Health Check No service impact
10.30
10.30 –
MBC Execution, including recabling Down 1 Hour during configuration
14.00
14.00 –
Perform testing services No service impact
15.00

Rollback operation (Put the exact time to take rollback decision)


15.00 –
Rollback escalation To decide and get rollback approval
15.10
15.10 –
Perform Backup No service impact
15.30
15.30 – Down 45 minutes during
Rollback execution
16.30 configuration
16.30 –
Perform testing services No service impact
17.00

7
MOP for implementation of MBC
_________________________________________________________________________________________________

5 DETAIL OPERATION AND EXECUTION

Below procedure activation:


1. Take Capture before as pre-log
2. Reconfigure of DUG 1

3. Reconfigure of DUG 2

8
MOP for implementation of MBC
_________________________________________________________________________________________________

4. Load BSC Parameter based on CDR


5. Reconfigure LTE by adding NGS MO
 Activate NGS as priority 1

6. Reconfigure U900 by adding NGS MO

 Activate NGS as priority 4

7. Take post-log for reporting

9
MOP for implementation of MBC
_________________________________________________________________________________________________

6 SERVICE AND AREA IMPACT

Summary of Disturbances
The table below shows a summary of the expected disturbances during the RBS implementation:

Type of disturbance Impact on the system Time duration


One RBS Node will down during
60 minutes.
RBS Node disturbances reconfiguration
Reconfiguration will cause calls in
progress to be disconnected at the 60 minutes.
reconfiguration
Subscriber disturbances

Call setup is not possible during the 60 minutes.


reconfiguration
All operator O&M activities towards the
RBS are prohibited during the entire
implementation.
Operator disturbances 60 minutes.
Nodes that interface the RBS may
display alarms related to the
implementation.

10
MOP for implementation of MBC
_________________________________________________________________________________________________

7 TESTING AND VERIFICATION

No Service test call

11
MOP for implementation of MBC
_________________________________________________________________________________________________

8 ROLLBACK OPERATION

Detailed of activity
- Fallback will be done in case either the site is not coming up at all or calls are not getting
matured for the RBS site.
- Decision of the fallback with the CU SPOC for the RBS site with approval from Customer
through ITC Coordinator and Implementation manager

Step of fallback
1. Change Back IDB
2. Reload CV Before executing

12
MOP for implementation of MBC
_________________________________________________________________________________________________

9 PERSON IN CHARGE

Phone
Name Company Number Roles and Responsibilities
Mochamad Ismail PT Indosat Tbk 0816803279 Project Manager
Edison Panjaitan PT Indosat Tbk 0816800642 Staf
Achmad Asikin PT Ericsson Indonesia 08161450989 Ericsson Customer Project Manager
Maming Yunianto PT Ericsson Indonesia 08111880108 Service Delivery Manager (CNS)
Sugeng rahmanto PT Ericsson Indonesia 081514338513 Ericsson ITC Coordinator
Ari Hendra H PT Ericsson Indonesia 08119304755 Ericsson TAC Team Lead
Henry Erik Estrada PT Ericsson Indonesia 081905013686 Ericsson RNC / BSC Team Lead
CNS Emergency PT Ericsson Indonesia 085584033872 Hot Line Number Emergency Support

User Access Lists :


Owner of user to implement activity:
Project
Vendor Operation
User ID User
emuhfah ☒ ☒ ☐
eahsany ☒ ☒ ☐
eabdari ☒ ☒ ☐

13
MOP for implementation of MBC
_________________________________________________________________________________________________

10 SUPPORTING DOCUMENTS

No Mandatory document Status

CPI DU Radio Node EN/LZN 720 0128 Available


1.
R4A

2.

14