Sie sind auf Seite 1von 2

Drilltech D75 Current ALL Halogen Lighting Standard:

www.aps-supply.com

26

26 26
Two lights on
other side of
26 26 26 26 the drill

26 26

Curent Materials:
I.D. FIXTURE QTY
26 Halogen Work Lamp 3x5 24V 70W 10

CURRENT HALOGEN LIGHTING STANDARD


Fixture & Parts MTBF
Model / Beam # Units
Cost [Mean time between Warranty
Effective Lumens Pattern Used failure]
[Excludes Downtime]

Halogen Work 10 Total Effective Lumens: 10,500Lu Install: ~$600 ~400hrs NA


Lamp 3x5 24V Power: 700W *Parts/Yr: ~$1,200
70W Amp: 29.17A Maint/Yr: 5-10x

Total Total Effective Lumens: 10,500Lu Install: ~$600


Lighting Power: 700W *Parts/Yr: ~$1,200
ALL Amp: 29A

BG170613_Drilltech D75
Drilltech D75 Proposed ALL LED Lighting Standard:

www.aps-supply.com

KEY BENEFITS
• 185.7% Increase in effective lumens
• 42.9% Decrease in current draw
• improvement in MTBF
• 4.8% Reduction in total cost of
lighting over 4Yr period

2 2
Two lights on
other side of
2 2 2 2 the drill

2 2

Bill of Materials:
I.D. FIXTURE QTY
2 ABL LED3000 10

PROPOSED ALL LED LIGHTING STANDARD


Model / Fixture & Parts MTBF
Beam # Units
Effective Cost [Mean time between Warranty
Pattern Used failure]
Lumens [Excludes Downtime]

ABL LED3000 10 Total Effective Lumens: 30,000Lu Install: ~$4,000 4+ yrs 4 Yrs
Power: 400W Parts/Yr: N/A
Amp: 16.67A Maint/Yr: N/A

Total Total Effective Lumens: 30,000Lu Install: ~$4,000


Lighting Power: 400W *Parts/Yr: N/A
ALL Amp: 17A

BG170613_Drilltech D75

Das könnte Ihnen auch gefallen