Sie sind auf Seite 1von 10

TASK CARD

T00E45P3

Work Order No: WO - 107206592 Fleet: A320-FAM Effective Code: 351 MSN: 5929 Tail Number: CC-BFU

WP Line Number: 12

Work Location: LIM/LINE (Line Maintenance) Organization: CMAE DGAC N° 154

Task Number/Name: T00E45P3 - MD-A320FAM-34-A2005-03GRUPO2(JIC) (LOADING NAVIGATION DATA BASE IN FLIGHT


MANAGEMENT SYSTEM)

Component Part Number: --- References: MD-A320FAM-34-A2005

Inventory: 34-00-00 - NAVIGATION - GENERAL Parent Assembly: A320-200 - CC-BFU

Total Positions on Aircraft:

Task Description: --This EO was issued in order to control the uploading of the NDB in FMS (Flight Management System) of the
aircraft. --The Databases of Navigation are updated every 28 days, but it can be loaded when data is available,
which normally happens 6 days before its expiration. After due date, these items would become to MEL. --The
accomplishment of this E.O. is a requirement for CAT II/III, RNAV, RNP and RVSM. --This E.O Includes the
Navigation Data Base (NDB) loading procedure using PDL (Portable Data Loader), ADL (Airborne Data Loader) (if
installed), Cross load in other A319/A320/A321 aircrafts due to ADL and/or PDL failure.

Zones: --- Panels: ---

Task Instructions: Do E.O. MD-A320FAM-34-A2005 Rev. 03 Conditions: ---

ETOPS Significant:

Engineering Notes: ---

Tools Request
Tools Description Tools PN

P2K-615A-05-UNK (KIT DATA LOAD PMAT 2000) P2K-615A-05

Part Request Details


Description Part Number Qty Mandatory (Yes/No) Barcode(Part Number)

Printed Date: 10/09/2018 Form TC-001 Rev 02 Page: 1 de 2


T00E45P3

Parts On/Off
Description Qty PN Off SN Off Rem. Reason PN On SN On

Actions Taken: ---

Signatures
Skill Man Hours Performed By Signature Date

A320AVIC

Job Card Steps :

Order Description Signed By (Status) Notes


1 Do E.O. MD-A320FAM-34-A2005 Rev. 03

Remarks:

Step and Comments Authorized Deviation References Engineering Mechanic Inspector


(application must be signed here) Approval License Nº & License Nº &
Signature Signature Signature

Printed Date: 10/09/2018 Form TC-001 Rev 02 Page: 2 de 2


NAVDB ID APPLICABLE CICLE
YEAR CICLE EFFECTIVE DATE YEAR CICLE EFFECTIVE DATE
START END START END
2015 1501 8-Jan-15 5-Feb-15 2016 1601 7-Jan-16 4-Feb-16
2015 1502 5-Feb-15 5-Mar-15 2016 1602 4-Feb-16 3-Mar-16
2015 1503 5-Mar-15 2-Apr-15 2016 1603 3-Mar-16 31-Mar-16
2015 1504 2-Apr-15 30-Apr-15 2016 1604 31-Mar-16 28-Apr-16
2015 1505 30-Apr-15 28-May-15 2016 1605 28-Apr-16 26-May-16
2015 1506 28-May-15 25-Jun-15 2016 1606 26-May-16 23-Jun-16
2015 1507 25-Jun-15 23-Jul-15 2016 1607 23-Jun-16 21-Jul-16
2015 1508 23-Jul-15 20-Aug-15 2016 1608 21-Jul-16 18-Aug-16
2015 1509 20-Aug-15 17-Sep-15 2016 1609 18-Aug-16 15-Sep-16
2015 1510 17-Sep-15 15-Oct-15 2016 1610 15-Sep-16 13-Oct-16
2015 1511 15-Oct-15 12-Nov-15 2016 1611 13-Oct-16 10-Nov-16
2015 1512 12-Nov-15 10-Dec-15 2016 1612 10-Nov-16 8-Dec-16
2015 1513 10-Dec-15 7-Jan-16 2016 1613 8-Dec-16 5-Jan-17

YEAR CICLE EFFECTIVE DATE YEAR CICLE EFFECTIVE DATE


START END START END
2017 1701 5-Jan-17 2-Feb-17 2018 1801 4-Jan-18 1-Feb-18
2017 1702 2-Feb-17 2-Mar-17 2018 1802 1-Feb-18 1-Mar-18
2017 1703 2-Mar-17 30-Mar-17 2018 1803 1-Mar-18 29-Mar-18
2017 1704 30-Mar-17 27-Apr-17 2018 1804 29-Mar-18 26-Apr-18
2017 1705 27-Apr-17 25-May-17 2018 1805 26-Apr-18 24-May-18
2017 1706 25-May-17 22-Jun-17 2018 1806 24-May-18 21-Jun-18
2017 1707 22-Jun-17 20-Jul-17 2018 1807 21-Jun-18 19-Jul-18
2017 1708 20-Jul-17 17-Aug-17 2018 1808 19-Jul-18 16-Aug-18
2017 1709 17-Aug-17 14-Sep-17 2018 1809 16-Aug-18 13-Sep-18
2017 1710 14-Sep-17 12-Oct-17 2018 1810 13-Sep-18 11-Oct-18
2017 1711 12-Oct-17 9-Nov-17 2018 1811 11-Oct-18 8-Nov-18
2017 1712 9-Nov-17 7-Dec-17 2018 1812 8-Nov-18 6-Dec-18
2017 1713 7-Dec-17 0-Jan-00 2018 1813 6-Dec-18 3-Jan-19

Caution : The NDB to install must have correlative for the next cycle, taking special care in the year and
cycle changes according to the effective date.
PRECAUCION: El NDB a instalar debe tener el correlativo para el siguiente ciclo, teniendo especial cuidado
en los cambios de año y ciclo de acuerdo a las fecha de efectividad.
Note: The new NDB will be available not earlier than 10 days from the start effective date.
Nota: La nueva NDB estara disponible no antes de 10 dias de la fecha de inicio de efectividad.

07-04-2016
ADS 2015-2018
Document N° Aircraft Reg.
34-A2005
Bar Code
Doc. Rev. Date

18-Apr-2017 ENGINEERING ORDER Page 1 of 5

ACCOMPLISHMENT INSTRUCTIONS 
 
GENERAL INFORMATION 
 
WARNING:  ALWAYS  BE  SURE  TO  OBEY  ALL  THE  WARNINGS  AND  THE  CAUTIONS  INCLUDED  IN  THE 
ENGINEERING  ORDER.  WHEN  YOU  PERFORM  MAINTENANCE  WORK,  REPAIRS  OR 
MODIFICATIONS,  ALWAYS  KEEP  ELECTRICAL  WIRING,  COMPONENTS  AND  THE  WORK 
AREA FREE OF EXTERNAL ELEMENTS. 
NOTE: The general architecture of Flight Management System for A319/A320/A321 fleet has two FM 
incorporated  in  the  FMGCs  (Flight  Management  Guidance  Computer),  associated  with  this 
system  are  the  MCDUs  (Multipurpose  Control  and  Display  Unit)  and  the  DMCs  (Display 
Management Computer). 
 
This EO can be accomplished in 5 different ways according to aircraft condition and available tools. 
Accomplish the step applicable to selected configuration and mark others as NA (Not applicable) 
 
ALTERNATIVE A: Step 3, Using MDDU 
ALTERNATIVE B: Step 4, Cross loading from opposite FMGC 
ALTERNATIVE C: Step 5, Software loading using an std PDL 
ALTERNATIVE D: Step 6, Removing FMGCs and installing on other aircraft for software load 
ALTERNATIVE E: Step 7, Software loading using PMAT 2000 
1. Verify NDB is applicable to the aircraft see table, the load to FMGC must be one of the following 
procedures (step). 
 
CAUTION:  The  NAV  DB    to  install  must  have    correlative    for    the    next    cycle,  following    the 
attachment    ADS    2015‐2018,  and      taking      special    care    in    the    year      and    cycle    changes 
according to the effective date. IF THE ACTUAL NAV  DB  INSTALLED  IN  AIRCRAFT  IS THE  SAME  
P/N  OF  AVAILABLE, INFORM  TO  PLANNIFICATION  TO  REMOVE THIS ENGINEERING ORDER OF 
THE WORK PACKAGE. 
 
NOTE 1:Discs with the NDB applicable to the airplane must be requested in the areas assigned for 
this  purpose.  Maintenance  Base  for  Santiago,  these  must  be  requested  in  DCM  area.  In  case  of 
any problems, request support area of the DSO. For the affiliate, the discs must be required in the 
area of engineering or planning or other assigned area. 
 
NOTE 2: The Part Number NAV DB is composed as follow: 
DBV‐CCCC‐RRR 
Where: 
DB: Code DB may be LA(LAN) or JJ(TAM) 
V: Version, depends of aircraft equipment (FMC) 
CCCC: Cycle of NAV DB, see document ADS 2015‐2018 
RRR: Revision of NAV DB, must be the major number available. 
Note: The NAV DB must be for the next cycle according to attached document ADS 2015‐2018 
PARTIAL SIGN OFF STATUS:
Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Document N° Aircraft Reg.
34-A2005
Bar Code
Doc. Rev. Date

18-Apr-2017 ENGINEERING ORDER Page 3 of 5

2. Select alternative according to aircraft condition and available tools, and mark respective check 
box. 
SELECT ALTERNATIVE: 
 
 ALTERNATIVE A: Step 3, Using MDDU 
 ALTERNATIVE B: Step 4, Crossloading from opposite FMGC 
 ALTERNATIVE C: Step 5, Software loading using a std PDL 
 ALTERNATIVE D: Step 6, Removing FMGCs and installing on other aircraft for software load 
 ALTERNATIVE E: Step 7, Software loading using PMAT 2000 
 
 
  Accomplished By 
   
 

ALTERNATIVE A: 
 

3. NDB Load procedure through MDDU (Multipurpose Data Drive Unit). Refer to AMM Task 22‐70‐
00‐XXX‐XXX‐X (Uploading of the FM Data). 
 
NOTE:  If MDDU is not operative or disks are not available you can remove the MDDU iaw AMM 31‐38‐22‐ 
000‐001, connect PMAT using harness PN 31530‐2, PN 80955‐1 and load software according to step 
6.  After  software  load,  disconnect  harneses  and  install  the  MDDU  to  its  housing,  according  to  Task 
AMM 31‐38‐22‐400‐001  

NOTE:  For aircraft PR‐MBG connect the PMAT using harness P/N 704‐1823‐001, P/N 80955‐1 and load 
software according to step 7. 
 

Accomplished By 
 

ALTERNATIVE B: 
 
4. Cross  Load  procedure,  from  one  FMGC  to  another  (it  is  necessary  at  least  one  FMGC  with  the 
software  previously  loaded).  Refer  to  AMM  Task  22‐70‐00‐XXX‐XXX‐X  (Crossloading  of  the  FM 
Data). 
 
 

Accomplished By 
 

PARTIAL SIGN OFF STATUS:


Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Document N° Aircraft Reg.
34-A2005
Bar Code
Doc. Rev. Date

18-Apr-2017 ENGINEERING ORDER Page 4 of 5

ALTERNATIVE C: 
 

5. NDB  Loading  procedure  on  both  FMGC,  by  separated,  through  PDL.  Refer  to  AMM  Task  22‐70‐
XXX‐XXX‐X (Uploading of the FM Data with Portable Data Loader). 
 
 

Accomplished By 
 

ALTERNATIVE D: 
6. Remove both FMGEC and install it in another A319 o A320 o A321 aircraft. Refer to AMM Task 
22‐83‐34  PB  401  (Removal/Installation).,  then  perform  the  load  of  NDB  with  some  of  the 
procedure indicated in step 4, 2 or 3. Return the units to the original aircraft. 
 
CAUTION:  BEFORE  INSTALLING  THE  UNITS  ON  ANOTHER  AIRCRAFT  MUST  BE  VERIFY  THAT  THE  P/N 
SOFTWARS  AND  FMGEC  UNIT  ARE  EQUAL  BETWEEN  AIRCRAFT,  ANY  DIFFERENCE  MIGHT 
CAUSE PROBLEMS ON THE AIRCRAFT INVOLVED. 
 
 

Accomplished By 
 

ALTERNATIVE E: 
7. Use PMAT 2000 to load NDB. For this effect refer to indicated in the manual User Guide of PMAT 
2000 attached to this JIC (NO PINTABLE). 
 
Accomplished By 
 
 
 
 
 
 
 

8. Record the part number of the Nav Data used in software loading. 
 
 
P/N______________________________  Accomplished By 
 
 

PARTIAL SIGN OFF STATUS:


Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Document N° Aircraft Reg.
34-A2005
Bar Code
Doc. Rev. Date

18-Apr-2017 ENGINEERING ORDER Page 5 of 5

9. Register the effectivity date of the NDB. 
 
 
__________  /___________  /_________  Accomplished By 
Day  Month  Year   
 

10. Verify for general condition, cleanliness and presence of foreign objects in the concern work area. 
Close all opened access  
 

Accomplished By 
 

PARTIAL SIGN OFF STATUS:


Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________
Step: _______________ Completed through: ____________________________ Emp #:_____________ MH___________

Das könnte Ihnen auch gefallen