Figure 495.

Installing the MPT-HC 1+1 on the RF coupler (7-8 GHz)

Figure below shows the final result, and indicates the MAIN and PROTECTION MPT-HC.

Figure 496. MPT-HC 1+1 installed on the RF coupler (6-7-8 GHz)

[7] Install the external Antenna with its own Pole Mounting.
The installation of the antenna and of its own pole mounting, as well as the antenna polarization
check/change, must be done in accordance with the manufacturer’s instructions.

[8] Connect the antenna side (flange) of the MPT-HC Pole Mounting’s nose adapter to the external
antenna, by means of the “Flextwist“ waveguide. (Refer to par. 4.1.6.14).

[9] Ground the MPT-HC system.

[10] Pre-point the antenna.

[11] Reinstall the solar shield onto each MPT-HC transceiver by screwing on it the solar shield screws.

[12] Affix the EMF stickers.

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 689/980
4.1.6.11 How to pull up the cables from indoor to the MPT-HC

Warning: to make sure of the continuity and avoid short circuit, all cables / connectors connections (RJ45,
Coaxial, Ethernet, Optical Fiber.. ) made on the field have to be verified and checked with Cable tester.
The waterproofness must be also checked.

4.1.6.11.1 Optical fiber

1 Take the optical fiber cable of the suitable 2 Take the Hoisting grip tool.
length.

3 Insert the fiber in the hoisting grip tool. 4

5 Screw the gland body to the hoisting grip 6


until the end of stroke with a fixed spanner.

Gland body Gland nut

7 8 Fix the gland nut with the dynamometric


wrench (10N).

9500 MPR Rel. 3.1 User Manual


690/980 3DB18809AAAA Issue 1 Installation
9 Take a cord and insert it in the hoisting grip 10 Make a knot on the cord and pull up with
tool. the cord the hoisting grip tool.

11 The overlength of the optical fiber must be


rolled up in the Cable overlength box.
Fix the Fiber on the pole or the tower with
UV tie raps.

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 691/980
4.1.6.11.2 Electrical Ethernet cable

Warning: to make sure of the continuity and avoid short circuit, all cables / connectors connections (RJ45,
Coaxial, Ethernet, Optical Fiber.. ) made on the field have to be verified and checked with Cable tester.
The waterproofness must be also checked.

N.B. The cable must be terminated on field.

N.B. Install the gland before terminating the cable.

1 Inser the gland on the cable: first insert the 2 Terminate the Ethernet cable with the RJ45
gland nut, then the gland seal, last the gland connector (1AB074610027) according to
body. the plug assembling instructions included
in the relevant tool provided in the Special
tool bag (3CC50098AAAA).

Gland body Gland seal Gland nut

3 Terminate the Ethernet cable acording to EIA/TIA 568B STANDARD

4 Take the terminated electrical cable and 5


protect the RJ45 with a tape.

9500 MPR Rel. 3.1 User Manual


692/980 3DB18809AAAA Issue 1 Installation
6 7 Take a 35 cm reference on the cable.

8 Sign 1.5 cm from the reference. 9 Sign 3 cm from the reference.

10 Remove the sheath of the cable from 1.5 11 Insert the cable in the hoisting grip tool.
cm to 3 cm from the reference.

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 693/980
12 Insert the cable in the hoisting grip tool. 13 Screw the gland body to the hoisting grip
until the end of stroke with a fixed spanner.

Gland body

14 15

Gland nut

16 Fix the gland nut with the dynamometric 17 Take a cord and insert it in the hoisting grip
wrench (10N). tool.

18 Make a knot on the cord and pull up with


the cord the hoisting grip tool.
Fix the cable on the pole or the tower with
UV tie raps.

9500 MPR Rel. 3.1 User Manual


694/980 3DB18809AAAA Issue 1 Installation
4.1.6.12 Cable connection to MPT-HC (11-38 GHz)

4.1.6.12.1 Electrical cable installation

1 Remove the cap on the left side. 2 Take a 35 cm reference on the cable and
put a tape as reference length.

Remove

3 Insert the cable on the hole. 4 Take the gland body, move it on the hole.

Gland
body

5 Fix the gland body until the end of stroke 6 Fix the gland nut by the hand.
and push the seal in its seat.

Gland Seal Gland Reference


nut body

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 695/980
7 Pull back the cable until the reference is 8 Tighten the body and then the gland nut with
visible near the gland nut. the dynamometric wrench (10 N).

9 Remove the tape from the RJ45 connector. 10 Climp the yellow boot on the cable.

Boot

11 Put the boot on the RJ45 connector. 12 Make a loop on the cable.

9500 MPR Rel. 3.1 User Manual


696/980 3DB18809AAAA Issue 1 Installation
13 Position of the cable with loop. 14 Connect the RJ45 connector on the 
MPT-HC connector and close the co-box.
For the connector position refer to par.
4.1.6.2.1.1.

15 End of cable connection.

Warning: The Power Supply connection must be made waterproof :

1) Surround the connector with the auto amalgamate tape from up to down

2) Surround the connector with the adhesive tape from up to down

3) Put tie raps on the up and the down of the connector

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 697/980
4.1.6.12.2 Optical fiber cable installation

1 Insert the SFP on the MPT-HC. 2 Insert the optical fiber on the hole.
For the position refer to par. 4.1.6.2.1.1.

3 Take the gland body and move it on the 4 Fix the gland body. The gland body must
hole. be fixed on the indication present on the
heat shrink tube.

Reference

Gland

Warning: The end of the heat-shrink tube 


reference must be outside the gland.

5 Tighten the gland nut with the dynamometric 6 Remove the protection caps from the fiber
wrench (10 N). connectors.

9500 MPR Rel. 3.1 User Manual


698/980 3DB18809AAAA Issue 1 Installation
7 Take the optical conectors and ... 8 ... connect them on the MPT-HC. Close
the co-box. For the position refer to par.
4.1.6.2.1.1.

9 End of optical fiber connection.

Warning: The Power Supply connection must be made waterproof :

1) Surround the connector with the auto amalgamate tape from up to down

2) Surround the connector with the adhesive tape from up to down

3) Put tie raps on the up and the down of the connector

User Manual 9500 MPR Rel. 3.1


Installation 3DB18809AAAA Issue 1 699/980