Beruflich Dokumente
Kultur Dokumente
NOTICE
THE DATA IN THIS PRESENTATION SHALL NOT BE DISCLOSED OUTSIDE THE GOVERNMENT AND SHALL NOT BE DUPLICATED, USED, OR DISCLOSED, IN WHOLE OR IN PART, FOR ANY
PURPOSE. THIS RESTRICTION DOES NOT LIMIT THE GOVERNMENT’S RIGHT TO USE THE INFORMATION CONTAINED IN THE DATA IF OBTAINABLE FROM ANOTHER SOURCE WITHOUT
RESTRICTION. THE DATA SUBJECT TO THIS RESTRICTION ARE CONTAINED ON SHEETS MARKED WITH THE FOLLOWING LEGEND:
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS DOCUMENT
Agenda
Space
Power Systems Propulsion
Large Commercial
P&W Canada Engines and
Aftermarket
Services
Military Engines
ERP Critical Success Factors
• Must have burning platform
• Executive involvement from top (President/CFO)
• Not an IT project - It’s about changing business process around SAP
• Tied to executive’s Incentive Compensation
• Do planning and scoping up front (before capital request)
• Vigorously compete both software and solution providers
• Integrator choice up front
• Co-locate and incentivise the ERP organization
• Don’t underestimate Change Management and site preparation
• Legacy interfaces will kill you (must have clean data)
• Manage Legacy System retirements
• Set strategy for reporting (Business Warehouse) and
execute consistently
– Karl Krapek
President – P&W
9/17/98
Bills of Material 40 1
Employee 68 1
Vendors 36 1
Etc.
Etc.
Developed incrementally
over 30+ years
Louis Chenevert
Letter to P&W Management
December 1999
Engine
Manual
IPC
CC Information C
C
UU Assembly – Development & Production Overhaul UU
SS S
S
TT
TT
OO O
O
MM
MM
EE E
E
RR
RR
Logistics
Component Production Procurement Component Repair
Program Management
SD FI
APO Sales & Financial
Accounting
Distribution
MM
CO Currently on R/3 4.5B
SAP
Controlling
Materials
PP Mgmt
Production
AA
Asset
with A&D Industry
Planning Software Accounting
Solution
QM Common PS
Quality
Mgmt Infrastructure
Project
System
Plan to upgrade to 4.7
PM WF
Plant Main-
Workflow
tenance
HR IS
Human Industry
Resources Solutions August 2004 R/3 BW APO
EH&S
Daily Transactions 3,264,521 150,845 10,028
Data Base Size 1,751GB 2,949GB 304GB
2000 10/2002
Common
Common Metrics
Metrics
And
And Reporting
Reporting (wInsight)
(wInsight)
Multiple:
Multiple:
•• Tools
Tools
•• Processes
Processes
•• Metrics
Metrics
•• EV
EV for
for ME
ME only
only
ERP Program ERP
ERP
EVMS
EVMS CE
CE Program
Program ME
ME Program
Program
Management Data Data Implemented!
Implemented!
Organization
Organization Data Data
project begins
Formed
Formed Single
Single tool
tool
Common
Common Process
Process
Real-time
Real-time Data
Data
EV
EV for
for CE
CE and
and ME
ME
Systems/ EVMS
ACE Training Program
Surveillance Analyst
Take
Take Action
Action
and
and
Modify
Modify Plan
Plan
Establish
Establish Analyze
Analyze
Develop
Develop Close
Close
Baseline
Baseline and
and
Proposal
Proposal Project
Project
(Plan)
(Plan) Report
Report
Authorize
Authorize Monitor
Monitor
Work
Work Project
Project
(Execute)
(Execute) (Status)
(Status)
SAP PS EVC
CPR Reporting
WBS/Network
Structures
in SAP PS
Resource EV
Rqmts by Program
Program Measurement Baseline wInsight
SAP
Controlling
Materials
PP Mgmt AA
• All program management data Production
Planning Software
Asset
Accounting
Workflow
NetWork Activities
•Schedule (constraints, durations,
relationships) Activity Elements
•Resource Plan/Actuals
•EV method and status
– Work Center Hours and dollars
– Milestone, Percent Complete, – Hardware (direct mat’l) plans
0 -100, Level of Effort (LOE) – Other costs plans and actuals
– Integration with PO and
•Integration with PM, SM orders
PP orders
•Earned Value metrics
PRATT & WHITNEY PROPRIETARY
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS DOCUMENT 24
EVMS Month End Processing
Majority of EVMS data is the result of real-time transactions
However,
EVMS Month-end closing is executed by the IT team in background as
part of the Financial closing.
Run
Run EVC
EVC for
for
Calculate
Calculate EV
EV Apply
Apply Calculate
Calculate Summarization
Summarization wInsight
wInsight
(CNE2)
(CNE2) Overhead
Overhead ETC/EAC
ETC/EAC and
and Inheritance
Inheritance Extract
Extract
RA/
RA/ Assessments
Assessments Billing
Billing
Settlement
Settlement
CIPT Activities
• Analyze Data
wInsight • Variance Analysis
database
available • Risk Assessments
to CIPT’s • Closure Plan
SAP
wInsight Bull’s Eye
Pratt & Whitney Aircraft NA OTHER OTHER
Element: $HD Bull's-eye Chart - As of: SEP 02 Name:
BEHIND
AHEADSCHEDULE,
OF SCHEDULE,
UNDER
UNDER
COSTCOST
40
30
10
78
6
0 5
4 0
2 1
3
-10
-20
-30
-40
BEHIND
AHEAD
SCHEDULE,
OF SCHEDULE,
OVER COST
OVER COST
Manpower Plans
Workscope Changes Engineering Requirements Firm Through 2003
2001 - 2003 Requirements
7000
Plan 6000
M f g S up p o rt , IDWA s , Ot he rt
Staffing Requirements
5000 A f t e rmarke t
Revisions
P o w e r S ys t e ms r
V2 5 0 0 Co s t R e duc tio n
4000 GP 7 0 0 0
P W6 0 0 0
2000 External
JS F 50% Contract
(Revenue)
F 119
1000
EAC Changes 0
S pa c e
5000
4000
EAC EA VAC
3000 C
• Approved EAC Changes
2000
Baseline • All changes documented
1000
Actual Costs
Plan
0
Earned Value • Must be consistent with funding levels
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Plan
Earned Value
$300k
$250k
$200k
DATE July 20, 2001
People
Mod Center
Actuals $150k Overall
IPMT
IPMT EVMS Program Engrg
Engrg Product
Product
Analyst Director
Director Director
Director
Business
Business
CIPT
CIPT Center
Center
CIPT
CIPT
EVMS CIPT
Analyst
IPT
IPT
IPT
IPT
Take
Take Action
Action e-CSVAR
and
and (Cost/Schedule
Modify
Modify Plan
Plan Variance)
Establish
Establish Analyze
Analyze
Develop
Develop Close
Close
Baseline
Baseline and
and
Proposal
Proposal Project
Project
(Plan)
(Plan) Report
Report
Authorize
Authorize Monitor
Monitor
Work
Work Project
Project
(Execute)
(Execute) (Status)
(Status)
268 Commercial
1768 Projects 1312 Military
188 Space
Zero
1,010,696 WBS elements
61,824 Networks
1,263,818 Activities/Elements
809,860 Assigned Orders
9 Change Control
9 Reporting
9 EVMS Standard Work
Services
BW Reporting
Actual $ when invoiced (particularly staffing)
System
Description
Standard
Policies & Work
Procedures
Program Specific
PMI’s
FROM
FROM TO
TO
Roles
Roles and
and Responsibilities
Responsibilities •• Inconsistent
Inconsistent •• Consistent
Consistent with
with IPD
IPD
Ownership
Ownership of
of Process,
Process, Metrics,
Metrics, •• Multiple
Multiple •• Central
Central EVMS
EVMS Organization
Organization
Systems
Systems and
and Tools
Tools
Metrics
Metrics •• Multiple
Multiple •• Common
Common
Process
Process and
and Documentation
Documentation •• Separate
Separate •• Single
Single
Resource
Resource Plans
Plans •• Multiple
Multiple Sources
Sources •• Based
Based on
on Standard
Standard Work
Work
Cost
Cost and
and Schedule
Schedule Systems
Systems •• Multiple
Multiple •• Single
Single
Source
Source of
of Management
Management •• Multiple
Multiple •• SAP
SAP wInsight
wInsight
Data/Reports
Data/Reports
Lessons-Learned
•The user interface matters – What is acceptable for working with a
small amount of data may not be acceptable when working with
large projects.
• Test system performance early…
Thank you!
PRATT & WHITNEY PROPRIETARY
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS DOCUMENT 39
PRATT & WHITNEY PROPRIETARY
USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET IS SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS DOCUMENT 40