T-203 Emptying and T-112 Receipt and Delivery Lines.

1. Empty T-203 to slop tanks using AODD pump from sump


suction.
2. The slop tank to be shifted to PH-1 near P-112
Line up for above scenario:
T-203 AODD Slop To be shifted to PH-1

PH-1 P-112 (PDP) To receipt line via 4’(m)/ 2’(f)


connector looping p-112 discharge to DFU 4’ line.
The above will start filling the suction 1 and suction 2. Care to
be taken body valve and low suction v/v to be kept closed.
Venting can be given at goose neck at tank line.
3. Now loop 2’ suction line to T-112 discharge line 2’ filling the
receipt line. Giving vent at PG point(to dismantle PG before
activity).
4. T-203 AODD Slop To be shifted to PH-1
Slop tank 4/2 connector in suction side of AODD (DFU)