Francisco Sánchez Molada
09/09/2013 08:35
Ángel Martínez Quesada/Abener/Abengoa@Abengoa, Emilio Balado Leal/AG/Abengoa@Abengoa,
Para
Ángel Martínez Quesada/Abener/Abengoa@Abengoa, Emilio Balado Leal/AG/Abengoa@Abengoa,
cc
bcc
Best regards
AG INGENIERIA
Campus Palmas Altas
C/ Energía Solar nª 1, Palmas Alta
Phone: +34954996771 (34596) Fax: +34955413374
francisco.sanchez@ag.abengoa.com
Eco-Tip: Printing e-mails is usually a waste.
----- Remitido por Francisco Sánchez Molada/AG/Abengoa con fecha 09/09/2013 08:34 -----
ABEINSA EPC
Rafael Muriel Muñoz
08/09/2013 11:01
2.1 HVAC system: In the 3rd and 5th paragraphs, please update the number of pumps
to the final number chosen. At this moment, it is mentioned four pumps for the
condensation pumps and others four for the primary circuit.
8.2 Operating conditions: Some values are not according to those shown in section 8.3
and in HDDs. I.e. HVAC Condensation pump suction should be 0,7 barg, HVAC
Secondary pump discharge (electrical building) should be 4,7 barg or HVAC Secondary
pump discharge (office & WTP buildings) value that should be 4,84 barg.
The documents below are approved by UDS:
ABEINSA EPC
DSW Combined Heat & Power Plant
Industrial Park Omer
Omarim 9, Omer Industrial Park, Israel
Cell: +972 543980189
rafael.murielmunoz@abeinsaepc.abengoa.com
Eco-Tip: Printing e-mails is usually a waste.