0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
126 Ansichten1 Seite
This document contains an enquiry data sheet for an air preheater replacement or retrofit project. It requests general plant information as well as details on furnace design, fuel characteristics, combustion parameters, stack configuration, pressure and temperature measurements, and specifications of existing equipment including the furnace, fans, and air preheaters. The level of detail requested will allow for the evaluation and selection of appropriate replacement equipment.
This document contains an enquiry data sheet for an air preheater replacement or retrofit project. It requests general plant information as well as details on furnace design, fuel characteristics, combustion parameters, stack configuration, pressure and temperature measurements, and specifications of existing equipment including the furnace, fans, and air preheaters. The level of detail requested will allow for the evaluation and selection of appropriate replacement equipment.
This document contains an enquiry data sheet for an air preheater replacement or retrofit project. It requests general plant information as well as details on furnace design, fuel characteristics, combustion parameters, stack configuration, pressure and temperature measurements, and specifications of existing equipment including the furnace, fans, and air preheaters. The level of detail requested will allow for the evaluation and selection of appropriate replacement equipment.
9180 Oakhurst Road Suite 4 Seminole, Florida 33776 Phone: +1 727-392-0492 E-Mail: olivier.brasseur@bdheat.com Enquiry Data Sheet forAir Preheater Replacement or Retrofit General data Plant name: Furnace type (CDU, VDU, etc…) Plant location: Furnace number: Ambient conditons Averge Air temp. °C Min. Winter temp. °C Draft type (please "x") natural draft balanced draft forced draft Design duty of furnace MW Gcal/hr Typical fuel Heavy Oil consumption kg/hr light Oil consumption kg/hr LHV kJ/kg LHV kJ/kg Gas consumption Nm3/hr Methane Vol. % Average Hydrosulfide ppm Ethane Vol. % max. Hydrosulfide ppm Propane Vol. % Peak Hydrosulfide ppm Butane Vol. % Sulfur Vol. % Pentane Vol. % Argon Vol. % Hexane Vol. % Water Vol. % Carbondioxide Vol. % Carbonmonoxide Vol. % Nitrogen Vol. % Acetylen Vol. % Hydrogen Vol. % Ethene / Ethylen Vol. % Ammonia Vol. % Propen / Propylen Vol. % Combustion Excess air in furnace - O2 content before entrance to existing APH, or leaving convection section Vol. %, dry O2 content after APH or at stack Vol. %, dry Number of burners - Type of burners Stack Height of Stack m Fluegas temp. at stack °C NOx emission at stack mg/Nm3, dry max. NOx emission limit mg/Nm3, dry Number of furnaces connected to the stack Pressure Flue gas pressure before APH or leaving convection section mbar or inWC Flue gas pressure before ID-Fan mbar or InWC Air Pressure after FD-Fan mbar or InWC Air Pressure after existing Air Preheater mbar or InWC Air Pressure before burners mbar or InWC Temperatures normal °C Flue gas temp. before APH (or leaving convection section) min. °C max. °C Flue gas temperature before ID-Fan normal °C Air temperature after Air preheater normal °C Air temperature to burner normal °C Existing equipment Furnace please send furnace data sheet + GA-Drawing FD-Fan please send Fan curve ID-Fan please send Fan curve Existing Air Preheater please send data sheet Existing Air Pre-Preheater (for example coil) please send data sheet + GA-Drawing