CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
01 OBRAS GENERALES 0.00 0.00 0.00 0.00 0.00 0.00
01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01 CARTEL DE OBRA (INC. INSTALACION) GLB 1,800.00 S/. 1,800.00 (100%) 0.00 0.00 0.00 0.00
01.01.02 TRANSPORTE Y ELIMINACIÓN DE MATERIAL EXCAVADO GLB 7,500.00 S/. 7,500.00 (100%) 0.00 0.00 0.00 0.00
01.01.03 LIMPIEZA DE TERRENO MANUAL m2 756.47 S/. 756.47 (100%) 0.00 0.00 0.00 0.00
01.01.04 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 779.82 S/. 779.82 (100%) 0.00 0.00 0.00 0.00
01.02 ENSAYOS DE LABORATORIO 0.00 0.00 0.00 0.00 0.00 0.00
01.02.01 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO) GLB 1,500.00 0.00 S/. 1,500.00 (100%) 0.00 0.00 0.00
01.02.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) GLB 3,000.00 S/. 3,000.00 (100%) 0.00 0.00 0.00 0.00
01.02.03 DISEÑO DE MEZCLA f'c=210kg/cm2, 175kg/cm2 y 140kg/cm2 GLB 1,050.00 S/. 1,050.00 (100%) 0.00 0.00 0.00 0.00
01.03 EQUIPOS DE SEGURIDAD DE OBRA 0.00 0.00 0.00 0.00 0.00 0.00
01.03.01 EQUIPOS DE SEGURIDAD DE OBRA und 17,600.00 S/. 17,600.00 (100%) 0.00 0.00 0.00 0.00
01.04 FLETE TERRESTRE 0.00 0.00 0.00 0.00 0.00 0.00
01.04.01 FLETE TERRESTRE A OBRA GLB 120,000.01 S/. 18,868.42 (15.72%) S/. 18,947.37 (15.79%) S/. 19,578.95 (16.32%) S/. 19,578.95 (16.32%) S/. 18,947.37 (15.79%)
02 AMBIENTE PUESTO DE SALUD 0.00 0.00 0.00 0.00 0.00 0.00
02.01 ESTRUCTURAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 604.67 S/. 604.67 (100%) 0.00 0.00 0.00 0.00
02.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 620.31 S/. 620.31 (100%) 0.00 0.00 0.00 0.00
02.01.01.03 ALMACEN, OFICINAS Y GUARDIANIA mes 6,267.85 S/. 6,267.85 (100%) 0.00 0.00 0.00 0.00
02.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.01 EXCAVACION MASIVA PARA PLATAFORMA m3 3,968.47 S/. 3,968.47 (100%) 0.00 0.00 0.00 0.00
02.01.02.02 EXCAV. PARA CIMIENTOS HASTA 1.00 MT. TERRENO NORMAL m3 2,666.75 S/. 2,666.75 (100%) 0.00 0.00 0.00 0.00
02.01.02.03 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 3,269.86 S/. 3,269.86 (100%) 0.00 0.00 0.00 0.00
02.01.02.04 EXCAV. MANUAL DE ZANJA P/SARDINELES DE VEREDAS m3 373.68 S/. 373.68 (100%) 0.00 0.00 0.00 0.00
02.01.02.05 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO m3 407.17 S/. 407.17 (100%) 0.00 0.00 0.00 0.00
02.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 566.02 S/. 566.02 (100%) 0.00 0.00 0.00 0.00
02.01.02.07 NIVELACION INTERIOR Y APISONADO MANUAL m2 980.66 S/. 980.66 (100%) 0.00 0.00 0.00 0.00
02.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1,274.58 S/. 1,274.58 (100%) 0.00 0.00 0.00 0.00
02.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 8,579.94 S/. 8,579.94 (100%) 0.00 0.00 0.00 0.00
02.01.03.03 CONCRETO EN SOBRECIMIENTO DE 1:8 + 30% PM m3 7,199.32 S/. 7,199.32 (100%) 0.00 0.00 0.00 0.00
02.01.03.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 MT m2 8,447.64 S/. 8,447.64 (100%) 0.00 0.00 0.00 0.00
02.01.03.05 FALSO PISO DE 4" DE CONCRETO 1:10 m2 2,927.29 S/. 2,927.29 (100%) 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
02.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.01 ZAPATA 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.01.01 ACERO PARA ZAPATAS GRADO 60 kg 1,600.67 S/. 1,600.67 (100%) 0.00 0.00 0.00 0.00
02.01.04.01.02 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 8,435.00 S/. 8,435.00 (100%) 0.00 0.00 0.00 0.00
02.01.04.02 COLUMNAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.02.01 ACERO FY= 4200 KG/CM2 PARA COLUMNAS kg 13,968.08 S/. 13,968.08 (100%) 0.00 0.00 0.00 0.00
02.01.04.02.02 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 10,116.91 S/. 10,116.91 (100%) 0.00 0.00 0.00 0.00
02.01.04.02.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 13,630.30 S/. 13,119.16 (96.25%) S/. 511.14 (3.75%) 0.00 0.00 0.00
02.01.04.03 VIGAS DE CIMENTACION 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.03.01 ACERO EN VIGA DE CIMENTACION GRADO 60, kg 25,535.73 S/. 25,535.73 (100%) 0.00 0.00 0.00 0.00
02.01.04.03.02 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 5,367.44 S/. 5,367.44 (100%) 0.00 0.00 0.00 0.00
02.01.04.03.03 ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION m2 4,722.25 S/. 4,722.25 (100%) 0.00 0.00 0.00 0.00
02.01.04.04 VIGAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.04.01 ACERO GRADO 60 EN VIGAS kg 47,171.69 S/. 47,171.69 (100%) 0.00 0.00 0.00 0.00
02.01.04.04.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 8,071.02 S/. 8,071.02 (100%) 0.00 0.00 0.00 0.00
02.01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 8,314.03 S/. 8,314.03 (100%) 0.00 0.00 0.00 0.00
02.01.04.05 TIJERAL DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.05.01 ACERO GRADO 60 EN TIJERAL kg 9,278.94 S/. 9,278.94 (100%) 0.00 0.00 0.00 0.00
02.01.04.05.02 CONCRETO F'C= 210 KG/CM2. EN TIJERAL m3 4,959.91 S/. 4,959.91 (100%) 0.00 0.00 0.00 0.00
02.01.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN TIJERAL m2 2,207.79 S/. 2,207.79 (100%) 0.00 0.00 0.00 0.00
02.01.04.06 COLUMNETAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.06.01 ACERO GRADO 60 EN COLUMNETAS kg 3,217.09 S/. 3,217.09 (100%) 0.00 0.00 0.00 0.00
02.01.04.06.02 CONCRETO F'C= 175 KG/CM2, EN COLUMNETAS m3 1,443.02 S/. 1,443.02 (100%) 0.00 0.00 0.00 0.00
02.01.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 2,840.04 S/. 2,840.04 (100%) 0.00 0.00 0.00 0.00
02.01.04.07 VIGUETAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.07.01 ACERO GRADO 60 EN VIGUETAS kg 5,057.09 S/. 5,057.09 (100%) 0.00 0.00 0.00 0.00
02.01.04.07.02 CONCRETO F'c= 175KG/CM2, EN VIGUETAS m3 1,429.23 S/. 1,429.23 (100%) 0.00 0.00 0.00 0.00
02.01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 1,800.38 S/. 1,800.38 (100%) 0.00 0.00 0.00 0.00
02.01.04.08 LOSAS ALIGERADAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.08.01 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 8,719.88 S/. 8,719.88 (100%) 0.00 0.00 0.00 0.00
02.01.04.08.02 ACERO FY= 4200 KG/CM2 PARA LOSAS ALIGERADAS kg 27,259.16 S/. 27,259.16 (100%) 0.00 0.00 0.00 0.00
02.01.04.08.03 CONCRETO F'C= 210 KG/CM2. PARA LOSAS ALIGERADAS m3 19,064.66 S/. 19,064.66 (100%) 0.00 0.00 0.00 0.00
02.01.04.08.04 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 9,724.68 S/. 9,724.68 (100%) 0.00 0.00 0.00 0.00
02.02 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
02.02.01.01 MUROS DE LADRILLO ARTESANAL DE CABEZA m2 14,404.00 S/. 14,404.00 (100%) 0.00 0.00 0.00 0.00
02.02.01.02 MURO DE LADRILLO ARTESANAL DE SOGA m2 11,614.71 S/. 11,614.71 (100%) 0.00 0.00 0.00 0.00
02.02.01.03 ACERO EN MURO REFORZADO GRADO 60 kg 2,391.26 S/. 2,391.26 (100%) 0.00 0.00 0.00 0.00
02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02.01 TARRAJEO EN ESTRUCTURAS DE CONCRETO m2 12,804.95 0.00 S/. 12,804.95 (100%) 0.00 0.00 0.00
02.02.02.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 2,387.18 0.00 S/. 2,387.18 (100%) 0.00 0.00 0.00
02.02.02.03 TARRAJEO EN INTERIORES ACABADO CON C:A m2 9,301.66 0.00 S/. 9,301.66 (100%) 0.00 0.00 0.00
02.02.02.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m2 518.40 0.00 S/. 518.40 (100%) 0.00 0.00 0.00
02.02.02.05 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 4,628.81 0.00 S/. 4,628.81 (100%) 0.00 0.00 0.00
02.02.02.06 BRUÑA EN INTERIORES Y EXTERIORES m 2,341.84 0.00 S/. 2,341.84 (100%) 0.00 0.00 0.00
02.02.03 CIELORRASOS 0.00 0.00 0.00 0.00 0.00 0.00
02.02.03.01 VALDOSA EN CIELORASO m2 23,616.00 0.00 S/. 23,616.00 (100%) 0.00 0.00 0.00
02.02.04 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04.01 PISO CERAMICO DE 45X45CM m2 32,693.50 0.00 S/. 32,693.50 (100%) 0.00 0.00 0.00
02.02.04.02 VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 m2 2,629.66 0.00 S/. 2,629.66 (100%) 0.00 0.00 0.00
02.02.04.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 550.12 0.00 S/. 550.12 (100%) 0.00 0.00 0.00
02.02.04.04 JUNTAS DE DILATACION DE E=1" m 474.54 0.00 S/. 474.54 (100%) 0.00 0.00 0.00
02.02.05 CONTRAZOCALOS 0.00 0.00 0.00 0.00 0.00 0.00
02.02.05.01 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM PULIDO m 2,301.20 0.00 S/. 2,301.20 (100%) 0.00 0.00 0.00
02.02.05.02 ZOCALO DE MAYOLICA BLANCA DE 20 X 30 CM DE 1RA m2 27,624.00 0.00 S/. 27,624.00 (100%) 0.00 0.00 0.00
02.02.06 COBERTURAS 0.00 0.00 0.00 0.00 0.00 0.00
02.02.06.01 COBERTURA CON TEJA ANDINA m2 25,175.32 0.00 S/. 7,504.18 (29.81%) S/. 17,671.14 (70.19%) 0.00 0.00
02.02.06.02 CUMBRERA DE TEJA ANDINA ML 2,141.71 0.00 S/. 2,141.71 (100%) 0.00 0.00 0.00
02.02.07 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07.01 PUERTA DE MADERA APANELADA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07.01.01 PUERTA P-1 (1.20x2.95) und 4,400.00 0.00 S/. 4,262.50 (96.88%) S/. 137.50 (3.13%) 0.00 0.00
02.02.07.01.02 PUERTA P-2 (1.00x2.95) und 2,200.00 0.00 S/. 2,200.00 (100%) 0.00 0.00 0.00
02.02.07.01.03 PUERTA P-4 (1.20x2.95) und 2,200.00 0.00 S/. 2,200.00 (100%) 0.00 0.00 0.00
02.02.07.01.04 PUERTA P-P (1.60x2.60) und 1,100.00 0.00 S/. 1,100.00 (100%) 0.00 0.00 0.00
02.02.07.02 PUERTA DE MADERA CONTRAPLACADA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07.02.01 PUERTA P-3 (0.80x2.95) und 3,200.00 0.00 S/. 3,100.00 (96.88%) S/. 100.00 (3.13%) 0.00 0.00
02.02.07.03 VENTANA DE MADERA CEDRO 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07.03.01 V-1 (2.05mx1.70m) und 1,800.00 0.00 S/. 1,800.00 (100%) 0.00 0.00 0.00
02.02.07.03.02 V-2 (2.10mx0.95m) und 900.00 0.00 S/. 900.00 (100%) 0.00 0.00 0.00
02.02.07.03.03 V-3 (1.10mx0.95m) und 2,700.00 0.00 S/. 2,700.00 (100%) 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
02.02.07.03.04 V-4 (1.05mx0.95m) und 1,800.00 0.00 S/. 1,800.00 (100%) 0.00 0.00 0.00
02.02.07.03.05 V-5 (1.00mx0.95m) und 4,500.00 0.00 S/. 4,500.00 (100%) 0.00 0.00 0.00
02.02.08 CERRAJERIA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.08.01 BISAGRA CAPUCHINA DE 4" X4" pza 525.72 0.00 S/. 525.72 (100%) 0.00 0.00 0.00
02.02.08.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 207.00 0.00 S/. 207.00 (100%) 0.00 0.00 0.00
02.02.08.03 MANIJA DE 4" PARA PUERTAS TIPO GLOBO pza 193.71 0.00 S/. 193.71 (100%) 0.00 0.00 0.00
02.02.08.04 BISAGRA ALUMINIZADA CAPUCHINA DE 2" X 2" pza 1,649.52 0.00 S/. 1,649.52 (100%) 0.00 0.00 0.00
02.02.08.05 PORTAÑUELA DE VENTANA pza 821.28 0.00 S/. 821.28 (100%) 0.00 0.00 0.00
02.02.08.06 CERROJO PARA VENTANAS pza 1,008.33 0.00 S/. 1,008.33 (100%) 0.00 0.00 0.00
02.02.09 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.00 0.00 0.00
02.02.09.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 3,087.56 0.00 0.00 S/. 3,087.56 (100%) 0.00 0.00
02.02.10 PINTURA 0.00 0.00 0.00 0.00 0.00 0.00
02.02.10.01 PINTURA LATEX EN CIELORASO, DOS MANOS m2 1,169.06 0.00 S/. 1,169.06 (100%) 0.00 0.00 0.00
02.02.10.02 PINTURA LATEX EN FRISOS Y ALEROS, 2 MANOS m2 390.02 0.00 S/. 390.02 (100%) 0.00 0.00 0.00
02.02.10.03 PINTURA EN MUROS EXT.. INT. CON ESMALTE m2 6,908.95 0.00 S/. 2,059.40 (29.81%) S/. 4,849.55 (70.19%) 0.00 0.00
02.02.10.04 PINTURA EN COLUMNAS CON ESMALTE m2 470.11 0.00 S/. 470.11 (100%) 0.00 0.00 0.00
02.02.10.05 PINTURA EN COLUMNETAS CON ESMALTE m2 51.99 0.00 S/. 51.99 (100%) 0.00 0.00 0.00
02.02.10.06 PINTURA LATEX EN VIGAS, 2 MANOS m2 369.58 0.00 S/. 369.58 (100%) 0.00 0.00 0.00
02.02.10.07 PINTURA EN PUERTAS CON BARNIZ, 2 MANOS m2 3,008.57 0.00 S/. 1,295.36 (43.06%) S/. 1,713.21 (56.94%) 0.00 0.00
02.02.10.08 PINTURA EN VENTANAS C/BARNIZ 2 MANOS m2 776.57 0.00 S/. 776.57 (100%) 0.00 0.00 0.00
02.02.10.09 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m2 152.13 0.00 S/. 152.13 (100%) 0.00 0.00 0.00
02.03 OTROS 0.00 0.00 0.00 0.00 0.00 0.00
02.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML 497.92 0.00 S/. 497.92 (100%) 0.00 0.00 0.00
02.03.02 JUNTAS ASFALTICAS m 435.16 0.00 S/. 435.16 (100%) 0.00 0.00 0.00
02.04 INSTALACIONES ELECTRICAS PUESTO DE SALUD 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto 4,090.80 0.00 S/. 4,090.80 (100%) 0.00 0.00 0.00
02.04.01.02 SALIDA DE PARED INTERRUPTOR SIMPLE/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto 2,410.85 0.00 S/. 2,410.85 (100%) 0.00 0.00 0.00
02.04.01.03 SALIDA DE PARED INTERRUPTOR DOBLE pto 1,130.70 0.00 S/. 1,130.70 (100%) 0.00 0.00 0.00
02.04.01.04 SALIDA TOMACORRIENTE C/AWG TW 4MM(12)+D PVC SEL 19MM(3/4) PTO 3,712.50 0.00 S/. 3,712.50 (100%) 0.00 0.00 0.00
02.04.01.05 CAJA DE DISTRIBUCION 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.05.01 CAJA DE PASE TIPO C.E. - 1 L.P.022-91 INVERMET und 341.19 0.00 S/. 341.19 (100%) 0.00 0.00 0.00
02.04.01.06 TABLERO ELECTRICO 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.06.01 TABLERO TD-01 und 586.32 0.00 S/. 586.32 (100%) 0.00 0.00 0.00
02.04.01.06.02 TABLERO TD-02 und 516.32 0.00 S/. 516.32 (100%) 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
02.04.01.07 ARTEFACTOS 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.07.01 ARTEFACTO FLUORECENTE 1X32 W CIRCULAR und 1,467.20 0.00 S/. 1,467.20 (100%) 0.00 0.00 0.00
02.04.01.07.02 ARTEFACTO TIPO WALL SOQUETE und 414.09 0.00 S/. 414.09 (100%) 0.00 0.00 0.00
02.04.01.07.03 FLUORESCENTE RECTO 1 X 18 W INC EQUIPO Y PANTALL und 838.40 0.00 S/. 838.40 (100%) 0.00 0.00 0.00
02.05 INSTALACIONES SANITARIAS PUESTO DE SALUD 0.00 0.00 0.00 0.00 0.00 0.00
02.05.01 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00
02.05.01.01 TUBERIA PVC SAP CLASE 5 DE 3" P/LLUVIAS m 379.71 0.00 S/. 379.71 (100%) 0.00 0.00 0.00
02.05.01.02 CANALETA DE PLANCHA DE FªGª D=6", E=1/27" INCL. SOPORTE - ABRAZADERA DE 1"X3/8" m 1,548.96 0.00 S/. 1,548.96 (100%) 0.00 0.00 0.00
02.05.02 APARATOS Y ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00 0.00
02.05.02.01 SALIDA DE DESAGUE EN PVC pto 1,411.92 0.00 0.00 S/. 1,411.92 (100%) 0.00 0.00
02.05.02.02 VENTILACION C/TUBERIA PVC SAL 2" pto 153.63 0.00 0.00 S/. 153.63 (100%) 0.00 0.00
02.05.02.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 234.99 0.00 0.00 S/. 234.99 (100%) 0.00 0.00
02.05.02.04 SUMINISTRO E INSTALACION DE TUBERIA P.V.C. A10 4" m 13,800.00 0.00 0.00 S/. 13,800.00 (100%) 0.00 0.00
02.05.02.05 SUMINISTRO E INSTALACION DE TUBERIA P.V.C. A10 2" m 281.25 0.00 0.00 S/. 281.25 (100%) 0.00 0.00
02.05.02.06 INODORO TANQUE BAJO COLOR pza 1,103.67 0.00 0.00 S/. 1,103.67 (100%) 0.00 0.00
02.05.02.07 SUMIDERO DE 2", pza 585.34 0.00 0.00 S/. 585.34 (100%) 0.00 0.00
02.05.02.08 SUMIDEROS DE BRONCE DE 4" PROVISION Y COLOCACION. und 160.02 0.00 0.00 S/. 160.02 (100%) 0.00 0.00
02.05.02.09 SOMBRERO PARA VENTILACION DE P.V.C. DE 2" pza 312.03 0.00 0.00 S/. 312.03 (100%) 0.00 0.00
02.05.02.10 VALVULA GLOBO DE BRONCE DE UNION ROSCADA DE 1/2" und 311.84 0.00 0.00 S/. 311.84 (100%) 0.00 0.00
02.05.02.11 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 1,172.20 0.00 0.00 S/. 1,172.20 (100%) 0.00 0.00
02.05.02.12 LAVATORIOS DE PEDESTAL BLANCO pza 987.99 0.00 0.00 S/. 987.99 (100%) 0.00 0.00
02.05.02.13 LAVADERO DE ACERO INOXIDABLE und 927.99 0.00 0.00 S/. 927.99 (100%) 0.00 0.00
02.06 SISTEMA DE BAJADA MONTAJE(PLUVIAL) 0.00 0.00 0.00 0.00 0.00 0.00
02.06.01 ABRAZADERA DE FIJACION DE TUBO pza 205.48 0.00 0.00 S/. 205.48 (100%) 0.00 0.00
02.06.02 COLECTOR DE ZINC GALVANIZADO und 196.64 0.00 S/. 172.06 (87.5%) S/. 24.58 (12.5%) 0.00 0.00
02.06.03 ABRAZADERA DE FIJACION DE TUBERIA DE 3" und 616.44 0.00 S/. 616.44 (100%) 0.00 0.00 0.00
02.06.04 CANALETA DE EVACUACION PLUVIAL IMPERMEABILIZADO m 90.07 0.00 S/. 90.07 (100%) 0.00 0.00 0.00
02.06.05 REJILLA METALICA EN CANALETAS DE DRENAJE PLUVIAL ML 14,137.20 0.00 0.00 S/. 14,137.20 (100%) 0.00 0.00
03 VIVIENDA RESIDENCIA 0.00 0.00 0.00 0.00 0.00 0.00
03.01 ESTRUCTURAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 372.84 0.00 S/. 372.84 (100%) 0.00 0.00 0.00
03.01.01.02 TRAZO REPLANTEO Y COLOCACION DE NIVELES m2 698.88 0.00 S/. 698.88 (100%) 0.00 0.00 0.00
03.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02.01 EXCAVACION MASIVA PARA PLATAFORMA m3 1,801.01 0.00 S/. 1,801.01 (100%) 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
03.01.02.02 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 1,964.43 0.00 S/. 1,939.87 (98.75%) S/. 24.56 (1.25%) 0.00 0.00
03.01.02.03 EXCAVACION PARA CIMIENTOS m3 1,503.99 0.00 S/. 1,503.99 (100%) 0.00 0.00 0.00
03.01.02.04 EXCAVACION MANUAL DE VEREDAS m3 306.48 0.00 S/. 306.48 (100%) 0.00 0.00 0.00
03.01.02.05 EXCAVACION MANUAL DE ZANJA P/SARDINELES m3 202.87 0.00 S/. 202.87 (100%) 0.00 0.00 0.00
03.01.02.06 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M. m3 169.22 0.00 S/. 169.22 (100%) 0.00 0.00 0.00
03.01.02.07 NIVELACION INTERIOR Y APISONADO MANUAL m2 65.38 0.00 S/. 65.38 (100%) 0.00 0.00 0.00
03.01.02.08 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (100 M.) m3 3,388.69 0.00 S/. 2,091.46 (61.72%) S/. 1,297.23 (38.28%) 0.00 0.00
03.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00
03.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 144.21 0.00 0.00 S/. 144.21 (100%) 0.00 0.00
03.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 3,721.42 0.00 0.00 S/. 3,721.42 (100%) 0.00 0.00
03.01.03.03 CONCRETO EN SOBRECIMIENTO DE 1:8 + 30% PM m3 1,836.81 0.00 0.00 S/. 1,836.81 (100%) 0.00 0.00
03.01.03.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 MT m2 2,181.51 0.00 0.00 S/. 2,181.51 (100%) 0.00 0.00
03.01.03.05 FALSO PISO DE 4" DE CONCRETO 1:10 m2 1,155.70 0.00 0.00 S/. 1,155.70 (100%) 0.00 0.00
03.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.01 ZAPATAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.01.01 CONCRETO F'c= 175KG/CM2, EN ZAPATAS m3 4,603.10 0.00 0.00 S/. 4,603.10 (100%) 0.00 0.00
03.01.04.01.02 ACERO PARA ZAPATAS GRADO 60 kg 1,260.02 0.00 0.00 S/. 1,260.02 (100%) 0.00 0.00
03.01.04.02 VIGAS DE CIMENTACION 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 1,851.19 0.00 0.00 S/. 1,851.19 (100%) 0.00 0.00
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION m2 1,759.05 0.00 0.00 S/. 1,759.05 (100%) 0.00 0.00
03.01.04.02.03 ACERO EN VIGA DE CIMENTACION GRADO 60, kg 4,583.95 0.00 0.00 S/. 4,583.95 (100%) 0.00 0.00
03.01.04.03 COLUMNAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.03.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 2,950.19 0.00 0.00 S/. 2,950.19 (100%) 0.00 0.00
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 2,743.88 0.00 0.00 S/. 2,743.88 (100%) 0.00 0.00
03.01.04.03.03 ACERO FY=4200 PARA COLUMNAS kg 5,135.13 0.00 0.00 S/. 5,135.13 (100%) 0.00 0.00
03.01.04.04 VIGAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 4,724.88 0.00 0.00 S/. 4,724.88 (100%) 0.00 0.00
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 7,191.30 0.00 0.00 S/. 7,191.30 (100%) 0.00 0.00
03.01.04.04.03 ACERO GRADO 60 EN VIGAS kg 19,252.78 0.00 0.00 S/. 19,252.78 (100%) 0.00 0.00
03.01.04.05 LOSAS ALIGERADAS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.04.05.01 CONCRETO F'C= 210 KG/CM2. PARA LOSAS ALIGERADAS m3 7,013.04 0.00 0.00 S/. 7,013.04 (100%) 0.00 0.00
03.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 3,315.00 0.00 0.00 S/. 3,315.00 (100%) 0.00 0.00
03.01.04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 3,019.50 0.00 0.00 S/. 3,019.50 (100%) 0.00 0.00
03.01.04.05.04 ACERO FY= 4200 KG/CM2 PARA LOSAS ALIGERADAS kg 7,692.80 0.00 0.00 S/. 7,692.80 (100%) 0.00 0.00
03.02 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
03.02.01 ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00
03.02.01.01 MUROS DE LADRILLO ARTESANAL DE CABEZA m2 9,229.25 0.00 0.00 S/. 3,749.38 (40.62%) S/. 5,479.87 (59.38%) 0.00
03.02.01.02 MURO DE LADRILLO ARTESANAL DE SOGA m2 3,120.83 0.00 0.00 S/. 2,535.67 (81.25%) S/. 585.16 (18.75%) 0.00
03.02.01.03 ACERO EN MURO REFORZADO GRADO 60 kg 999.29 0.00 0.00 S/. 999.29 (100%) 0.00 0.00
03.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02.01 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 5,589.37 0.00 0.00 0.00 S/. 5,589.37 (100%) 0.00
03.02.02.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 1,348.92 0.00 0.00 0.00 S/. 1,348.92 (100%) 0.00
03.02.02.03 TARRAJEO DE VIGAS m2 3,904.22 0.00 0.00 0.00 S/. 3,904.22 (100%) 0.00
03.02.02.04 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 581.83 0.00 0.00 0.00 S/. 581.83 (100%) 0.00
03.02.02.05 BRUÑA EN INTERIORES Y EXTERIORES m 1,369.12 0.00 0.00 0.00 S/. 1,369.12 (100%) 0.00
03.02.03 CIELORRASOS 0.00 0.00 0.00 0.00 0.00 0.00
03.02.03.01 VALDOSA EN CIELORASO m2 9,462.14 0.00 0.00 0.00 S/. 9,462.14 (100%) 0.00
03.02.04 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
03.02.04.01 PISO DE CERAMICO ANTIDESLIZANTE m2 1,141.44 0.00 0.00 0.00 S/. 1,141.44 (100%) 0.00
03.02.04.02 PISOS DE CONCRETO COLOREADO m2 2,049.14 0.00 0.00 0.00 S/. 2,049.14 (100%) 0.00
03.02.04.03 VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 m2 1,996.13 0.00 0.00 0.00 S/. 1,996.13 (100%) 0.00
03.02.04.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 416.50 0.00 0.00 0.00 S/. 416.50 (100%) 0.00
03.02.04.05 JUNTAS ASFALTICAS m 356.80 0.00 0.00 0.00 S/. 356.80 (100%) 0.00
03.02.05 CONTRAZOCALOS 0.00 0.00 0.00 0.00 0.00 0.00
03.02.05.01 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM PULIDO m 361.92 0.00 0.00 0.00 S/. 361.92 (100%) 0.00
03.02.05.02 ZOCALO DE MAYOLICA BLANCA DE 20 X 30 CM DE 1RA m2 1,822.17 0.00 0.00 0.00 S/. 1,822.17 (100%) 0.00
03.02.06 COBERTURAS 0.00 0.00 0.00 0.00 0.00 0.00
03.02.06.01 COBERTURA CON TEJA DE ARCILLA COCIDA m2 14,503.32 0.00 0.00 0.00 S/. 14,244.33 (98.21%) S/. 258.99 (1.79%)
03.02.06.02 CUMBRERA DE TEJA ANDINA ML 798.68 0.00 0.00 0.00 S/. 798.68 (100%) 0.00
03.02.07 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00 0.00
03.02.07.01 PUERTA DE MADERA APANELADA 0.00 0.00 0.00 0.00 0.00 0.00
03.02.07.01.01 PUERTA P-1 (1.15x2.60m) und 1,100.00 0.00 0.00 0.00 S/. 962.50 (87.5%) S/. 137.50 (12.5%)
03.02.07.01.02 PUERTA P-2 (1.00x2.60m) und 3,300.00 0.00 0.00 0.00 S/. 962.50 (29.17%) S/. 2,337.50 (70.83%)
03.02.07.02 PUERTA DE MADERA CONTRAPLACADA 0.00 0.00 0.00 0.00 0.00 0.00
03.02.07.02.01 PUERTA P-3 (0.80x2.60m) und 1,200.00 0.00 0.00 0.00 S/. 1,050.00 (87.5%) S/. 150.00 (12.5%)
03.02.07.03 VENTANA DE MADERA CEDRO 0.00 0.00 0.00 0.00 0.00 0.00
03.02.07.03.01 V-1 (1.00mx1.50m) und 6,300.00 0.00 0.00 0.00 S/. 2,756.25 (43.75%) S/. 3,543.75 (56.25%)
03.02.07.03.02 V-2 (1.50mx1.50m) und 6,300.00 0.00 0.00 0.00 S/. 2,756.25 (43.75%) S/. 3,543.75 (56.25%)
03.02.07.03.03 V-3 (0.60mx0.40m) und 1,800.00 0.00 0.00 0.00 S/. 1,575.00 (87.5%) S/. 225.00 (12.5%)
03.02.08 CERRAJERIA 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
03.02.08.01 BISAGRA CAPUCHINA DE 4" X4" pza 337.00 0.00 0.00 0.00 0.00 S/. 337.00 (100%)
03.02.08.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 207.00 0.00 0.00 0.00 0.00 S/. 207.00 (100%)
03.02.08.03 MANIJA DE 4" PARA PUERTAS TIPO GLOBO pza 88.05 0.00 0.00 0.00 0.00 S/. 88.05 (100%)
03.02.08.04 BISAGRA ALUMINIZADA CAPUCHINA DE 2" X 2" pza 474.00 0.00 0.00 0.00 0.00 S/. 474.00 (100%)
03.02.08.05 PORTAÑUELA DE VENTANA pza 188.80 0.00 0.00 0.00 0.00 S/. 188.80 (100%)
03.02.08.06 CERROJO PARA VENTANAS pza 231.80 0.00 0.00 0.00 0.00 S/. 231.80 (100%)
03.02.09 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.00 0.00 0.00
03.02.09.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,692.77 0.00 0.00 0.00 0.00 S/. 1,692.77 (100%)
03.02.10 PINTURA 0.00 0.00 0.00 0.00 0.00 0.00
03.02.10.01 PINTURA LATEX EN CIELORASOS, 2 MANOS m2 1,091.82 0.00 0.00 0.00 S/. 1,091.82 (100%) 0.00
03.02.10.02 PINTURA LATEX EN ALEROS, 2 MANOS m2 206.22 0.00 0.00 0.00 S/. 206.22 (100%) 0.00
03.02.10.03 PINTURA LATEX EN MUROS, 02 MANOS m2 1,301.78 0.00 0.00 0.00 S/. 1,301.78 (100%) 0.00
03.02.10.04 PINTURA LATEX EN COLUMNAS , 2 MANOS m2 206.04 0.00 0.00 0.00 S/. 206.04 (100%) 0.00
03.02.10.05 PINTURA LATEX EN VIGAS, 2 MANOS m2 441.96 0.00 0.00 0.00 S/. 441.96 (100%) 0.00
03.02.10.06 PINTURA EN PUERTAS CON BARNIZ, 2 MANOS m2 409.16 0.00 0.00 0.00 S/. 409.16 (100%) 0.00
03.02.10.07 PINTURA EN VENTANAS C/BARNIZ 2 MANOS m2 992.35 0.00 0.00 0.00 S/. 992.35 (100%) 0.00
03.03 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00
03.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML 533.40 0.00 0.00 S/. 533.40 (100%) 0.00 0.00
03.03.02 JUNTAS ASFALTICAS m 208.12 0.00 0.00 0.00 S/. 208.12 (100%) 0.00
03.04 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00
03.04.01 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00
03.04.01.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4) pto 1,363.60 0.00 0.00 0.00 S/. 1,363.60 (100%) 0.00
03.04.01.02 SALIDA DE PARED C/CABLE AWG TW 4.0MM(12)+D PVC SEL 19MM(3/4) pto 171.95 0.00 0.00 0.00 S/. 171.95 (100%) 0.00
03.04.01.03 SALIDA DE PARED INTERRUPTOR DOBLE pto 1,709.55 0.00 0.00 0.00 S/. 1,709.55 (100%) 0.00
03.04.02 CAJA DE DISTRIBUCION 0.00 0.00 0.00 0.00 0.00 0.00
03.04.02.01 CAJA DE PASE TIPO C.E. - 1 L.P.022-91 INVERMET und 682.38 0.00 0.00 0.00 S/. 682.38 (100%) 0.00
03.04.03 TABLERO PRINCIPALES 0.00 0.00 0.00 0.00 0.00 0.00
03.04.03.01 TABLERO TD-01 und 516.32 0.00 0.00 0.00 S/. 451.78 (87.5%) S/. 64.54 (12.5%)
03.04.03.02 TABLERO TD-02 und 516.32 0.00 0.00 0.00 S/. 451.78 (87.5%) S/. 64.54 (12.5%)
03.04.04 ARTEFACTOS DE ILUMINACION 0.00 0.00 0.00 0.00 0.00 0.00
03.04.04.01 FLUORESCENTE RECTO 1 X 18 W INC EQUIPO Y PANTALL und 873.60 0.00 0.00 0.00 0.00 S/. 873.60 (100%)
03.05 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00
03.05.01 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0.00 0.00 0.00
03.05.01.01 TUBERIA PVC SAP CLASE 5 DE 3" P/LLUVIAS m 245.83 0.00 0.00 0.00 S/. 245.83 (100%) 0.00
03.05.01.02 CANALETA DE PLANCHA DE FªGª D=6", E=1/27" INCL. SOPORTE - ABRAZADERA DE 1"X3/8" m 843.94 0.00 0.00 0.00 S/. 843.94 (100%) 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
03.05.02 APARATOS Y ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00 0.00
03.05.02.01 SALIDA DE DESAGUE EN PVC pto 588.30 0.00 0.00 0.00 S/. 257.38 (43.75%) S/. 330.92 (56.25%)
03.05.02.02 VENTILACION C/TUBERIA PVC SAL 2" pto 17.07 0.00 0.00 0.00 S/. 14.94 (87.52%) S/. 2.13 (12.48%)
03.05.02.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 234.99 0.00 0.00 0.00 S/. 205.62 (87.5%) S/. 29.37 (12.5%)
03.05.02.04 SUMINISTRO E INSTALACION DE TUBERIA P.V.C. A10 4" m 220.80 0.00 0.00 0.00 S/. 193.20 (87.5%) S/. 27.60 (12.5%)
03.05.02.05 SUMINISTRO E INSTALACION DE TUBERIA P.V.C. A10 2" m 90.00 0.00 0.00 0.00 S/. 78.75 (87.5%) S/. 11.25 (12.5%)
03.05.02.06 INODORO TANQUE BAJO BLANCO pza 367.89 0.00 0.00 0.00 S/. 321.90 (87.5%) S/. 45.99 (12.5%)
03.05.02.07 SUMIDERO DE 2", pza 418.10 0.00 0.00 0.00 S/. 182.92 (43.75%) S/. 235.18 (56.25%)
03.05.02.08 SUMIDEROS DE BRONCE DE 4" PROVISION Y COLOCACION. und 160.02 0.00 0.00 0.00 S/. 140.02 (87.5%) S/. 20.00 (12.5%)
03.05.02.09 SOMBRERO PARA VENTILACION DE P.V.C. DE 2" pza 34.67 0.00 0.00 0.00 S/. 30.34 (87.51%) S/. 4.33 (12.49%)
03.05.02.10 SUMINISTRO VALVULA COMPUERTA 1/2" und 1,235.92 0.00 0.00 0.00 S/. 1,081.43 (87.5%) S/. 154.49 (12.5%)
03.05.02.11 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 468.89 0.00 0.00 0.00 S/. 205.14 (43.75%) S/. 263.75 (56.25%)
03.06 SISTEMA DE BAJADA MONTAJE(PLUVIAL) 0.00 0.00 0.00 0.00 0.00 0.00
03.06.01 ABRAZADERA DE FIJACION DE TUBO pza 205.48 0.00 0.00 0.00 0.00 S/. 205.48 (100%)
03.06.02 COLECTOR DE ZINC GALVANIZADO und 196.64 0.00 0.00 0.00 0.00 S/. 196.64 (100%)
03.06.03 ABRAZADERA DE FIJACION DE TUBERIA DE 3" und 616.44 0.00 0.00 0.00 0.00 S/. 616.44 (100%)
04 CASETA DE FUERZA 0.00 0.00 0.00 0.00 0.00 0.00
04.01 ESTRUCTURAS 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 48.92 0.00 0.00 S/. 48.92 (100%) 0.00 0.00
04.01.01.02 TRAZO REPLANTEO Y COLOCACION DE NIVELES m2 91.71 0.00 0.00 S/. 91.71 (100%) 0.00 0.00
04.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02.01 EXCAVACION MANUAL DE PLATAFORMA EN TIERRA m3 1,062.62 0.00 0.00 S/. 686.28 (64.58%) S/. 376.34 (35.42%) 0.00
04.01.02.02 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 95.68 0.00 0.00 S/. 95.68 (100%) 0.00 0.00
04.01.02.03 EXCAVACION PARA CIMIENTOS m3 113.68 0.00 0.00 S/. 113.68 (100%) 0.00 0.00
04.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50 M.) m3 1,240.69 0.00 0.00 S/. 801.28 (64.58%) S/. 439.41 (35.42%) 0.00
04.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 11.36 0.00 0.00 0.00 S/. 11.36 (100%) 0.00
04.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 436.10 0.00 0.00 0.00 S/. 436.10 (100%) 0.00
04.01.03.03 CONCRETO EN SOBRECIMIENTO DE 1:8 + 30% PM m3 345.17 0.00 0.00 0.00 S/. 345.17 (100%) 0.00
04.01.03.04 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT. m2 171.47 0.00 0.00 0.00 S/. 171.47 (100%) 0.00
04.01.03.05 FALSO PISO DE 4" DE CONCRETO 1:10 m2 107.02 0.00 0.00 0.00 S/. 107.02 (100%) 0.00
04.01.03.06 CONCRETO EN VEREDAS m2 171.44 0.00 0.00 0.00 S/. 171.44 (100%) 0.00
04.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.01 ZAPATAS 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
04.01.04.01.01 CONCRETO F'c= 175KG/CM2, EN ZAPATAS m3 616.96 0.00 0.00 0.00 S/. 616.96 (100%) 0.00
04.01.04.01.02 ACERO PARA ZAPATAS GRADO 60 kg 321.42 0.00 0.00 0.00 S/. 321.42 (100%) 0.00
04.01.04.02 COLUMNAS 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.02.01 CONCRETO F'C= 210 KG/CM2. PARA COLUMNAS m3 609.82 0.00 0.00 0.00 S/. 609.82 (100%) 0.00
04.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 722.32 0.00 0.00 0.00 S/. 722.32 (100%) 0.00
04.01.04.02.03 ACERO FY=4200 PARA COLUMNAS kg 725.51 0.00 0.00 0.00 S/. 725.51 (100%) 0.00
04.01.04.03 VIGAS 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 397.61 0.00 0.00 0.00 S/. 397.61 (100%) 0.00
04.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 587.16 0.00 0.00 0.00 S/. 587.16 (100%) 0.00
04.01.04.03.03 ACERO GRADO 60 EN VIGAS kg 1,484.34 0.00 0.00 0.00 S/. 1,484.34 (100%) 0.00
04.01.04.04 LOSAS ALIGERADAS 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 826.20 0.00 0.00 0.00 S/. 826.20 (100%) 0.00
04.01.04.04.02 CONCRETO F'C= 210 KG/CM2. PARA LOSAS ALIGERADAS m3 894.01 0.00 0.00 0.00 S/. 894.01 (100%) 0.00
04.01.04.04.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 740.60 0.00 0.00 0.00 S/. 740.60 (100%) 0.00
04.01.04.04.04 ACERO FY= 4200 KG/CM2 PARA LOSAS ALIGERADAS kg 851.07 0.00 0.00 0.00 S/. 851.07 (100%) 0.00
04.02 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01 ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. m2 1,784.20 0.00 0.00 0.00 S/. 1,784.20 (100%) 0.00
04.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00
04.02.02.01 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 592.66 0.00 0.00 0.00 S/. 592.66 (100%) 0.00
04.02.02.02 TARRAJEO EN INTERIORES ACABADO CON C:A m2 592.66 0.00 0.00 0.00 S/. 592.66 (100%) 0.00
04.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 405.81 0.00 0.00 0.00 S/. 405.81 (100%) 0.00
04.02.02.04 TARRAJEO DE VIGAS m2 333.02 0.00 0.00 0.00 S/. 333.02 (100%) 0.00
04.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m2 43.05 0.00 0.00 0.00 S/. 43.05 (100%) 0.00
04.02.02.06 BRUÑA E=1 CM EN PISO VEREDA EXTERIOR m 295.31 0.00 0.00 0.00 S/. 295.31 (100%) 0.00
04.02.03 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03.01 PISOS DE CONCRETO COLOREADO m2 235.38 0.00 0.00 0.00 S/. 235.38 (100%) 0.00
04.02.03.02 VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 m2 616.74 0.00 0.00 0.00 S/. 616.74 (100%) 0.00
04.02.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 145.68 0.00 0.00 0.00 S/. 145.68 (100%) 0.00
04.02.03.04 BRUÑA E=1 CM EN PISO VEREDA EXTERIOR m 51.07 0.00 0.00 0.00 S/. 51.07 (100%) 0.00
04.02.04 CONTRAZOCALOS 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.01 CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM PULIDO m 561.70 0.00 0.00 0.00 S/. 561.70 (100%) 0.00
04.02.05 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05.01 PUERTA DE MADERA APANELADA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05.01.01 PUERTA P-1 (0.90x2.10) und 750.00 0.00 0.00 0.00 S/. 750.00 (100%) 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
04.02.05.02 VENTANA DE MADERA CEDRO 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05.02.01 V-1 (1.00mx0.40m) und 390.00 0.00 0.00 0.00 S/. 390.00 (100%) 0.00
04.02.06 CERRAJERIA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.06.01 BISAGRA CAPUCHINA DE 4" X4" pza 40.44 0.00 0.00 0.00 S/. 40.44 (100%) 0.00
04.02.06.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 103.50 0.00 0.00 0.00 S/. 103.50 (100%) 0.00
04.02.06.03 MANIJA DE 4" PARA PUERTAS TIPO GLOBO pza 17.61 0.00 0.00 0.00 S/. 17.61 (100%) 0.00
04.02.06.04 BISAGRA ALUMINIZADA CAPUCHINA DE 2" X 2" pza 18.96 0.00 0.00 0.00 S/. 18.96 (100%) 0.00
04.02.06.05 PORTAÑUELA DE VENTANA pza 9.44 0.00 0.00 0.00 S/. 9.44 (100%) 0.00
04.02.06.06 CERROJO PARA VENTANAS pza 11.59 0.00 0.00 0.00 S/. 11.59 (100%) 0.00
04.02.07 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.00 0.00 0.00
04.02.07.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 49.24 0.00 0.00 0.00 S/. 49.24 (100%) 0.00
04.02.08 PINTURA 0.00 0.00 0.00 0.00 0.00 0.00
04.02.08.01 PINTURA LATEX EN CIELORASOS, 2 MANOS m2 49.16 0.00 0.00 0.00 S/. 49.16 (100%) 0.00
04.02.08.02 PINTURA LATEX EN FRISOS Y ALEROS, 2 MANOS m2 86.30 0.00 0.00 0.00 S/. 86.30 (100%) 0.00
04.02.08.03 PINTURA LATEX EN MUROS, 02 MANOS m2 276.07 0.00 0.00 0.00 S/. 276.07 (100%) 0.00
04.02.08.04 PINTURA LATEX EN COLUMNAS , 2 MANOS m2 30.99 0.00 0.00 0.00 S/. 30.99 (100%) 0.00
04.02.08.05 PINTURA LATEX EN VIGAS, 2 MANOS m2 21.44 0.00 0.00 0.00 S/. 21.44 (100%) 0.00
04.02.08.06 PINTURA EN PUERTAS CON BARNIZ, 2 MANOS m2 43.42 0.00 0.00 0.00 S/. 43.42 (100%) 0.00
04.03 OTROS 0.00 0.00 0.00 0.00 0.00 0.00
04.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML 342.90 0.00 0.00 0.00 S/. 342.90 (100%) 0.00
04.03.02 JUNTAS ASFALTICAS m 75.68 0.00 0.00 0.00 S/. 75.68 (100%) 0.00
05 CERCO PERIMETRICO CON MUROS DE LADRILLO ARTESANAL Y REJA METALICA L=144.40 0.00 0.00 0.00 0.00 0.00 0.00
05.01 ESTRUCTURAS 0.00 0.00 0.00 0.00 0.00 0.00
05.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
05.01.02 LIMPIEZA DE TERRENO MANUAL m2 172.56 0.00 0.00 0.00 S/. 172.56 (100%) 0.00
05.01.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 202.16 0.00 0.00 0.00 S/. 202.16 (100%) 0.00
05.01.04 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
05.01.04.01 EXCAV. PARA CIMIENTOS HASTA 1.00 MT. TERRENO NORMAL m3 2,132.36 0.00 0.00 0.00 S/. 2,132.36 (100%) 0.00
05.01.04.02 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 1,865.76 0.00 0.00 0.00 S/. 1,865.76 (100%) 0.00
05.01.04.03 RELLENO MANUAL CON MATERIAL PROPIO 0.00 0.00 0.00 0.00 0.00 0.00
05.01.04.04 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO m3 388.67 0.00 0.00 0.00 S/. 253.72 (65.28%) S/. 134.95 (34.72%)
05.01.04.05 ELIMINACION DE MATERIAL EXEDENTE 0.00 0.00 0.00 0.00 0.00 0.00
05.01.04.06 ACARREO MAT. EXCEDENTE DE EXCAVACION DE PROM=30 M (A.C) m3 1,065.34 0.00 0.00 0.00 0.00 S/. 1,065.34 (100%)
05.01.04.07 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 178.66 0.00 0.00 0.00 0.00 S/. 178.66 (100%)
05.01.05 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
05.01.05.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 1,604.16 0.00 0.00 0.00 S/. 1,604.16 (100%) 0.00
05.01.05.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 14,246.06 0.00 0.00 0.00 S/. 14,246.06 (100%) 0.00
05.01.05.03 CONCRETO EN SOBRECIMIENTO DE 1:8 + 30% PM m3 5,050.21 0.00 0.00 0.00 S/. 5,050.21 (100%) 0.00
05.01.05.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 MT m2 8,620.79 0.00 0.00 0.00 S/. 7,235.31 (83.93%) S/. 1,385.48 (16.07%)
05.01.06 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00
05.01.06.01 ZAPATA 0.00 0.00 0.00 0.00 0.00 0.00
05.01.06.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 8,844.70 0.00 0.00 0.00 0.00 S/. 8,844.70 (100%)
05.01.06.01.02 ACERO PARA ZAPATAS GRADO 60 kg 6,701.97 0.00 0.00 0.00 0.00 S/. 6,701.97 (100%)
05.01.06.02 COLUMNAS 0.00 0.00 0.00 0.00 0.00 0.00
05.01.06.02.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 6,275.05 0.00 0.00 0.00 0.00 S/. 6,275.05 (100%)
05.01.06.02.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 5,762.16 0.00 0.00 0.00 0.00 S/. 5,762.16 (100%)
05.01.06.02.03 ACERO FY= 4200 KG/CM2 PARA COLUMNAS kg 17,564.09 0.00 0.00 0.00 0.00 S/. 17,564.09 (100%)
05.01.06.03 VIGAS 0.00 0.00 0.00 0.00 0.00 0.00
05.01.06.04 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 8,086.21 0.00 0.00 0.00 0.00 S/. 8,086.21 (100%)
05.01.06.05 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 1,846.85 0.00 0.00 0.00 0.00 S/. 1,846.85 (100%)
05.01.06.06 ACERO FY= 4200 KG/CM2 PARA COLUMNAS kg 18,310.79 0.00 0.00 0.00 0.00 S/. 18,310.79 (100%)
05.02 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.01 MURO DE LADRILLO ARTESANAL DE SOGA m2 15,505.72 0.00 0.00 0.00 0.00 S/. 8,605.67 (55.5%)
05.02.01.02 ACERO EN MURO REFORZADO GRADO 60 kg 3,022.50 0.00 0.00 0.00 0.00 S/. 3,022.50 (100%)
05.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00
05.02.02.01 TARRAJEO DE COLUMNAS - ARISTAS m 1,366.37 0.00 0.00 0.00 0.00 0.00
05.02.02.02 TARRAJEO DE VIGAS - ARISTAS m 1,000.93 0.00 0.00 0.00 0.00 0.00
05.02.02.03 TARRAJEO EN ESTRUCTURAS DE CONCRETO m2 2,467.74 0.00 0.00 0.00 0.00 0.00
05.02.02.04 BRUÑA EN INTERIORES Y EXTERIORES m 803.00 0.00 0.00 0.00 0.00 0.00
05.02.03 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00 0.00
05.02.03.01 REJA METALICA PARA CERCO CON TUBOS CUADRADOS Y CIRCULARES SEGUN DISEÑO H=2.10M ML 12,252.07 0.00 0.00 0.00 0.00 0.00
05.02.04 PINTURA 0.00 0.00 0.00 0.00 0.00 0.00
05.02.04.01 PINTURA EN MUROS EXT.. INT. CON ESMALTE m2 8,760.38 0.00 0.00 0.00 0.00 0.00
05.02.04.02 PINTURA ESMALTE EN ZOCALOS Y CONTRAZOCALOS m2 302.61 0.00 0.00 0.00 0.00 0.00
05.02.05 OTROS 0.00 0.00 0.00 0.00 0.00 0.00
05.02.05.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML 2,139.50 0.00 0.00 0.00 0.00 0.00
06 INGRESO PRINCIPAL 0.00 0.00 0.00 0.00 0.00 0.00
06.01 ESTRUCTURAS 0.00 0.00 0.00 0.00 0.00 0.00
06.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 74.75 0.00 0.00 0.00 0.00 S/. 74.75 (100%)
06.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 70.00 0.00 0.00 0.00 0.00 S/. 70.00 (100%)
06.01.01.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 76.00 0.00 0.00 0.00 0.00 S/. 76.00 (100%)
06.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
06.01.02.01 EXCAV. PARA CIMIENTOS HASTA 1.00 MT. TERRENO NORMAL m3 249.67 0.00 0.00 0.00 0.00 S/. 249.67 (100%)
06.01.02.02 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 351.62 0.00 0.00 0.00 0.00 S/. 351.62 (100%)
06.01.02.03 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO m3 18.42 0.00 0.00 0.00 0.00 S/. 18.42 (100%)
06.01.02.04 NIVELACION INTERIOR Y APISONADO MANUAL m2 44.44 0.00 0.00 0.00 0.00 S/. 44.44 (100%)
06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 152.44 0.00 0.00 0.00 0.00 S/. 152.44 (100%)
06.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00
06.01.03.01 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 367.16 0.00 0.00 0.00 0.00 S/. 367.16 (100%)
06.01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 2,396.96 0.00 0.00 0.00 0.00 S/. 2,396.96 (100%)
06.01.03.03 CONCRETO EN SOBRECIMIENTO DE 1:8 + 30% PM m3 530.09 0.00 0.00 0.00 0.00 S/. 530.09 (100%)
06.01.03.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 MT m2 963.19 0.00 0.00 0.00 0.00 S/. 963.19 (100%)
06.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.01 ZAPATA 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 1,821.96 0.00 0.00 0.00 0.00 S/. 1,821.96 (100%)
06.01.04.01.02 ACERO PARA ZAPATAS GRADO 60 kg 976.80 0.00 0.00 0.00 0.00 S/. 976.80 (100%)
06.01.04.02 COLUMNAS 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.02.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 1,252.88 0.00 0.00 0.00 0.00 S/. 1,252.88 (100%)
06.01.04.02.02 ACERO FY= 4200 KG/CM2 PARA COLUMNAS kg 3,167.18 0.00 0.00 0.00 0.00 S/. 3,167.18 (100%)
06.01.04.02.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 1,955.31 0.00 0.00 0.00 0.00 S/. 1,955.31 (100%)
06.01.04.03 VIGAS 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 423.43 0.00 0.00 0.00 0.00 S/. 423.43 (100%)
06.01.04.03.02 ACERO GRADO 60 EN VIGAS kg 878.38 0.00 0.00 0.00 0.00 S/. 878.38 (100%)
06.01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 729.70 0.00 0.00 0.00 0.00 S/. 729.70 (100%)
06.01.04.04 LOSA DE TECHO 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04.04.01 CONCRETO F'C= 210 KG/CM2. PARA LOSAS ALIGERADAS m3 459.87 0.00 0.00 0.00 0.00 S/. 459.87 (100%)
06.01.04.04.02 ACERO FY= 4200 KG/CM2 PARA LOSAS ALIGERADAS kg 661.40 0.00 0.00 0.00 0.00 S/. 661.40 (100%)
06.01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 553.33 0.00 0.00 0.00 0.00 S/. 553.33 (100%)
06.02 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00
06.02.01 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00 0.00
06.02.01.01 MURO DE LADRILLO KK ARCILLA DE SOGA M:1:4 E=1.5 CM m2 2,022.75 0.00 0.00 0.00 0.00 S/. 948.16 (46.87%)
06.02.01.02 ACERO EN MURO REFORZADO GRADO 60 kg 352.50 0.00 0.00 0.00 0.00 S/. 352.50 (100%)
06.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
06.02.02.01 TARRAJEO EN ESTRUCTURAS DE CONCRETO m2 800.15 0.00 0.00 0.00 0.00 0.00
06.02.02.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 245.60 0.00 0.00 0.00 0.00 0.00
06.02.02.03 TARRAJEO EN INTERIORES ACABADO CON C:A m2 308.99 0.00 0.00 0.00 0.00 0.00
06.02.03 CIELORRASOS 0.00 0.00 0.00 0.00 0.00 0.00
06.02.03.01 CIELO RASO m2 36.19 0.00 0.00 0.00 0.00 0.00
06.02.04 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
06.02.04.01 COMFORMADO, RIEGO Y COMPACTADO DE CALZADA m2 264.60 0.00 0.00 0.00 0.00 0.00
06.02.04.02 VEREDA RIGIDA DE CONCRETO F'C=140 KG/CM2 E=10CM.,PASTA 1:2 m2 81.23 0.00 0.00 0.00 0.00 0.00
06.02.04.03 JUNTAS DE DILATACION DE E=1" m 12.93 0.00 0.00 0.00 0.00 0.00
06.02.04.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 118.63 0.00 0.00 0.00 0.00 0.00
06.02.05 COBERTURAS 0.00 0.00 0.00 0.00 0.00 0.00
06.02.05.01 COBERTURA CON TEJA ANDINA m2 923.97 0.00 0.00 0.00 0.00 0.00
06.02.05.02 CUMBRERA DE TEJA ANDINA ML 150.12 0.00 0.00 0.00 0.00 0.00
06.02.06 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00 0.00
06.02.06.01 PUERTA METÁLICA DE INGRESO PRINCIPAL GLB 8,455.64 0.00 0.00 0.00 0.00 0.00
06.02.06.02 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 103.50 0.00 0.00 0.00 0.00 0.00
06.02.06.03 BISAGRA CAPUCHINA DE 4" X4" pza 53.92 0.00 0.00 0.00 0.00 0.00
06.02.06.04 MANIJA DE 4" PARA PUERTAS TIPO GLOBO pza 17.61 0.00 0.00 0.00 0.00 0.00
06.02.06.05 BISAGRA ALUMINIZADA CAPUCHINA DE 2" X 2" pza 9.48 0.00 0.00 0.00 0.00 0.00
06.02.07 PINTURA 0.00 0.00 0.00 0.00 0.00 0.00
06.02.07.01 PINTURA LATEX EN CIELORASO, DOS MANOS m2 77.58 0.00 0.00 0.00 0.00 0.00
06.02.07.02 PINTURA LATEX EN FRISOS Y ALEROS, 2 MANOS m2 197.51 0.00 0.00 0.00 0.00 0.00
06.02.07.03 PINTURA EN MUROS EXT.. INT. CON ESMALTE m2 262.61 0.00 0.00 0.00 0.00 0.00
06.03 OTROS 0.00 0.00 0.00 0.00 0.00 0.00
06.03.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML 497.92 0.00 0.00 0.00 0.00 0.00
06.03.02 JUNTAS ASFALTICAS m 94.60 0.00 0.00 0.00 0.00 0.00
07 OBRAS EXTERIORES PUESTO DE SALUD 0.00 0.00 0.00 0.00 0.00 0.00
07.01 SISTEMA DE DRENAJE PLUVIAL 0.00 0.00 0.00 0.00 0.00 0.00
07.01.01 TRAZO, NIVELACION Y REPLANTEO m 82.50 0.00 0.00 0.00 0.00 S/. 82.50 (100%)
07.01.02 EXCAVACION MANUAL DE ZANJA m3 471.02 0.00 0.00 0.00 0.00 S/. 82.43 (17.5%)
07.01.03 ELIMINACION DE MATERIAL EXCEDENTE D=30 M. m3 306.07 0.00 0.00 0.00 0.00 0.00
07.01.04 AFIRMADO DE 4" m2 1,129.20 0.00 0.00 0.00 0.00 0.00
07.01.05 CONCRETO F'C=175 KG/CM2. m3 6,271.56 0.00 0.00 0.00 0.00 0.00
07.01.06 TUBERIA PVC A-7.5 /AGUA POTABLE DE 6"+ELEM.UNION+3% DESPEDR m 958.95 0.00 0.00 0.00 0.00 0.00
07.01.07 JUNTAS ASFALTICAS m 170.28 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
07.02 CAJAS DISIPADORAS DE CONCRETO EN DRENAJE PLUVIAL 0.00 0.00 0.00 0.00 0.00 0.00
07.02.01 EXCAVACION MANUAL DE ZANJA m3 12.56 0.00 0.00 0.00 0.00 0.00
07.02.02 CONCRETO F'c= 175KG/CM2 m3 134.72 0.00 0.00 0.00 0.00 0.00
07.02.03 ENCOFRADO Y DESENCOFRADO m2 84.12 0.00 0.00 0.00 0.00 0.00
07.03 INSTALACIONES ELECTRICAS EXTERIORES 0.00 0.00 0.00 0.00 0.00 0.00
07.03.01 EXCAVACION MANUAL PARA TUBERIA INST. ELECTRICA m3 1,077.05 0.00 0.00 0.00 0.00 0.00
07.03.02 RELLENO COMPACTADO CON MATERIAL PROPIO m 251.50 0.00 0.00 0.00 0.00 0.00
07.03.03 CABLE ELECTRICO NYY 2 X 2.5 MM2. m 1,083.50 0.00 0.00 0.00 0.00 0.00
07.03.04 CABLE ELECTRICO NYY 1 X 35 MM2. m 2,067.60 0.00 0.00 0.00 0.00 0.00
07.03.05 TABLERO GRAL. DE 2X15A, 2X30A und 555.85 0.00 0.00 0.00 0.00 0.00
07.03.06 CAJA DE REGISTRO BUZON DE PASE (24X24) TAPA Cº und 787.56 0.00 0.00 0.00 0.00 0.00
07.03.07 PORTAMEDIDOR und 341.19 0.00 0.00 0.00 0.00 0.00
07.03.08 POZO CONEXION A TIERRA und 1,582.14 0.00 0.00 0.00 0.00 0.00
07.04 JARDENERIA 0.00 0.00 0.00 0.00 0.00 0.00
07.04.01 EXCAVACION PARA SEMBRADO DE PLANTAS ORNAMENTALES m3 889.00 0.00 0.00 0.00 0.00 0.00
07.04.02 PREPARACIÓN DE TIERRA PARA SEMBRIO DE PLANTAS HORNAMENTALES m3 1,066.75 0.00 0.00 0.00 0.00 0.00
07.04.03 GRASS GLB 8,000.00 0.00 0.00 0.00 0.00 0.00
07.04.04 SEMBRIO DE GRASS m2 5,023.20 0.00 0.00 0.00 0.00 0.00
07.04.05 SEMBRIO DE PLANTAS HORNAMENTALES und 2,093.00 0.00 0.00 0.00 0.00 0.00
07.05 SISTEMA DE AGUA POTABLE EN OBRAS EXTERIORES 0.00 0.00 0.00 0.00 0.00 0.00
07.05.01 TUBERIA PVC SAP DE 3/4" C- 10 C/R m 2,689.01 0.00 0.00 0.00 0.00 S/. 470.58 (17.5%)
07.05.02 CAJA DE REGISTRO DE AGUA DE 12" X 12" pza 530.92 0.00 0.00 0.00 0.00 0.00
07.05.03 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" pza 353.70 0.00 0.00 0.00 0.00 0.00
07.06 CUNETAS 0.00 0.00 0.00 0.00 0.00 0.00
07.06.01 CANALETA DE CONCRETO F'c= 175KG/CM2 P/EVAC. PLUVIAL ML 15,972.70 0.00 0.00 0.00 0.00 0.00
07.06.02 EXCAVACIÓN MANUAL PARA CANALETAS DE DRENAJE PLUVIAL m3 3,114.60 0.00 0.00 0.00 0.00 0.00
07.06.03 ENCOFRADO Y DESENCOF. CANALETAS DE DRENAJE PLUVIAL m2 3,862.57 0.00 0.00 0.00 0.00 0.00
07.07 INSTALACION EXTERIOR DE DESAGUE 0.00 0.00 0.00 0.00 0.00 0.00
07.07.01 SUMINISTRO E INSTALACION DE TUBERIA P.V.C. SAL DE 4" m 5,520.00 0.00 0.00 0.00 0.00 0.00
07.07.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 234.99 0.00 0.00 0.00 0.00 0.00
08 MITIGACION AMBIENTAL 0.00 0.00 0.00 0.00 0.00 0.00
08.01 APILAMIENTO DE DESECHOS FINALES DE OBRA GLB 2,500.00 0.00 0.00 0.00 0.00 0.00
08.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA GLB 3,000.00 0.00 0.00 0.00 0.00 0.00
08.03 ELIMINACION DE DESECHOS FINALIZADA LA OBRA GLB 2,700.00 0.00 0.00 0.00 0.00 0.00
09 CAPACITACIÓN 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO

REGION
PROVINCIA
DISTRITO
LUGAR
FECHA
DURACION

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4 MES 5
09.01 CAPACITACIÓN GLB 15,000.00 0.00 0.00 0.00 0.00 0.00
10 EQUIPAMIENTO Y APARATOS O ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00 0.00
10.01 EQUIPAMIENTO AMBIENTE (ENFERMERÍA Y OBSTETRICIA) GLB 130,000.00 0.00 0.00 0.00 0.00 0.00
10.02 EQUIPAMIENTO VIVIENDA RESIDENCIA GLB 15,000.00 0.00 0.00 0.00 0.00 0.00
10.03 APARATOS O ACCESORIOS SANITARIOS AMBIENTE(ENFERMERIA Y OBSTETRICIA) GLB 10,000.00 0.00 0.00 0.00 0.00 0.00
10.04 APARATOS O ACCESORIOS SANITARIOS VIVIENDA RESIDENCIA GLB 10,000.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0.00 0.00 0.00 0.00 0.00 0.00

COSTO DIRECTO 1,385,739.63 371,342.74 216,579.23 180,060.58 146,210.74 143,405.10


GASTOS GENERALES (10 %CD) 138,573.96 37,134.27 21,657.92 18,006.06 14,621.07 14,340.51
UTILIDAD (8 %CD) 110,859.17 29,707.42 17,326.34 14,404.85 11,696.86 11,472.41
SUB TOTAL 1,635,172.76 438,184.43 255,563.49 212,471.48 172,528.67 169,218.02
IGV (18% ST) 294,331.10 78,873.20 46,001.43 38,244.87 31,055.16 30,459.24
VALOR REFERENCIAL 1,929,503.86 517,057.63 301,564.92 250,716.35 203,583.83 199,677.26
GASTOS DE SUPERVISON (5 %CD) 69,286.98 18,567.14 10,828.96 9,003.03 7,310.54 7,170.25
TOTAL PRESUPUESTO 1,998,790.84 535,624.77 312,393.88 259,719.38 210,894.37 206,847.52
AVANCE MENSUAL (%) 100.00% 26.80% 15.63% 12.99% 10.55% 10.35%
AVANCE ACUMULADO (%) 100.00% 26.80% 42.43% 55.42% 65.97% 76.32%
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
S/. 19,578.95 (16.32%) S/. 4,500.00 (3.75%)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
S/. 6,900.05 (44.5%) 0.00
0.00 0.00
0.00 0.00
S/. 1,366.37 (100%) 0.00
S/. 1,000.93 (100%) 0.00
S/. 2,467.74 (100%) 0.00
S/. 803.00 (100%) 0.00
0.00 0.00
S/. 12,252.07 (100%) 0.00
0.00 0.00
S/. 8,760.38 (100%) 0.00
S/. 302.61 (100%) 0.00
0.00 0.00
S/. 2,139.50 (100%) 0.00
0.00 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
S/. 1,074.59 (53.13%) 0.00
0.00 0.00
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
S/. 800.15 (100%) 0.00
S/. 245.60 (100%) 0.00
S/. 308.99 (100%) 0.00
0.00 0.00
S/. 36.19 (100%) 0.00
0.00 0.00
S/. 264.60 (100%) 0.00
S/. 81.23 (100%) 0.00
S/. 12.93 (100%) 0.00
S/. 118.63 (100%) 0.00
0.00 0.00
S/. 923.97 (100%) 0.00
S/. 150.12 (100%) 0.00
0.00 0.00
S/. 8,455.64 (100%) 0.00
S/. 103.50 (100%) 0.00
S/. 53.92 (100%) 0.00
S/. 17.61 (100%) 0.00
S/. 9.48 (100%) 0.00
0.00 0.00
S/. 77.58 (100%) 0.00
S/. 197.51 (100%) 0.00
S/. 262.61 (100%) 0.00
0.00 0.00
S/. 497.92 (100%) 0.00
S/. 94.60 (100%) 0.00
0.00 0.00
0.00 0.00
0.00 0.00
S/. 388.59 (82.5%) 0.00
S/. 306.07 (100%) 0.00
S/. 1,129.20 (100%) 0.00
S/. 6,271.56 (100%) 0.00
S/. 958.95 (100%) 0.00
S/. 170.28 (100%) 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 0.00
S/. 12.56 (100%) 0.00
S/. 134.72 (100%) 0.00
S/. 84.12 (100%) 0.00
0.00 0.00
S/. 1,077.05 (100%) 0.00
S/. 251.50 (100%) 0.00
S/. 1,083.50 (100%) 0.00
S/. 2,067.60 (100%) 0.00
S/. 555.85 (100%) 0.00
S/. 787.56 (100%) 0.00
S/. 341.19 (100%) 0.00
S/. 1,582.14 (100%) 0.00
0.00 0.00
S/. 889.00 (100%) 0.00
S/. 285.74 (26.79%) S/. 781.01 (73.21%)
0.00 S/. 8,000.00 (100%)
0.00 S/. 5,023.20 (100%)
0.00 S/. 2,093.00 (100%)
0.00 0.00
S/. 2,218.43 (82.5%) 0.00
S/. 530.92 (100%) 0.00
S/. 353.70 (100%) 0.00
0.00 0.00
S/. 15,972.70 (100%) 0.00
S/. 3,114.60 (100%) 0.00
S/. 3,862.57 (100%) 0.00
0.00 0.00
S/. 5,520.00 (100%) 0.00
S/. 234.99 (100%) 0.00
0.00 0.00
0.00 S/. 2,500.00 (100%)
S/. 3,000.00 (100%) 0.00
S/. 2,632.50 (97.5%) S/. 67.50 (2.5%)
0.00 0.00
MA VALORIZADO DE EJECUCION DE OBRA

S/. / MESES
MES 6 MES 7
0.00 S/. 15,000.00 (100%)
0.00 0.00
0.00 S/. 130,000.00 (100%)
0.00 S/. 15,000.00 (100%)
0.00 S/. 10,000.00 (100%)
0.00 S/. 10,000.00 (100%)
0.00 0.00

125,176.56 202,964.71
12,517.66 20,296.47
10,014.12 16,237.18
147,708.34 239,498.36
26,587.50 43,109.70
174,295.84 282,608.06
6,258.83 10,148.24
180,554.67 292,756.30
9.03% 14.65%
85.35% 100.00%