Beruflich Dokumente
Kultur Dokumente
Area Population
• 283,561 km2 • Approximately
16,650,000
O
WAProtector
F System Observability and
Redundancy
Location
WAProtector validation
Criteria
Administrator
CENACE Monitoring of most congested
corridors
PMUs installed at Sistema Nacional Interconectado
Esmeraldas
1 PMU 2 PMUs
2 PMUs
5 PMUs
4 PMUs • 46 PMUs
1 PMU 2 PMUs
Baba
D. Peripa 1 PMU 1 PMU
Pucará
Baños
• Phasor Data Concentrator PDC
1 PMU 1 PMUAgoyán
based on Software located at
3 PMUs 1 PMU S. Francisco
CENACE
1 PMU 1 PMU
Steady-State
Voltage Stability
Oscillatory Stability
Harmonics
WAProtector’s TOOLS
Steady-State
DIgSILENT
Angle Stability 1.20
Voltage Stability
0.60
Oscillatory Stability
0.30
100.000
Harmonics 100.000
1.003 pu
0.584 pu
100.000
1.127 pu
0.608 pu
1.233 pu
0.627 pu
0.00
-0.30
0.00 0.30 0.60 0.90 1.20 1.50
x-Axis: Est_Voltaje_SRosa: Power in pu
Est_Voltaje_SRosa: Voltage stable side in pu
Est_Voltaje_SRosa: Voltage unstable side in pu
Est_Voltaje_SRosa: Voltage stable side in pu
Est_Voltaje_SRosa: Voltage unstable side in pu
Est_Voltaje_SRosa: Voltage stable side in pu
Est_Voltaje_SRosa: Voltage unstable side in pu
(DIgSILENT
Programming
Language)
WAMS applications
Time Domain
Simulation
Modelling of the Electric Power System
Frequency Response
Oscillations detected in eMEGAsim with a
generation of 1000 MW in CCS
Testbed for PSS Tuning
sys min p
p 1...nm
x j min x j x jmax
1 1
fc
2 T1T2
T1
n
T2
Testbed for PSS Tuning
Oscillations detected in eMEGAsim with a
generation of 1500 MW in CCS
Ecuadorian SPS
Special Transient instability
Protection
Scheme Voltage collapse
PMUs
Real
Amplified Signals
C37.118
MATLAB WAProtector Interface
C37.118
C37.118
C37.118
WAProtector
Steady-State Testing
Dynamic Testing
Trabaja cada día por iluminar a los ecuatorianos
¡GRACIAS POR SU ATENCIÓN!