Sie sind auf Seite 1von 56

NICOLÁS

OLIVARES TAPIA ARCHITECT


PASSPORT N. P19484427 08.02.1990
SINGLE CHILEAN
NICO.OLIVAREST@GMAIL.COM
+56941436841

PROFILE ENGINEERING COMPANY). Management of


BIM Architect, graduated from architecture’s construction processes using BIM methodolo-
school at Universidad de Talca, Chile (2014). gy, implementation of BIM system on construc-
Skills on teamwork, elaboration and develop- tion phase. Responsible for the compliance
ment of models with BIM methodology (BIM and updating of the BIM Execution Plan on
modeler), knowledge on project’s BIM coordi- Construction phase. From June 2020 to
nation (BIM coordinator). Spanish (motherton- June 2021.
gue), English and italian speaker. - BIM COORDINATOR ON CONSTRUCTION
INTERNATIONAL EXPERIENCE SITE at DIFAI, RAÍCES RESIDENTIAL BUIL-
Student exchange in Facoltà di architettura DING in TALCA, CHILE. BIM on construction
dell’università degli studi Roma Tre, Rome, Italy. site consultant in charge of inspecting the
2012-2013. real achieve of BIM’s methodology objecti-
ACADEMIC EXPERIENCE ves. Controling work progress through
- ASSISTANT at UNIVERSIDAD DE TALCA, in weekly updates of models and reports
the class of Taller de Tecnología 4, 4th level, in preparation. Responsible for Information’s
charge of the architect Jorge Christie. 1st requirements updates, working directly
bimester 2012 (March-May). with technical office. From July 2021 to
- PROFESSIONAL INTERNSHIP at architectu- July 2022.
re’s office URBASIX, in charge of the architect
Alvaro Rojas Vio. Talca. 2013 (April-May). LANGUAGES
- DIPLOMA BUILDING: Mirador en la casa del English: ADVANCED LEVEL
arbol, villa los maquis, Talca, Chile. 2014. Italian: UNIVERSITÀ ROMA TRE - A1
miradorenlacasadelarbol.blogspot.com German: UNIVERSIDAD DE TALCA - A1

JOB EXPERIENCE COURSES


- ASSISTANT of the ARCHITECT ALVARO - HERRAMIENTAS DE INSPECCIÓN TÉCNICA
ROJAS VIO. Development of technical drawing, DE OBRAS PARA LA CONSTRUCCIÓN, curso
design proposals, project’s modeling and deve- ITO (Tools for technical inspection on building
lopment with BIM methodology, regulatory works, ITO course). Executed by Asgem limita-
procedures. May 2013 - September 2015. da, sence code number 12.37.9270.97. Talca,
- JUNIOR ARCHITECT at SPREAAD ARCHI- July 2015.
TECTS. Collaborator in project’s design and - DIPLOMADO BIM AVANZADO PARA PRO-
plans development, in charge of BIM models YECTOS DE EDIFICACIÓN (Bachelor degree in
and visualization images of WOM’s callcenter in advanced BIM for building project). Pontificia
Talca, Chile. October 2015. Universidad Católica de Chile, Santiago, Chile.
- BIM ARCHITECT at NUDO INGENIEROS CAL- April-August 2016.
CULISTAS. Regulatory procedures, assistant in
design and development of projects. BIM SOFTWARES
- AUTOCAD - ILLUSTRATOR - INDESIGN
modeler of architecture, structure and MEP
- REVIT - PHOTOSHOP - NAVISWORKS
specialities. Knowledge on project’s BIM coordi-
nation (BIM coordinator), detection and pro- Correspondence in the German education
duction of interference reports. November system (made by Zentralstelle für ausländis-
2015 - July 2018. ches Bildungswesen):
- BIM MANAGER at CONCESIONARIA CHEC The foreign degree corresponds to a German
EMBALSE LAS PALMAS. (CHINA HARBOUR university degree at master level.
PORTFOLIO
This portfolio contains the most impor-
tant projects I have worked and collabo-
rated on, since the realization of my
diploma building on 2014, to the present
day.
2
MIRADOR EN LA
CASA DEL
ÁRBOL
(TREE HOUSE LOOKOUT)
DIPLOMA BUILDING
Talca, Chile. 2014.
3
Claro river is the natural western bound of
NATURAL Talca, a city located at middle south of Chile.
AREA There is another bigger visual bound, which is
CLARO the Cordillera de la Costa, in this case known
RIVER as Cerro de la Virgen. This bound could be
seen from any point of the city. However, the
city almost never reaches the river bank,
because that is a flood area. Therefore, those
lands are occuppied as crops areas, whose-
have become a boundary between the natural
and artificial area.

CROPS
AREA

REGINA PACIS
RETREAT HOUSE
Villa los maquis faces the end, edge or bound
of the city in a very violent way. In this place is
located the Regina Pacis retreat house, crea-
ting a barrier between urban and rural areas
that takes almost the 60% of the western side
stand along of the villa. This is how the Villa is
forced to end, facing a long wall, which has
become the end of the city. There is an area
where the Villa reaches the crops area, but
this one will disappear. In the incoming years
there will be a road across that area.

196 HOUSEHOLDS
VILLA
LOS MAQUIS

ARTIFICIAL
784 INHABITANTS AREA
4
NEIGHBORHOOD
VILLA LOS MAQUIS

CROPS
AREA
REGINA PACIS 2 5.- PLAYGROUND
RETREAT HOUSE (OUTSIDE OF THE
NEIGHBORHOOD)

3
1 5

SCHORR Y CONCHA
PAPER FACTORY

1.- VILLA LOS MAQUIS SQUARE


2.- MIRADOR-PARASOL SQUARE
3.- MULTIPURPOSE COURT
4.- EXERCISE MACHINES
5
CROPS
AREA
FUTURE
ROAD

REGINA PACIS
RETREAT HOUSE

PLACE GIVEN BY
NEIGHBORHOOD

6
PLACE´S
IMAGES
GIVEN BY NEIGHBORHOOD

7
MATERIAL
EXPLORATION

40 cms

40 cms

40 cms

40 cms

2”x2” WOOD STICKS

HOW TO GET A
VOLUME BY
REPEATING
ELEMENTS? 8
PROJECT
SYNTHESIS

TREE PATH

viewpoint

tree shelter

PATH ADJUSTMENT VOLUMETRY

VOLUMETRY ADJUSTMENT LIFT UP

access
MATERIALS + STRUCTURE
9
227
270.4

400.9

294.4

890.1

1350.8
1070.9

935.4

767.6
847.6
1611.8

1322.8

1151.5

981.7

707.6
1.200
SITE PLAN

10
GROUND
FLOOR
1.75

C
90
0
B 10

0
27
80

A
70
1 0.00
90
10
0
2
40
50

3 250
40
40

37

°
20

pa 12
19

0
0

1 Ram
J
625.5

2 H
4 I
52.7
K
3 L

4
5 40

319.
40

10.5 101
50

29.5

7 7
87
64.5

6
40

7
40
37
0

101

7
8
187.2
19
5.2
90
100

9
325

232
25

13
5° 40
330

50
270
80
70

10

8
90
100

100
90

11

9
40
70
80
270

40 50
40

270
E 10
F
280

G 450
100
90

40

40 50
10.5
29.5
64.5

11
H
I
K
L
J

11
FIRST FLOOR
1.75

C
.5
12
40
12
.5

B 40
7.5
40

22
40

A 40
1
40

40
22

15
2
7.5
40

3 250
40

40

40

40

1
J
40

625.5
67
4

2 H
4 I
40

K
3 L
5

319.4
40
50
8.8

7
6
40

44
6.5
40

7
101
40

8
187.
2
40
12.5

177.
5
40
40

9
325
40
40

21
.3
5
187.

40
13 40

40

40 297.
5
10 240
40

40
15

2.90 8
15

12.5

11
40

12.5
40
40 9
40

40
5

40
187.

40
40

40
40
40

E 40
10
40

667.
F 5 40

G
40
40
15

40
40
40
40
15
11
H
I
K
L
J

12
MAIN
SECTIONS
1.50

145
240

°
72

72
°

95
240

°
72
72
°

13
MAIN DETAILS STEEL CONNECTIONS, 1.20

2”x2” WOOD STICKS CONNECTIONS, 1.10

ACCESS DETAIL, 1.20

14
FINISHED
PROJECT

15
16
17
CASA
HEXÁGONO
(HEXAGON HOUSE)
UNBUILT, 80.9 m2.

Developed as assistant with


architect Alvaro Rojas Vio.
Second house project located at the beach.
Pupuya, Chile. 2014.
18
GROUND
A B C D E F G H IFLOOR
100 100 225 50 90 74 267 131

100 845 95
1.100
100 280 80 10 64 10 110 15 142 12 30 102

15 203 15 38 10 80 10 64 10 267 10 119 15


1
B C
63

8
98

2 186
76

76

129
16
10

15 14

184
469 13

177
164
12 11
10
128

104
118

1
108

108

94
12 30
61 142 103
9

50
3 64
3
A A'

13
200 119
8

98
2
96

96
255 257 7

4 4
160
50 60 147
415

202

172

172
198
198
6
80

192
227
6
5
67

67
67
280

280

280
296

5 686
4
5
3

13
67
76
87
91

2
160

108
712
17

17

14
111
15

6 B' C'
16 686 10 119 15

16 111 719

100 845 95

100 100 225 50 90 64 277 131

A B C D E F G H I

FIRST FLOOR
1.100
A B C D E F G H I
100 100 225 50 90 74 267 131

375 722

375 112 80 10 64 10 110 15 142 12 30 102 95

17 190 15 205 10 130 10 64 10 267 10 119 15


1
B C
55

78
14
98

2
72

686
278 16
169

169

15
178

14
171

190

13 12 11
85 10
128

104

V8
H65
93

1
104
101

94

F
9

3 64
3
9

A A'
13
15

119 8
405
98

2
96

96

257 7
150

4 50 60 147 4
211

211

211

202
228

172

172
157
187

6
192

94 311
50 80
227

6
5
67

67
67
282

5 896
4
5
15

3
13
67
76
87
9

2
94
160

1
114
114
102

78
93

15

6 B' C'
17 191 700 10 119 15

206 846 95

206 889

100 100 225 50 90 64 277 131

A B C D E F G H I
19
NORTH ELEVATION ELEVATIONS
I H G F E D C B A 1.100

NNT
-0.90

WEST & EAST ELEVATIONS


2 3 4 4 3 2

NNT NNT
-0.90 -0.90

SOUTH ELEVATION
A B C D E F G H I

NNT
-0.90

20
SECTIONS
1.100

SECTION A-A

A B C D E F G H I
284

76
130

186
168

104
NPT

50
+2.38
630

220

NPT
±000

NNT
53

-0.90

SECTION B-B SECTION C-C

4 3 2 4 3 2
247

217

NPT NPT
+2.38 +2.38
630

630
439

439
220

220

NPT NPT
±000 ±000

NNT NNT
-0.90 -0.90

21
PLANTEL
PORCINO 10 MIL
MADRES SAN
AGUSTIN DEL
ARBOLITO
COEXCA
(10 THOUSAND PIG FARM SAN AGUSTIN DEL
ARBOLITO COEXCA)
BIM COORDINATION, 33045.59 m2.

Worked as BIM modeler, and as part of the


BIM coordination of specialties team at
Nudos Ingenieros Calculistas.
San Javier, Chile. 2016.
22
ENTIRE
COMPLEX

23
MAIN SHIP BIM
COORDINATION

ELECTRICAL NET & ILUMINATION

GAS PIPING

SANITARY PIPING

24
ADDITIONAL EQUIPMENT

STRUCTURE

ARCHITECTURE FINISHES

COMPLETE MODEL

25
INTERIOR
IMAGES

26
FINISHED MAIN
SHIP

27
CESFAM
LORENZO
ARENAS
(FAMILY HEALTH CENTER
LORENZO ARENAS)
BIM COORDINATION, 2841 m2.

Worked as BIM modeler, and as part of the


BIM coordination of specialties team at
Nudos Ingenieros Calculistas.
Concepción, Chile. 2016.

28
BIM
COORDINATION
CLIMATE CONDUITS, GAS & CLINICAL GASES
PIPING

ELECTRICAL NET & ILUMINATION

SANITARY PIPING

29
STRUCTURE

ARCHITECTURE FINISHES

COMPLETE MODEL

30
INTERIOR
IMAGES

31
AMPLIACIÓN
SUR MALL
PLAZA MAULE
(MALL PLAZA MAULE
SOUTH ENLARGEMENT)
BIM COORDINATION, 6370 m2.

Worked as BIM modeler, and as part of the


BIM coordination of specialties team at
Nudos Ingenieros Calculistas.
Talca, Chile. 2016.
32
BIM
COORDINATION
CLIMATE CONDUITS

FIRE SAFETY

ELECTRICAL NET

33
ILUMINATION

SANITARY PIPING

STRUCTURE

34
ARCHITECTURE FINISHES

COMPLETE MODEL

35
INTERIOR
IMAGES

36
AMPLIACIÓN
PRODUCTOS
FERNÁNDEZ
(PF2)
(PRODUCTOS FERNANDEZ SAUSAGES
FACTORY ENLARGEMENT)
BIM COORDINATION AND ARCHITECTURE
PROJECT DEVELOPMENT, 4773.42 m2.
2019

Worked as BIM modeler, as part of the BIM


coordination of specialties team and as
co-architect at Nudos Ingenieros Calculistas.
Talca, Chile. 2017-2018.
37
LAYOUT
1.1000

38
GROUND
FLOOR
1.750

39
FIRST FLOOR
1.750

40
DETAILS
1.100

41
BIM
COORDINATION
CLIMATE CONDUITS

REFRIGERATION PIPING

ELECTRICAL NET & ILUMINATION

42
SANITARY PIPING

FIRE SAFETY

STRUCTURE

43
ARCHITECTURE FINISHES

COMPLETE MODEL

44
INTERIOR
IMAGES

45
CAMPO
DEPORTIVO
PRODUCTOS
FERNANDEZ
(PRODUCTOS FERNANDEZ SPORTS FIELD)
DRESSING ROOM & BLEACHERS
ARCHITECTURE PROJECT DEVELOPMENT,
638.46 m2.
2019

Co-architect at Nudos Ingenieros Calculistas.


Talca, Chile. 2017-2018.
46
LAYOUT
1.2000

47
FIRST FLOOR
1.150
DRESSING ROOM

48
SECTIONS
1.150
SECTION A-A

SECTION B-B

SECTION C-C

SECTION D-D

49
GROUND
FLOOR
BLEACHERS 1.150

50
SECTION A-A SECTIONS
1.100

SECTION B-B

51
MODEL VIEWS

52
EMBALSE
LAS PALMAS
CHEC
(LAS PALMAS CHEC DAM)
BIM MANAGER ON CONSTRUCTION PHASE
UNDER CONSTRUCTION.
In charge of BIM system at
Concession Company CHEC Embalse Las Palmas S.A
Petorca, Chile 2020 to the present. 53
54
MODEL VIEWS

55
PORTFOLIO NICOLÁS TAPIA OLIVARES
56

Das könnte Ihnen auch gefallen