Supply, testing, adjusting, balancing, tools & spare parts as per schedules and specifications, for the following items: Double skin, air handling units, each complete with the following: Mixing box section with Primary-cleanable air filter Secondary-bag air filter section. Chilled water coil section with strainer, air vent, and drain pipe to nearest drain point. Supply air fan section. Fresh air intake section with damper All control, safety, balancing, measuring devices and accessories according to the drawings and specifications such as:
Control volume dampers, fire dampers, smoke dampers flexible connections, vibration isolators, thermostat, smoke sensor, overloads, and motorized control dampers
The Safety Critical Systems Handbook: A Straightforward Guide to Functional Safety: IEC 61508 (2010 Edition), IEC 61511 (2015 Edition) and Related Guidance