TEST PROCEDURE
1
6
Step 1 (Preparation):
- Start test bench. Check and set actual flow (4 cm3 according to drawing no 15.TR047.DC10), adjust if
necessary.
- Maximum theoretical flow value = 41 l/min @ 1500 rpm.
- Observe for any external leak during testing.
- Check and set pressure according to drawing no 15.TR047.DC10 (250 Bar). Adjust power control
according to drawing no 15.TR047.DC10 (7.5kW @ 980rpm).
- Check for pump internal leakage at pressure setting 250 Bar (Rule of thumb = 10 % from maximum
leakage).
Step 4: (Record)
- Record all related flow and pressure and document in test report.
END OF PROCEDURE