Zach Bowling
August 4, 2015
2
First Month (May 18th - June 18th)
3
First Month (May 18th - June 18th)
4
First Month (May 18th - June 18th)
• Analyzed individual part drawings to update build sheets and control chart with the
most recent and accurate specifications and tolerances
5
2nd Month (June 18th-July 18th)
6
2nd Month (June 18th-July 18th)
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
7
2nd Month (June 18th-July 18th)
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
8
2nd Month (June 18th-July 18th)
Six Sigma
Project
Improvements
Results: Height Gauge Measurements Improvement
1) Height gauge
measurements
2) Pre-build
measurement
process
Average time saved per pump built ≈ 3.43 minutes
3) Swashplate
thickness
measurements
9
3rd Month (July 19th- Today)
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
10
3rd Month (July 19th- Today)
Current Process
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
11
3rd Month (July 19th- Today)
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
12
3rd Month (July 19th- Today)
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
13
3rd Month (July 19th- Today)
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness Average time saved per measured piston / cylinder set ≈ 1.94 minutes
measurements Average time saved by eliminating copy/paste method ≈ 7.62 minutes
Current Process
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
15
3rd Month (July 19th- Today)
Potential Solution
Six Sigma
Project
Improvements
1) Height gauge
measurements
2) Pre-build
measurement
process
3) Swashplate
thickness
measurements
16
What Did I Do For The Company?
Recap:
• Helped assemble and measure compressors for testing
• Labeled and organized part storage area
• Organized proto room & tear down room
• Updated / verified control chart and build sheet specifications
• Miscellaneous intern work including gauge R & R
• Six Sigma Project
17
What Did The Company Do For Me?
• Experience
• Knowledge
• Great Co-Workers
18