Beruflich Dokumente
Kultur Dokumente
5 MAINTENANCE PROCEDURES
5-1 INTRODUCTION................................................................................................................................................. 1
5-2 MAINTENANCE MATRIX.................................................................................................................................. 1
5-3 RAINWATER DRAINAGE SYSTEM................................................................................................................2
5-3-1 COLD WATER STORAGE TANK...................................................................................................2
5-3-2 FLOAT OPERATED LEVER VALVES............................................................................................2
5.1 INTRODUCTION
It should be remembered that remotely controlled systems items of equipment may become
energised without warning. It is therefore imperative to ensure that any such item of equipment is fully
isolated before maintenance work is carried out.
MAINTENANCE / CLEANING . . . . . . . . .
INSTRUCTIONS
ITEM D W 1M 3M 6M 12M 24M 36M NOTES
RAINWATER DRAINAGE SYSTEMS X
COLD WATER STORAGE TANK X X X
FLOAT OPERATED LEVER VALVES X
COLD WATER BOOSTER SET X SEE WILO MANUAL
PAGES 2-6 LOCATED
IN SECTION 7
UN-VENTED ELECTRIC WATER HEATER AS REQUIRED
THERMOSTATIC MIXING VALVE X
GAS / BIOMASS BOILERS X X X SEE BROAG
MANUAL PAGE 20
LOCATED IN
SECTION 7
FLUES X X
PUMPS X X X X
PRESSURISATION UNIT X X X X
AIR HANDLING UNITS X X X X SEE AIR HANDLERS
MANUAL PAGE 13
LOCATED IN
SECTION 7
For more specific maintenance frequencies and maintenance instructions refer to Maintenance
Providers maintenance information.