LFC. Real-Time data and system topology are fed to the State
the point corresponding to each measurement . is the
and Load Estimation (SLE). SLE estimates the rest of the
function of bus voltage and load . Metering point is from
missing parameters such as non-monitored power flows in less
1 to . Apply network equation, measurement data set ,
critical feeders, consumption for loads, voltage levels at every and an appropriate optimization algorithm to equation (1), bus
connection point in the system. The results are then fed to the voltage v and all system loads l will be solved.
ED module as initial conditions. The ED takes the generator The one-line diagram in Fig. 2 shows a substation at an
heat rate curves to determine the efficiency of the unit with industrial facility where typically only the main feeders are
respect to the generated output power. It also utilizes the fuel metered. Assuming that the network model, topological
cost per unit and the power exchange contract as defined relationships, and electrical parameters are properly defined,
through IS application. ED then determines the optimum the loading at each load can be estimated according to the
(most economic) generator outputs which is fed to the Load equation (1) through a specially developed optimization
LFC system. LFC utilizes the ED outputs as the base settings algorithm.
and corrects them for ACE reduction where the final output is
sent to the generator control systems. The voltage set points
are fed to the AVR control and respectively.
All of the above information must be made available to the
system dispatcher in a real-time, easy-to-use, concise, and
IEEE PES 2009 PSCE 3
(2)
subject to:
, 0 (3)
, ,
( 1,. . ., ) (4)
where is the active power generation from the
generator, the fuel cost function of the generator, the
number of generators on MW control, the system state
Fig. 2. Example of SLE in a Substation with Partially Measured Loads.
variable, the control variable, and the number of control
variables. Equation (3) is load flow equation, and equation (4)
SLE usually runs in a time interval of 1 to 5 seconds, is the control variable range limits.
depending on nature of system transients. In certain types of To ensure ED solution is physically feasible, steady-state
industries, such as smelting plants, where system loading is security constraints should be applied to the optimization
changed erratically, a smaller time step between consecutive problem:
SLE runs should be used to capture the load variations. ,
,
( ) (5) 1, .. . ,
Whereas in industrial plants with gradual loading variation,
where y is the constrained variable, usually line flow and bus
allows for a use of a larger time step between the SLE runs.
The SLE result defines a complete system operating state
voltage magnitude, and is the number of constrained
variables.
which in turn is used by the ED engine.
In an industrial power system, the network is normally
connected to one or several power grids at a common point
V. INTERCHANGE SCHEDULING
referred to as the point of common coupling (PCC). Under
In a competitive power market, industrial power systems such condition, ED optimization objective needs to be
with onsite generation are allowed to participate to a certain expanded to include the energy cost (power importing per unit
extent in the market operation depending on the regulations in of time) through the PCC boundary into the system:
the regional and national administrations. To bring in the
highest incentive as possible to its system, an industrial power
∑ ∑ ! "
(6)
ೠ
system would schedule a power exchange transaction with the where is the power exchange at the # PCC, ! the per
ೕ
unit energy price at the PCC, and the number of PCC. Note
power grid based on its onsite generation cost and the
that ! can be bilateral, taking a positive value when $ 0
published energy price. The schedule specifies the location(s)
ೕ
of the transaction, type of the transaction (buy or sell), and
cost of the transaction (tariff or rate structure), as well as the (importing- power) and a negative value when % 0 ೕ
ೠ
(7)
(& 1, …, ) (8)
, 0 (9)
, ( 1,…, ,
) (10)
, ( 1,. .. , )
,
(11)
where equation is added to count for the specified schedule at
power exchange lines with the scheduled power exchange
at a total of exchange lines.
Fig. 3. Interchange Scheduling System Data Flow
IEEE PES 2009 PSCE 4
current calculated ACE. Defining the 10-minute moving Control outputs can be distributed to regulating generators
average ACE as 56! , the LFC function will take action
according to the ramping rate, generation margin, and fixed
only when 56! 56!
and both break the threshold and
participation factors respectively.
56! 4 56! $ 0
. The graphical-user interface allows The total adjusting power:
∆ ∆ ∑89:; (16)
system integrators to adjust the threshold to satisfy control
!
∑ "
∆
(17)
Margin Approach:
<;=>?= 89:;
!
∑
!
∆
(18)
prepare a hierarchical list of generators and interchanges in can switch between study cases without resetting the options
each area and/or subsystem. each time.