Sie sind auf Seite 1von 18

TOPOGRAFIA DE LA CUENCA

Cota Area Volumen Altura


msnm m 2
m 3
m
850 0.00 0.00 0 857.5
851 4.51 2.88 1
852 504.60 94.47 2
853 763.35 1,225.90 3
854 2,394.32 1,418.40 4
855 4,716.07 3,739.26 5
856 7,314.64 11,745.19 6
857 10,756.74 20,565.54 7
858 13,524.34 39,583.51 8
859 15,563.93 49,961.57 9
860 34,184.69 70,138.45 10
861 43,210.99 128,833.04 11
862 47,086.20 154,968.33 12
863 51,071.73 251,395.77 13
864 58,035.17 267,145.72 14
865 59,039.15 369,074.30 15
866 65,399.28 430,196.06 16
867 69,249.40 482,639.63 17
868 73,888.80 562,078.62 18
868.5 76,061.77 583,924.64 18.5
869 78,234.73 605,770.66 19
870 89,131.16 659,195.24 20
871 91,451.19 782,147.73 21
DATOS HIDROLOGICOS DE LA CUENCA
ENTRADA SALIDA
Caudal medio Precipitacion Evaporacion Demanda Evaporacion
Mes
del rios (m3/s) (mm) (mm/mes) (lt/s) (mm/dia)
1 Enero 0.195 106.400 83.7 39.600 2.7
2 Febrero 0.179 88.600 69.6 27.900 2.4
3 Marzo 0.132 77.600 65.1 36.800 2.1
4 Abril 0.057 17.400 66 41.900 2.2
5 Mayo 0.011 4.000 71.3 47.500 2.3
6 Junio 0.002 0.700 75 30.800 2.5
7 Julio 0.005 1.400 71.3 27.800 2.3
8 Agosto 0.009 2.800 80.6 31.400 2.6
9 Septiembre 0.02 5.900 75 40.800 2.5
10 Octubre 0.083 24.400 83.7 53.800 2.7
11 Novimbre 0.099 48.600 78 52.300 2.6
12 Diciembre 0.162 93.300 86.8 50.200 2.8
Dias

31
29
31
30
31
30
31
31
30
31
30
31
ESTUDIO DE SEDIMENTO
Datos de la Cuenca:
Cuenca Producción Específica de
Área de la Cuenca
de Sedimentos Años de Operación
(Km2)
Embalse (ton/año/km2)

La Victoria 337.6 50 27.7


H= 18.5 m (altura de la presa)
C= 583,924.64 m 3
(Capacidad de embalse)
1. Produccion de sedimentos:
Cantidad de sedimento que llegan al embalse = 377,077.42 m3

1.1 Factor de eficiencia de retencion del volumen de la cuenca:


1.1.1 Criterios de C. B. Brown:
�.𝑹.=𝟏𝟎𝟎[𝟏−𝟏/(𝟏+𝑲.𝟐𝟏𝟎𝟎.𝑪/𝑨)]

C= 583,924.64 m3 Capacidad total del embalse.


A= 27.7 Km2 Area de la cuenca
K= 0.1 Coeficiente para diseño 0.1

E.R.= 100.00% Eficiencia de retencion en (%)

1.1.2 Criterios de G. M. Brune:

C= 583,924.64 m3 Capacidad total del embalse.


VT= 2,508,883.20 m3 Volumen de descarga anual.
Relacion volumen del embalse / descarga anual= 0.23

E.R.= 98% Eficiencia de retencion en (%)


Caudal medio Volumen
Mes del rios medio esc. Dias
(m3/s) (m3)
Enero 0.195 522,288.00 31
Febrero 0.179 448,502.40 29
Marzo 0.132 353,548.80 31
Abril 0.057 147,744.00 30
Mayo 0.011 29,462.40 31
Junio 0.002 5,184.00 30
Julio 0.005 13,392.00 31
Agosto 0.009 24,105.60 31
Septiembre 0.02 51,840.00 30
Octubr 0.083 222,307.20 31
Novimbre 0.099 256,608.00 30
Diciembre 0.162 433,900.80 31
VT(m3)= 2,508,883.20

1.2 Factor de eficiencia de compactacion del volumen de la cuenca:


1.2.1 Criterios de Miller:
𝑾�=𝑾𝒐+𝟎.𝟒𝟑𝟒𝟑.𝑲.[(�/(�−𝟏)).𝑳�(�)−𝟏]

Wo = 1240 Kg/m3 Peso especifico inicial, al final del primer año.


K= 29 Factor de compactacion que depende del tipo de operación del vaso
N= 50 años tiempo de vida util del embalse.

WN= 1277.682 Kg/m3 Peso especifico de los sedimentos despues de N años de compactacion

Factor de reduccion del volumen por compactacion = 97.05%


1.2.1 Criterios de Lane Koelzer:

𝑾�=𝑾𝟏.𝑿𝟏+(𝑾𝟐+𝑲𝟐.𝐥𝐨𝐠⁡� ⁡)𝑿𝟐+(𝑾𝟑+𝑲𝟑.𝐥𝐨𝐠⁡� ⁡)𝑿𝟑

W1= 1490 Kg/m3 Peso especifico inicial para arena


W2= 1185 Kg/m3 Peso especifico inicial para limo
W3= 737 Kg/m 3
Peso especifico inicial para grava.
K1= 0 Constantes de compactacion para arena.
K2= 43.2 Constantes de compactacion para limo.
K3= 171.4 Constantes de compactacion para grava.
X1= 35% Porcentaje de material para arena.
X2= 60% Porcentaje de material para limo.
X3= 5% Porcentaje de material para grava.
T= 50 años Numero total de años de compactacion.

WT= 1327.95 Kg/m3

Wo= 1269.35 Kg/m3

Factor de reduccion del volumen por compactacion = 95.59%

1.3 Volumen de sedimento:

�=𝑪_𝒔𝒆𝒅.�𝑹.𝒇_𝑪

Csed= 377,077.42 m3 Cantidad de sedimento que llega al embalse.


E.R= 98% Eficiencia de retencion en (%)
fc= 95.59% Factor de reduccion del volumen por compactacion =

S= 353,229.60 m3 Volumen de sedimento que queda atrapado en el embalse.


2. Distribucion de sedimentos en el embalse.
S= 103,582.31 m3 Volumen de sedimento que queda atrapado en el embalse.

2.1. Profundidad alcanzada por los sedimentos.


Mediante interpolacion obtenemos los siguientes valores.
�=𝑨𝒐.(𝑯−𝒀𝒐)+𝑽𝒐 cumple

Yo= 6.01 m Profundidad alcanzada por los sedimentos.


Ao= 7,345.90 m 2
Factor de correccion del area.
H= 18.5 m Profundidad maxima del embalse.
Vo= 11,825.29 m3 Volumen de sedimento depositado bajo la elevacion
S= 103,582.31 m 3
Volumen de sedimento depositado.
DS= 0.00 m 3
Diferencia de volumen de sedimento, que debe ser igual a 0.

Antes del sedimento Despues de la sedimentacion


Cota Altura Area del vaso Vol. del vaso Ao S Area

msnm m m2 m3 m2 m3 m2
850 0 0.00 0.00 0.00 0.00 0.00
851 1 4.51 2.88 0.00 0.00 4.51
852 2 504.60 94.47 7,345.90 0.00 504.60
853 3 763.35 1,225.90 0.00 0.00 763.35
854 4 2,394.32 1,418.40 0.00 0.00 2,394.32
855 5 4,716.07 3,739.26 0.00 0.00 4,716.07
856 6 7,314.64 11,745.19 0.00 0.00 7,314.64
857 7 10,756.74 20,565.54 7,345.90 19,104.48 10,756.74
858 8 13,524.34 39,583.51 7,345.90 26,450.38 13,524.34
859 9 15,563.93 49,961.57 7,345.90 33,796.28 15,563.93
860 10 34,184.69 70,138.45 7,345.90 41,142.17 34,184.69
861 11 43,210.99 128,833.04 7,345.90 48,488.07 43,210.99
862 12 47,086.20 154,968.33 7,345.90 55,833.97 47,086.20
863 13 51,071.73 251,395.77 7,345.90 63,179.87 51,071.73
864 14 58,035.17 267,145.72 7,345.90 70,525.77 58,035.17
865 15 59,039.15 369,074.30 7,345.90 77,871.67 59,039.15
866 16 65,399.28 430,196.06 7,345.90 85,217.56 65,399.28
867 17 69,249.40 482,639.63 7,345.90 92,563.46 69,249.40
868 18 73,888.80 562,078.62 7,345.90 99,909.36 73,888.80
868.5 18.5 76,061.77 583,924.64 7,345.90 103,582.31 78,234.73
869 19 78,234.73 605,770.66 7,345.90 107,255.26 89,131.16
870 20 89,131.16 659,195.24 7,345.90 114,601.16 91,451.19
871 21 91,451.19 782,147.73 7,345.90 121,947.06 0.00
Peso Específico
del Sedimento
(ton/m3)

1.24
o de operación del vaso

e N años de compactacion
en el embalse.
en el embalse.

ebe ser igual a 0.

sedimentacion
Cap.

m3
0.00
2.88
94.47
1,225.90
1,418.40
3,739.26
11,745.19
20,565.54
39,583.51
49,961.57
70,138.45
128,833.04
154,968.33
251,395.77
267,145.72
369,074.30
430,196.06
482,639.63
562,078.62
605,770.66
659,195.24
782,147.73
0.00
875
Area vs Cota
COTAS

870

865

860

855

Antes de la s edimentaci on Despues de l a s edimenta ci on

850

845

840
0.00 10,000.00 20,000.00 30,000.00 40,000.00 50,000.00 60,000.00 70,000.00 80,000.00 90,000.00 100,000.00
VOLUMEN
Volumen vs Area
875

870

865

860
Cota

855

850

845

840
0.00 100,000.00 200,000.00 300,000.00 400,000.00 500,000.00 600,000.00 700,000.00 800,000.00 900,000.00

a ntes de l a se dimenta ciVolumen


on des pues de la s edi menta cion
Altura de la presa= 18.5 m
Evaporacion= 70%
Infiltracion = 10%
REGULACION DEL EMBALSE
CUENCA ENTRADA SALIDA
Mes Dia Cota Area Volumen Precipitacion Precipitacion Caudal Caudal TOTAL Evaporacion Evaporacion Infiltracion Demanda Demanda TOTAL
msnm m 2
m 3
mm m 3
m /s
3
m 3
m 3
mm/mes m 3
m 3 lt/s (m3) (m3)
Marzo 31 868.50 78,234.73 605,770.66 77.60 6,071.02 0.132 353,548.80 359,619.82 65.10 3,565.16 60,577.07 36.80 98,565.12 162,707.34
Abril 30 868.50 78,234.73 605,770.66 17.40 1,361.28 0.06 147,744.00 149,105.28 66.00 3,614.44 60,577.07 41.90 108,604.80 172,796.31
Mayo 31 868.23 75,878.25 582,079.63 4.00 303.51 0.01 29,462.40 29,765.91 71.30 3,787.08 58,207.96 47.50 127,224.00 189,219.05
Junio 30 865.88 64,611.62 422,626.50 0.70 45.23 0.00 5,184.00 5,229.23 75.00 3,392.11 42,262.65 30.80 79,833.60 125,488.36
Julio 31 864.35 58,382.10 302,367.37 1.40 81.73 0.01 13,392.00 13,473.73 71.30 2,913.85 30,236.74 27.80 74,459.52 107,610.11
Agosto 31 862.55 49,287.65 208,231.00 2.80 138.01 0.01 24,105.60 24,243.61 80.60 2,780.81 20,823.10 31.40 84,101.76 107,705.67
Septiembre 30 860.93 42,585.99 124,768.93 5.90 251.26 0.02 51,840.00 52,091.26 75.00 2,235.76 12,476.89 40.80 105,753.60 120,466.26
Octubre 31 859.32 21,500.20 56,393.93 24.40 524.60 0.08 222,307.20 222,831.80 83.70 1,259.70 5,639.39 53.80 144,097.92 150,997.01
Noviembre 30 860.99 43,118.06 128,228.73 48.60 2,095.54 0.10 256,608.00 258,703.54 78.00 2,354.25 12,822.87 52.30 135,561.60 150,738.72
Diciembre 31 862.84 50,443.39 236,193.55 93.30 4,706.37 0.16 433,900.80 438,607.17 86.80 3,064.94 23,619.35 50.20 134,455.68 161,139.98
Enero 31 867.39 71,061.10 513,660.74 106.40 7,560.90 0.20 522,288.00 529,848.90 83.70 4,163.47 51,366.07 39.60 106,064.64 161,594.18
Febrero 29 868.50 78,234.73 605,770.66 88.60 6,931.60 0.18 448,502.40 455,434.00 69.60 3,811.60 60,577.07 27.90 69,906.24 134,294.90

>
4. ALTURA DE LA PRESA.

Fletch= 2.75 Km DATOS DEL VERTEDERO


Velocidad del viento= 100 Km/Hr
Longitud del Coeficiente del Altura de la
Hm(altura media)= 7.61 m vertedero (m) vertedero presa

Asentamiento= 0.3 m 10 1.38 18.5

h1= 0.535 m

h2= 0.058 m

h3= 0.32 m

Borde Libre = 1.21 m

4.1 ALTURA TOTAL DE LA PRESA.


Hm= 18.5 m
hs= 6 m
hot= 7 m
hregulacion= 7.61 m

Hlaminacion= 1.9 m del programa


BL= 1.21 m

H total de la presa = 21.61 m


Balance FINAL
Exceso ALTURA H
Hidrico VOLUMEN COTA AREA
m3 m3 m3 msnm m2 m
196,912.47 196,912.5 605,770.66 868.50 78,234.73 18.50 3 18.50
-23,691.03 0.0 582,079.63 868.23 75,878.25 18.23 4 18.29
-159,453.13 0.0 422,626.50 865.88 64,611.62 15.88 5 16.01
-120,259.13 0.0 302,367.37 864.35 58,382.10 14.35 6 14.21
-94,136.37 0.0 208,231.00 862.55 49,287.65 12.55 7 12.56
-83,462.06 0.0 124,768.93 860.93 42,585.99 10.93 8 10.83
-68,375.00 0.0 56,393.93 859.32 21,500.20 9.32 9 8.95
71,834.79 0.0 128,228.73 860.99 43,118.06 10.99 10 10.63
107,964.82 0.0 236,193.55 862.84 50,443.39 12.84 11 12.61
277,467.19 0.0 513,660.74 867.39 71,061.10 17.39 12 17.89
368,254.72 276,144.8 605,770.66 868.50 78,234.73 18.50 1 18.50
321,139.10 321,139.1 605,770.66 868.50 78,234.73 18.50 2 18.50

> 859.32

Das könnte Ihnen auch gefallen