OF TURKMENISTAN
SNT 3.04.04-99
OFFICIAL EDITION
Ashgabat 2000
SNT 3.04.04-99
1. GENERAL PROVISIONS
1.1. The present building regulations and rules are applied to manufacture and
work acceptance on the installations of insulating, finishing, sheeting and
building (construction) floors, except the works, caused by special
operation conditions of buildings and constructions.
1.2. Insulating, finishing, sheeting and floor designs should be performed
according to the project (finishing coverings at absence of project
requirements – according to the standard). Replacement of the materials,
products and structures foreseen by the project is allowed only in
accordance with the design organization and the customer.
1.3. Actions on thermal-insulating manufacture works can begin only after
registration of the act (sanction), signed by the customer, representatives of
the assembly organization and the organization, which are carrying out
thermal-insulating works.
1.4. The installation of each isolation element (roofing), floor, sheeting and
finishing coverings should be performed after check of performance
correctness of the appropriate underlying element with drawing up the
survey act of the latent works.
1.5. At the appropriate verification in accordance with the customer and the
design organization it is allowed to appoint manufacture work ways and
organizational-technological decisions, and also to establish methods, volumes and
registration kinds of quality control, distinguished from foreseen by the present
rules.
AUTHORIZED BY THE DECREE OF NATIONAL THE DATE OF
COMMITTEE OF ARCHITECTURAL-BUILDING INTRODUCTION
CONTROL AT THE CABINET OF MINISTRIES OF INTO EFFECT IS
TURKMENISTAN 10th of July, 2000.
(SEPTEMBER 30, 1999, NO: 10 NK)
Page 2 of 52
SNT 3.04.04-99
1.6. The materials, used for the insulating and roofing covering installation,
should correspond the requirements, foreseen by technical specifications or
other regulatory-technical documentation of branch assignment for these
materials and by the present regulations.
GENERAL REQUIREMENTS
Page 3 of 52
SNT 3.04.04-99
Page 4 of 52
SNT 3.04.04-99
TABLE 2
Page 5 of 52
SNT 3.04.04-99
2.7. Base humidity before applying of a base coat should not exceed the sizes,
specified in Table 3. On the damp bases is allowed to lay only base coats or
insulating structures on a water basis, (for example, bitumen-emulsion
mastic) if the moisture, acting on a base surface, does not break integrity of
a covering film.
2.8. Metal surfaces of pipelines, equipment and the fast, subject to isolation,
should be cleared from rust, and subject to anticorrosive protection –
processed according to the project.
2.9. Isolation of mounted equipment and pipelines should be made after their
constant fastening in design position. Thermal-isolation of the equipment
and pipelines in places, remote for isolation, is necessary to perform
completely before installation, including the over cover installation.
Pipeline isolation, available in crawlways and troughs, is necessary to
perform before their installation in channels.
2.10. The equipment and the pipelines, filled with substances, should be released
from them before the beginning of insulating manufacture works.
2.11. At manufacture of works the rolled insulating materials at negative
temperatures are necessary to warm up during 20 hours to temperature not
less 15°C, to rewind and deliver to a laying place in the warmed container.
2.12. At the isolation installation of roofs from large-sized complex panels with
the roofing membrane put industrially closing up of roof panel joints and
their fining should be made after check of the mounted panels isolation.
Page 6 of 52
SNT 3.04.04-99
The subsequent layers should be laid similarly after mastic cooling of the
bottom layer.
2.19. Temperature-shrinkable seams (joints) in ties and joints between covering
plates are necessary to block by bands of rolled material in width up to 150
mm and to glue from seams (joints) one hand side.
2.20. In abutment places to acting roof surfaces (parapets, pipelines, etc.) the
roofing membrane should be lifted up to tie top, glued on mastic with
Page 7 of 52
SNT 3.04.04-99
TABLE 3
Page 8 of 52
SNT 3.04.04-99
Page 9 of 52
SNT 3.04.04-99
2.31. Works on the warmed combined mastic isolation and roofing installation
are made in the following sequence:
2.32. The basic mastic layers are applied after additional mastic layers drying in
places of abutment; mastic is applied by a continuously equal layer
beginning from most remote sites from places of material submission on a
covering.
2.33. Mastic layer is considered dried up if it does not give after tack at walking
on it and is not washed away by water. Drying speed of mastic depends on
ambient temperature and humidity, layer thickness and its working
consistence.
2.34. Continuous reinforcing layer pads are laid directly on fresh-saturated basic
layer with an overlay on longitudinal and end edges on 5-10 cm.
2.35. Thickness of fresh-applied mastic layer should be within the limits of 4-6
mm for bitumen-emulsion, 3-4 mm for bitumen-polymeric and 2-3 mm for
polymeric mastics. At continuous work reinforcement are conducted by
grips in the width 1.0-1.5 m for laying opportunity of reinforcing fabrics on
mastic surface without damage of fresh-applied layer.
2.36. At the interfacing installation the special attention should be given to
thorough dipping of reinforcing layer pads by bitumen mastic and their
thorough abutment to isolated surface in places of excesses.
2.37. With the purpose of binding increase of mastics with isolated surface is
necessary to humidify the base by water preliminary.
2.38. Ready mastic should be stored under sun blind (shelter) in capacities with a
tight cap. And to watch strictly, that on a mastic surface there should be
water layer.
2.39. Repair of mastic isolation and roofing includes the following processes:
Page 10 of 52
SNT 3.04.04-99
All works, concerned with the isolation and roofing installation from
bitumen-emulsion mastics, should be performed according to requirements
of RSN 17-89 and RSN 39-87 and TDS 439-99.
TABLE 4
Page 11 of 52
SNT 3.04.04-99
2.44. At the cover coat layer from flat or wavy asbestos-cement sheets their
installation and fastening should correspond to the project.
At manufacture of works on the thermal-isolation cover coat layer
installation from rigid and flexible (nonmetallic) materials it is necessary to
provide dense abutment of layers to thermal-isolation with reliable
fastening by fixing products means and thorough condensation of flexible
layers joints with the gluing according to the project.
On pipelines in diameter up to 200 mm fiberglass fabric should be laid
spirally, on pipelines in diameter more than 200 mm – with separate panels
according to requirements of the project.
2.45. Installation of thermal-isolation designs and cover coat layer is necessary to
begin from unloading devices, flanged unions, curvilinear sites (bends) and
shaped parts (T-joints, crosspieces) and to perform in a direction, opposite
to slope, and on vertical surfaces – from below upwards.
2.46. At the thermal-isolation installation from rigid products, laid as dry, there
should be provided the backlash no more than 2 mm between products and
isolated surface.
At gluing the rigid products the temperature of mastics should correspond
the requirements of Table 3. Fastening of products to the base should
correspond to the project.
Page 12 of 52
SNT 3.04.04-99
TABLE 5
Page 13 of 52
SNT 3.04.04-99
TABLE 6
Page 14 of 52
SNT 3.04.04-99
2.51. At the wooden bases (grating, backing) installation under the roofing from
piece materials is necessary to observe the following requirements:
Joints of grating (backing) is necessary to place in disband order;
Distances between grating (backing) elements should correspond to
design;
In places of cornice coverings, valleys and valley gutters, and also
under the roofing from fine piece elements of the base is necessary to
arrange from boards (continuously).
2.52. Piece roofing materials should be laid on grating (backing) by sequence
from cope to ridge on preliminary sectoring. Each overlying line should be
filled on underlying.
2.53. Ordinary structured wavy asbestos-cement sheets and middling wavy are
necessary to lay with displacement on one wave in relation to sheets of the
previous lines or without displacement. Sheets of the strengthened and
unified structures are necessary to lay in relation to sheets of the previous
lines without displacement.
At laying sheets without displacement on a wave in joint places of four
sheets is necessary to make trimming of two average sheets corners with a
backlash between abutting corners of sheets VO 3-4 mm and sheets SV,
UV and VU – 8-10 mm.
2.54. Asbestos-cement sheets VO and SV should be fastened to grating (backing)
by slate nails with zinced nail head, sheets UV and VU – by screws with
special grips, flat sheets – by two nails and anti-wind button, extreme
sheets and ridge details – auxiliary by two anti-wind cramps.
2.55. At the roofing installation from piece materials requirements of Table 4
should be observed.
2.56. The metal waterproofing should be arranged with welding sheets according
to the project. After welding filling of cavities behind isolation should be
injected by structure under pressure 0.2-0.3 MPa.
2.57. At the metal roofing, detail and abutment installation from metal sheets of
any roofing kinds connection of patterns, available along a water drain, it is
necessary to perform by lying creases, except edges, slopes and ridges
where patterns should incorporate by standing creases. At roof slopes less
than 30° the laying crease should be performed by double and be coated
with red lead oxide paste. Pattern bending size for lying crease installation
is necessary to accept as 15 mm; standing creases – 20 mm for one and 35
mm for other, adjacent pattern with it. Pattern fastening to the base is
Page 15 of 52
SNT 3.04.04-99
necessary for carrying out by clips, missed between creases of sheets, and
T-shaped crutches.
REQUIREMENTS TO READY ISOLATION (ROOFING)
COVERINGS AND DESIGN ELEMENTS
TABLE 7
Page 16 of 52
SNT 3.04.04-99
Page 17 of 52
SNT 3.04.04-99
GENERAL PROVISIONS
Page 18 of 52
SNT 3.04.04-99
TABLE 8
Page 19 of 52
SNT 3.04.04-99
Page 20 of 52
SNT 3.04.04-99
minutes
Filler covering after drying — The same
should be equal, without bubbles,
cracks and mechanical damages
Painting and wallpaper materials On the project The same, not less than 3
according to times on a party, book of
standards and manufacture works
specifications
SURFACE PREPARATION
3.7. Finishing and sheeting performance on the bases, having rust, fatty and
bitumen stains, is not allowed. Manufacture of wallpaper works is not
allowed also on the surfaces, which have been not cleared of whitewashing.
3.8. Dedusting of surfaces is necessary to make before applying of each layer
primer, gluing, plaster, painting and protective structures, luting and glass
pastes.
3.9. Base durability should be not less than finishing coating durability and
correspond to design.
3.10. Acting architectural details, interface places with wooden stone, brick and
concrete designs should be plastered the base surfaces on attached to a
metal grid or a braided wire; wooden surfaces – on boards from lathing.
3.11. At coloring and gluing by wallpaper quality of the prepared bases should
meet the following requirements:
Page 21 of 52
SNT 3.04.04-99
3.12. At facing surfaces quality of the prepared bases should correspond the
following requirements:
Walls should have loading not less than 65 % of design at internal
and 80 % at external facing their surface, except walls, which facing
is performed simultaneously with a laying;
Concrete surfaces and surfaces of the brick and stone walls, which
have been laid out with completely filled seams, should have a
hacking;
Wall surfaces, which have been laid out on hollow, is necessary to
prepare without their hacking with filling seams by a solution;
Any surfaces should be cleaned, cleared, washed out before their
facing and humidified up to mat shine before applying of gluing layer
from a solution and other water structures;
Before facing in rooms is necessary to make ceilings and walls
coloring above facing surface. Before wall facing to arrange the
hidden wiring by sheets and panels with topping.
3.13. At facing preparation and other surface kinds at manufacture of painting
and decorating works requirements of Table 9 should be observed.
TABLE 9
Page 22 of 52
SNT 3.04.04-99
Page 23 of 52
SNT 3.04.04-99
PERFORMING OF PLASTERING
AND STUCCO-WORKS
3.14. At wall plastering from a brick at an ambient temperature 23°C and above
the surface should be humidified before applying a solution.
3.15. The improved and high-quality plaster should be performed on leads
(grounds) which thickness should be equal to thickness of a plaster
covering without finishing coat.
3.16. At the single-layered covering installation their surface should be leveled at
once after applying a solution, in case of rubbing (troweling) machine
application – after its fastening.
3.17. At the multi-layered plaster covering installation each layer should be
applied after fastening of previous (finishing coat – after solution
fastening). Leveling of a soil should be performed prior to the beginning of
solution fastening.
3.18. Sheets of gypsum plaster should be glued to a brick wall surface by the
structures, appropriate to design, available as marks, in the size 80 x 80 mm
on the area not less than 10 % along a ceiling, floor, vertical plain corners
through 120-150 mm, in intervals between them on distance no more than
400 mm, along vertical edges – by continuous band. Sheets to the wooden
bases should be fastened by nails with wide nail heads.
3.19. Installation of modeling products from gypsum should be made after
Page 24 of 52
SNT 3.04.04-99
TABLE 10
Page 25 of 52
SNT 3.04.04-99
should have strong binding with the base, not separate at the stretching, on
the tampon should not remain binding tracks. Coloring should be made
after drying of the first coat.
3.25. Painting structures also should be applied by continuous layer. Applying of
each painting structure should begin after full drying of the previous. Flat
paint brushing or trimming of colorful structure is necessary to make on
fresh-applied painting structure.
3.26. At manufacture of painting works requirements of Table 11 should be
observed.
TABLE 11
3.27. At decorative finishing by structures with fillers the base surface should not
be smoothed down; to make filler and grinding of rough surfaces is not
allowed.
3.28. At surface finishing by decorative pastes and terrasite structures each layer
of multi-layered decorative coverings is necessary to perform after
hardening of the previous, without polishing face.
3.29. At the finishing coverings installation from decorative pastes on plaster
instead of finishing coat manufacture of works should be performed with
observance of the rules, presented to the finishing coat installation of
plaster coverings.
3.30. Decorative finishing by terrasite structures should be performed as single-
layered with observance of the requirements, presented to the single-
layered plaster covering installation.
3.31. At surface finishing by a decorative crumb it is necessary to apply on the
Page 26 of 52
SNT 3.04.04-99
damp gluing layer. The laid crumb should have strong (not less than 0.8
MPa) binding with the base and to form continuous, without misses
(passes), covering with dense abutment of crumbs to each other.
Before applying the water-repelling mixture the surface should be cleared
by compressed air.
3.32. At the decorative finishing covering installation requirements of Table 12
should be observed.
TABLE 12
3.33. The glutinous structure at priming of the surface under wallpaper should be
applied by a continuous uniform layer, without misses (passes) and runs,
and maintained prior to the beginning of solidification. The additional layer
of gluing layer should be applied on window and doorway perimeter, on a
contour and in corners of finishing surfaces by a band in width of 75-80
mm at the moment of the basic layer’s solidification starting.
3.34. At gluing the bases by a paper by separate bands or sheets the distance
between them should be 10-12 mm.
3.35. Panel gluing of paper wallpapers is necessary to perform after their
swelling and dipping by glutinous structure.
3.36. Wallpapers in surface density up to 100 g/m 2 is necessary to glue as
overlapping, 100-120 g/m2 and more – end-to-end.
3.37. At panel butting as overlapping the wallpaper gluing is necessary to make
Page 27 of 52
SNT 3.04.04-99
Page 28 of 52
SNT 3.04.04-99
Page 29 of 52
SNT 3.04.04-99
3.61. The false ceiling installation is necessary to make after installation and
fastening of all elements of a frame (fabric), horizontality checks of its
plain and conformity to marks (according to the project).
TABLE 13
Page 30 of 52
SNT 3.04.04-99
Page 31 of 52
SNT 3.04.04-99
stone ± 1.0
marble ± 2.0
grinded, dot, piling, ropiness
“rock” typed stippling ± 0.5
ceramic, glass-ceramic and
other products (internal and
external facing)
3.62. Installation of plates, wall panels and false ceiling elements should be made
after sectoring a surface and to start from a corner of a coated plain. The
horizontal joints of the sheets (panels), which have not foreseen by the
project, are not allowed.
3.63. The surface plain, coated with panels and plates, should be equal, without
sagging in joints, rigid, without panels and sheets vibration and detachment
from a surface (at gluing).
3.64. At installation of false ceilings, panels and plates with topping in building
interiors requirements of Table 14 should be observed.
TABLE 14
3.65. The requirements, presented to ready finishing coverings are given in Table
15.
Page 32 of 52
SNT 3.04.04-99
TABLE 15
Page 33 of 52
SNT 3.04.04-99
Page 34 of 52
SNT 3.04.04-99
shades;
with exact pattern adjustment
on joints.
Offsets of edges should be no more
than 0.5 mm (imperceptible from 3
m distance);
air bubbles, stain, misses (passes),
additional gluing and detachments,
and in places of abutment to slopes
of openings warping, lapping,
wallpaper gluing of plinths, finish
casings, sockets, switches, etc. are
not allowed.
At manufacture of glass works: — The same
after formation on a surface of a
hard film the putty should not have
cracks, lag behind the glass and
crease surface;
putty cut in a place of contact
with glass should be equal and
parallel to the crease edge, without
acting fixing devices;
external facets of glazing beads
densely should adjoin to an
external side of creases, not
running out their limits and not
forming hollows;
glazing beads, established on
glass putty, should be strongly
connected among themselves and
with binding crease; on rubber
gasket seals – gasket seals should
be densely jammed by glass and
densely adjoin to the crease, glass
and glazing bead surface, not run
out above the glazing bead side,
not have cracks and breaks;
rubber structures at application
of any fixing devices should be
dense close to glass and crease
groove, fixing devices should
correspond to design and dense
reserved in crease grooves.
Glass-blocks, established on a +10 on all Technical checkup, the act of
solution, should have the equal, height acceptance
Page 35 of 52
SNT 3.04.04-99
Page 36 of 52
SNT 3.04.04-99
4. FLOOR INSTALLATION
GENERAL REQUIREMENTS
4.1. According to the project, prior to the work beginning on the floor
installation should be executed the actions for stabilization, prevention of
heaving (blowup) and artificial soil fastening, downturn of subsoil waters,
and also abutment to deformation seams, channels, areaways, drain
conduits, traps, etc. Bordering elements of a covering is necessary to
execute up to its installation.
4.2. The soil base under floors should be condensed according to SNiP 3.02.01-
87 “Earth Structures, the Bases and the Basements”. The soil, mud
(sludge), turfs, and also made ground with an admixture of building
Page 37 of 52
SNT 3.04.04-99
Page 38 of 52
SNT 3.04.04-99
TABLE 16
Page 39 of 52
SNT 3.04.04-99
TABLE 17
4.18. The loose soundproof material (sand, coal slag, etc.) should be without
organic admixtures. To apply charges from pulverized materials is
forbidden.
4.19. Gasket seals should be laid without gluing to floor slabs, and plates, mats –
dry or with gluing on bitumen mastics. Soundproof gasket seals under logs
should be laid on all extent of a log without breaks. Band gasket seals
under modular ties in the size “on a room” should be continuous on a room
perimeter closely to walls and partitions, under joints of adjacent plates,
and also inside perimeter – in parallel to the greater side of a plate.
Page 40 of 52
SNT 3.04.04-99
TABLE 18
WATERPROOFING INSTALLATION
4.21. The glued over waterproofing with application of bitumen, pitch (tar) and
mastics on their base should be performed according to Chapter 2, and
polymeric waterproofing – according to SNiP 3.04.03-85.
4.22. The waterproofing from broken (crushed) stone with bitumen saturation
should be made according to SNiP 3.06.03-85.
4.23. The surface of a bitumen waterproofing before laying on its coverings,
layers or ties, which structure includes cement or liquid glass, is necessary
to cover with hot or cold bitumen mastic with burry in it of dry large-
grained sand with parameter observance of Table 19.
TABLE 19
Page 41 of 52
SNT 3.04.04-99
manufacture works
Thickness of a bitumen + 0.5°C The same, not less than 3
mastic layer – 1.0 mm measurements on every 50-70 m2
of a waterproofing surface, the act
of survey of the latent works
Temperature of cold The same
bitumen-emulsion mastics:
at preparation 50-70°C
at applying 10-40°C
layer thickness 4-6 mm
4.24. Monolithic mosaic coverings and coverings with the strengthened surface
layer, arranged on concrete spreading layers should be performed
simultaneously with the last burry way in fresh-laid vacuum-treated,
concrete mixture of decorative, strengthening and other loose materials.
4.25. At the monolithic covering installation requirements of Table 20 should be
observed.
TABLE 20
Page 42 of 52
SNT 3.04.04-99
Page 43 of 52
SNT 3.04.04-99
TABLE 21
4.28. Logs under coverings should be laid across a direction of light from
windows, and in rooms with the certain direction of people movement (for
example, in corridors) –perpendicular to movement. Logs should be joined
among themselves closely by end faces in any place of a room with joint
displacement in adjacent logs not less than on 0.5 m. Between logs and
walls (partitions) it is necessary to leave a backlash in width 20-30 mm.
4.29. In floors on overlappings (blockings) the log surface should be leveled by a
sand layer with its padding under soundproof gasket seals or logs on all
their width or length. Logs should touch with all bottom surface to a
soundproof layer, floor slabs or a sandy leveling layer, without backlashes.
Padding of wooden wedges (slips) or linings under logs for their alignment
or log abutment on wooden linings is forbidden.
4.30. Under logs, available on columns in floors on a soil, should be placed
wooden gasket seals on two layers, which edges should be let out from
under gasket seals on 30-40 mm and to fix to them nails. Log joints should
Page 44 of 52
SNT 3.04.04-99
4.38. Linoleum, carpets, rolled materials and polyvinyl chloride plates before
gluing should be baked up to disappearance of waves and completely
adjoin to the base, they should be glued to a underlying layer on all area,
except cases, foreseen in the project.
4.39. Abutting panel cutting of rolled materials is necessary to make not earlier
than 3 days after the basic panel gluing. Edges of abutting panels of
linoleum should be sealed after cutting or stuck together.
4.40. In zones of people intensive movement the cross seam installation
Page 45 of 52
SNT 3.04.04-99
TABLE 22
Page 46 of 52
SNT 3.04.04-99
TABLE 23
Page 47 of 52
SNT 3.04.04-99
TABLE 24
Page 48 of 52
SNT 3.04.04-99
TABLE 25
Page 49 of 52
SNT 3.04.04-99
Page 50 of 52
SNT 3.04.04-99
TABLE OF CONTENT
1. GENERAL PROVISIONS...........................................................................2
2. INSULATING COVERING AND ROOFING.......................................3
GENERAL REQUIREMENTS.............................................................................3
BASE PREPARATION AND UNDERLYING......................................................5
ELEMENTS OF ISOLATION...............................................................................5
INSTALLATION OF ISOLATION AND ROOFINGS.........................................6
FROM ROLLED MATERIALS............................................................................6
INSTALLATION OF ISOLATION AND ROOFINGS.........................................9
FROM BITUMEN-EMULSION, BITUMEN-POLYMERIC................................9
AND POLYMERIC MASTICS.............................................................................9
INSTALLATION OF ISOLATION FROM CEMENT SOLUTIONS,................11
HOT ASPHALT MIXTURES, BITUMEN-PERLITE.........................................11
AND BITUMEN-HAYDITE...............................................................................11
MANUFACTURE OF THERMAL-ISOLATION WORKS................................12
WITH APPLICATION OF SOFT, RIGID AND..................................................12
SEMIRIGID FIBROUS PRODUCTS AND THE...............................................12
INSTALLATION OF THERMAL-ISOLATION COVER COAT LAYER..........12
FROM RIGID MATERIALS...............................................................................12
PLATES AND LOOSE MATERIALS.................................................................13
INSTALLATION OF ROOFING FROM PIECE MATERIALS.........................15
ISOLATION AND ROOFING DETAILS...........................................................15
FROM METAL SHEETS....................................................................................15
REQUIREMENTS TO READY ISOLATION (ROOFING)...............................16
COVERINGS AND DESIGN ELEMENTS........................................................16
3. PAINTING-DECORATING WORKS AND BUILDING DESIGNS
AND PROCESS EQUIPMENTS PROTECTION FROM
CORROSION (ANTICORROSIVE WORKS).........................................18
GENERAL PROVISIONS..................................................................................18
SURFACE PREPARATION................................................................................21
PERFORMING OF PLASTERING....................................................................24
AND STUCCO-WORKS....................................................................................24
PERFORMING OF PAINTING WORKS...........................................................25
PERFORMING OF DECORATIVE FINISHING WORKS................................26
PERFORMING OF WALLPAPER WORKS.......................................................27
PERFORMING OF GLASS WORKS.................................................................28
PERFORMING OF FACING WORKS...............................................................29
INSTALLATION OF FALSE CEILINGS, PANELS...........................................30
AND PLATES WITH TOPPING IN BUILDING INTERIORS..........................30
REQUIREMENTS TO READY FINISHING COVERINGS..............................32
4. FLOOR INSTALLATION..........................................................................37
GENERAL REQUIREMENTS...........................................................................37
PREPARATION OF UNDERLYING FLOOR ELEMENTS...............................39
INSTALLATION OF CONCRETE SPREADING..............................................39
LAYERS AND TIES...........................................................................................39
Page 51 of 52
SNT 3.04.04-99
Page 52 of 52