1.1) Line 2 to 3
1.2) Line 3 to 4
1.3) Line 4 to 1
1.4) Line 1 to 2
2) Bearing Error
3.1.1) 𝐷𝑒𝑓𝑖𝑛𝑖𝑡𝑒 𝐵𝑒𝑎𝑟𝑖𝑛𝑔 2 𝑡𝑜 3 = 194° 05′ 27" + 4" = 194° 05′ 31"
3.1.2) 𝐷𝑒𝑓𝑖𝑛𝑖𝑡𝑒 𝐵𝑒𝑎𝑟𝑖𝑛𝑔 3 𝑡𝑜 4 = 284° 42′ 55" + 8" = 284° 43′ 03"
3.1.3) 𝐷𝑒𝑓𝑖𝑛𝑖𝑡𝑒 𝐵𝑒𝑎𝑟𝑖𝑛𝑔 4 𝑡𝑜 1 = 22° 37′ 57" + 12" = 22° 37′ 57"
40.4782 + 40.4837
3.2.1) 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 1 𝑡𝑜 2 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = = 40.481 𝑚
2
43.8039 + 43.8068
3.2.2) 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 2 𝑡𝑜 3 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = = 43.805 𝑚
2
46.8568 + 46.8579
3.2.3) 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 3 𝑡𝑜 4 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = = 46.857 𝑚
2
42.9995 + 42.9986
3.2.4) 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 4 𝑡𝑜 3 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = = 42.999
2
4) Traverse Pricision (Ratio of Linear Misclosure) Calculation
1
Traverse Pricision =
Linear Misclosure
( )
Total Distance
1
=
√𝛥 𝐿𝑎𝑡𝑖𝑡𝑢𝑑𝑒2 + 𝛥 𝐷𝑒𝑝𝑎𝑟𝑡𝑢𝑟𝑒2
( )
𝑇𝑎𝑡𝑎𝑙 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒
1
= = 42235.63882
√−0.0012 +0.0042
( )
174.142
Latit Dipat
Coordinate Equation
7.1.iii.a) Double Meridian Distance and Double Parallel Distance Calculation Table
7.1.iii.b) Double Meridian Distance × Latitude and Double Parallel Distance × Departure
Calculation Table
3768.530 + 3768.599
=
2
= 3768.565 m2
2 × Area Average
Area =
2
3768.565
=
2
= 1884.283 m2
7.2.i ) Transit Rule Adjustment Method
Coordinate Equation
7.1.iii.a) Double Meridian Distance and Double Parallel Distance Calculation Table
7.2.iii.b) Double Meridian Distance × Latitude and Double Parallel Distance × Departure
Calculation Table
3768.560 + 3768.560
=
2
= 3768.560 m2
2 × Area Average
Area =
2
3768.560
=
2
= 1884.280 m2
= 35720.20698
= 31951.64645
𝛴(𝑦×𝑥) − 𝛴(𝑥×𝑦)
Area =
2
35720.20698 − 31951.64645
= = 1184.280266 m2