Plans and documents for control and monitoring systems of EGCS, if the
10 ships are provided with the monitoring and control systems for periodically
unattended machinery spaces
Construction of storage tanks for sodium hydroxide solution/liquid
11
containing sodium hydroxide solution and their arrangements
Ventilation systems for compartments installed with equipment for using or
12 handling sodium hydroxide solutions, such as storage tanks, or for the
compartments specified in 3.5.2-3
13 Construction and details for Distance piece
Documents related to any studies and corresponding results explaining
14 cases where bypass pipes are not fitted for EGCS in accordance with
3.4.1-3.(1)
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply, vendor to
provide design input
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Yard supply
Vendor supply
Vendor supply
Yard supply
Yard supply
Yard supply
Vendor supply
Vendor supply
Vendor supply
Vendor supply
Not applicable
Not applicable in this case
Not applicable in this case
Not applicable in this case
Not applicable in this case
Not applicable in this case
Not applicable in this case
Vendor supply
Vendor supply
vendor supply
Vendor supply
Vendor supply
EGCS Installation shipyard engineering drawings list
SN Document desciption Class Customer Remark
1 General
1.1 Feasibility study X
1.2 General arrangement drawing X
1.3 Loading manual and stability information booklet (including damage stability) X
1.4 Navigation bridge visibility verification X If required
1.5 Accuracy check documentation of loading computer X Vendor to prepare?
2 Structure
2.1 Shell expansion drawing X
2.2 Existing sea chest modification or new sea chest drawing X
2.3 Overboard piece X
2.4 Structure drawing for funnel area X
2.5 Structure drawing for engine room area X
2.6 Material list of steel plate X
2.7 Material list of profiles X
3 Outfitting
3.1 Sea water pump foundation X
3.2 Sea water filters foundation X
3.3 Scrubber foundation X
3.4 Platform & handrails for SW pump area X
3.5 Platform & handrails for funnel area X
3.6 Sealing air fans foundations X
3.7 Lifting lugs and beams X
3.8 Scrubber system electrical equipment foundation X
3.9 Fire control plan X
3.10 Escape plan X
3.11 Sea chest modification or New Sea chest drawing X
3.12 Calculation sheet of equipment number X
3.13 Funnel marking plan X
3.14 Material list for outfitting X
3.15 Material list for insulation X
3.16 Material list for coating X
4 Machinery
4.1 Engine Room arrangement X
4.2 Scrubber installation drawing X
4.3 Water monitoring & analyzer installation drawing X
4.4 SW water pump installation drawing X
4.5 Gas analyzer installation drawing X
4.6 Shell side valve hand pump installation drawing X
5 Piping
5.1 Exhaust pipe back pressure calculation report X
5.2 Compressed air piping system or Steam piping system X
5.3 Control air piping system X
5.4 MGPS piping system X
5.5 Fresh water system X If required
5.6 Sea water piping system X
5.7 Exhaust piping system X
5.8 GRE pipe Spool drawings X
5.9 Steel pipe spool drawings X
5.10 GRE pipe support drawings X
5.11 Steel pipe support drawings X
5.12 Pipe arrangement drawing for engine room area X
5.13 Pipe arrangement drawing for funnel area X
5.14 M.E exhuast pipe modifcation drawing X
5.15 A.E. exhaust pipe modifcation drawing X
5.16 Boiler exhaust pipe modification drawing X If required
5.17 Tubing routing layout drawing X
5.18 Material list for GRE pipe & fittings X
EGCS Installation shipyard engineering drawings list
SN Document desciption Class Customer Remark
5.19 Material list for steel pipe and fittings X
5.20 Valve list X
5.21 Instrument list X
5.22 material list for bolt, nuts&gasket X
5.23 Material list for GRE piping support X
5.24 Material list for steel piping support X
5.25 Special item list - expansion joint X
5.26 Special item list - piping identification X
5.27 Material list for collision pipes modification X
5.28 Piping routing layout for collision pipes X
6 Electrical
6.1 Electrical power table X
6.2 Hazardous area plan X
6.3 Calculation of short circuit current X
6.4 electrical equipment layout- engine room X
6.5 electrical equipment layout- funnel area X
6.6 Scrubber system electrical diagram X
6.7 Lighting system diagram X
6.8 Electrical power system diagram X
6.9 Fire detection system X
6.10 Cable tray rounting drawing X
6.11 Lighting installation drawing X
6.12 Fire detector installation drawing X
6.13 Scrubber electrical equipment installation drawing X
6.14 Cable tray and support installation drawing X
6.15 Scrubber system wiring diagram X
6.16 Material list for cable trays X
6.17 Material list for electrical equipment support X
6.18 Cable list X
6.19 Explosive proof equipment list X If required
7 HVAC If required
7.1 Ventilation capacity calculation X
7.2 Ducting instrument diagram X
7.3 Duct arrangement drawing X
7.4 Duct fabrication drawings X
7.5 Duct installation drawings X
7.6 Duct penetration piece drawing X
7.7 Duct support fabrication drawing X
7.8 Duct support installation drawing X
7.9 Seal air fan installation drawing X
7.10 Material list for ducting system X
7.11 Material list for ducting support X