PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 57 dari 76


DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
BY1
5 tulangan atas 3.8 25 35 19.81 0.0050 0.0050 0.0052 4.02 4.42 2 - D 16 3.81 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.7 25 35 8.70 0.0021 0.0033 0.0052 4.02 4.42 2 - D 16 1.30 4.77 D 10 @ 200
tengah bentang

6 tulangan atas 4.0 25 35 20.95 0.0053 0.0053 0.0078 6.03 6.42 3 - D 16 3.91 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.6 25 35 8.44 0.0021 0.0033 0.0052 4.02 4.42 2 - D 16 0.72 4.77 D 10 @ 200
tengah bentang

116 tulangan atas 2.4 25 35 12.56 0.0031 0.0033 0.0052 4.02 4.42 2 - D 16 1.32 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.3 25 35 6.57 0.0016 0.0033 0.0052 4.02 4.42 2 - D 16 3.04 4.77 D 10 @ 200
tengah bentang

117 tulangan atas 0.8 25 35 3.91 0.0009 0.0033 0.0052 4.02 4.42 2 - D 16 1.47 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.2 25 35 1.09 0.0003 0.0033 0.0052 4.02 4.42 2 - D 16 0.78 4.77 D 10 @ 200
tengah bentang

118 tulangan atas 2.1 25 35 11.10 0.0027 0.0033 0.0052 4.02 4.42 2 - D 16 2.89 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.2 25 35 6.10 0.0015 0.0033 0.0052 4.02 4.42 2 - D 16 1.47 4.77 D 10 @ 200
tengah bentang

166 tulangan atas 2.4 25 35 12.30 0.0030 0.0033 0.0052 4.02 4.42 2 - D 16 1.34 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.3 25 35 6.52 0.0016 0.0033 0.0052 4.02 4.42 2 - D 16 3.02 4.77 D 10 @ 200
tengah bentang

167 tulangan atas 1.4 25 35 7.14 0.0017 0.0033 0.0052 4.02 4.42 2 - D 16 1.56 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.2 25 35 0.94 0.0002 0.0033 0.0052 4.02 4.42 2 - D 16 1.91 4.77 D 10 @ 200
tengah bentang

168 tulangan atas 2.2 25 35 11.42 0.0028 0.0033 0.0052 4.02 4.42 2 - D 16 2.92 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.2 25 35 6.15 0.0015 0.0033 0.0052 4.02 4.42 2 - D 16 1.44 4.77 D 10 @ 200
tengah bentang

268 tulangan atas 1.4 25 35 7.40 0.0018 0.0033 0.0052 4.02 4.42 2 - D 16 0.10 4.77 D 10 @ 125
tumpuan
tulangan bawah- 0.0 25 35 0.16 0.0000 0.0033 0.0052 4.02 4.42 2 - D 16 1.95 4.77 D 10 @ 125
tengah bentang

1487 tulangan atas 3.2 25 35 16.68 0.0042 0.0042 0.0052 4.02 4.42 2 - D 16 3.60 4.77 D 10 @ 125
tumpuan
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 58 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tulangan bawah- -0.6 25 35 3.08 0.0007 0.0033 0.0052 4.02 4.42 2 - D 16 1.11 4.77 D 10 @ 200
tengah bentang

1488 tulangan atas 3.7 25 35 19.39 0.0049 0.0049 0.0052 4.02 4.42 2 - D 16 3.90 4.77 D 10 @ 125
tumpuan
tulangan bawah- 0.0 25 35 0.10 0.0000 0.0033 0.0052 4.02 4.42 2 - D 16 1.62 4.77 D 10 @ 125
tengah bentang

1498 tulangan atas -0.9 25 35 4.64 0.0011 0.0033 0.0052 4.02 4.42 2 - D 16 2.08 4.77 D 10 @ 200
tumpuan
tulangan bawah- -3.0 25 35 15.53 0.0039 0.0039 0.0052 4.02 4.42 2 - D 16 0.35 4.77 D 10 @ 200
tengah bentang

1499 tulangan atas -0.2 25 35 0.94 0.0002 0.0033 0.0052 4.02 4.42 2 - D 16 0.22 4.77 D 10 @ 200
tumpuan
tulangan bawah- -3.0 25 35 15.53 0.0039 0.0039 0.0052 4.02 4.42 2 - D 16 2.49 4.77 D 10 @ 200
tengah bentang

1500 tulangan atas 6.0 25 35 31.43 0.0083 0.0083 0.0104 8.04 8.27 4 - D 16 2.26 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.7 25 35 3.60 0.0009 0.0033 0.0052 4.02 4.42 2 - D 16 5.24 4.77 D 10 @ 200
tengah bentang

1501 tulangan atas -0.4 25 35 2.09 0.0005 0.0033 0.0052 4.02 4.42 2 - D 16 1.78 4.77 D 10 @ 200
tumpuan
tulangan bawah- -1.8 25 35 9.23 0.0023 0.0033 0.0052 4.02 4.42 2 - D 16 0.23 4.77 D 10 @ 200
tengah bentang

1514 tulangan atas 0.2 25 35 0.94 0.0002 0.0033 0.0052 4.02 4.42 2 - D 16 2.18 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.8 25 35 9.23 0.0023 0.0033 0.0052 4.02 4.42 2 - D 16 0.10 4.77 D 10 @ 200
tengah bentang

1515 tulangan atas 2.3 25 35 12.04 0.0030 0.0033 0.0052 4.02 4.42 2 - D 16 0.68 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.0 25 35 5.37 0.0013 0.0033 0.0052 4.02 4.42 2 - D 16 3.19 4.77 D 10 @ 200
tengah bentang

1516 tulangan atas 3.6 25 35 18.82 0.0047 0.0047 0.0052 4.02 4.42 2 - D 16 2.55 4.77 D 10 @ 125
tumpuan
tulangan bawah- 1.2 25 35 6.15 0.0015 0.0033 0.0052 4.02 4.42 2 - D 16 3.94 4.77 D 10 @ 125
tengah bentang

1522 tulangan atas 1.0 25 35 5.21 0.0013 0.0033 0.0052 4.02 4.42 2 - D 16 1.11 4.77 D 10 @ 125
tumpuan
tulangan bawah- -1.0 25 35 5.37 0.0013 0.0033 0.0052 4.02 4.42 2 - D 16 0.14 4.77 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 59 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
1523 tulangan atas 2.6 25 35 13.71 0.0034 0.0034 0.0052 4.02 4.42 2 - D 16 1.18 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.7 25 35 3.39 0.0008 0.0033 0.0052 4.02 4.42 2 - D 16 0.13 4.77 D 10 @ 200
tengah bentang

1524 tulangan atas 1.1 25 35 5.58 0.0013 0.0033 0.0052 4.02 4.42 2 - D 16 1.27 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.6 25 35 3.18 0.0008 0.0033 0.0052 4.02 4.42 2 - D 16 0.60 4.77 D 10 @ 200
tengah bentang

1525 tulangan atas 2.2 25 35 11.26 0.0028 0.0033 0.0052 4.02 4.42 2 - D 16 1.73 4.77 D 10 @ 125
tumpuan
tulangan bawah- 0.1 25 35 0.42 0.0001 0.0033 0.0052 4.02 4.42 2 - D 16 1.14 4.77 D 10 @ 125
tengah bentang
BY2
11 tulangan atas 1.5 25 35 8.03 0.0020 0.0033 0.0052 4.02 4.42 2 - D 16 1.02 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.3 25 35 1.41 0.0003 0.0033 0.0052 4.02 4.42 2 - D 16 0.87 4.77 D 10 @ 200
tengah bentang

12 tulangan atas 0.8 25 35 3.96 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.41 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.8 25 35 4.01 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.84 4.77 D 10 @ 200
tengah bentang

17 tulangan atas 1.5 25 35 7.92 0.0019 0.0033 0.0052 4.02 4.42 2 - D 16 1.01 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.3 25 35 1.41 0.0003 0.0033 0.0052 4.02 4.42 2 - D 16 0.88 4.77 D 10 @ 200
tengah bentang

18 tulangan atas 0.8 25 35 4.01 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.43 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.8 25 35 4.01 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.84 4.77 D 10 @ 200
tengah bentang

40 tulangan atas 0.7 25 35 3.54 0.0009 0.0033 0.0052 4.02 4.42 2 - D 16 1.55 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.7 25 35 13.81 0.0034 0.0034 0.0052 4.02 4.42 2 - D 16 0.21 4.77 D 10 @ 200
tengah bentang

41 tulangan atas 0.7 25 35 3.54 0.0009 0.0033 0.0052 4.02 4.42 2 - D 16 1.55 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.6 25 35 13.76 0.0034 0.0034 0.0052 4.02 4.42 2 - D 16 0.21 4.77 D 10 @ 200
tengah bentang

564 tulangan atas 2.7 25 35 14.18 0.0035 0.0035 0.0052 4.02 4.42 2 - D 16 0.93 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.7 25 35 13.81 0.0034 0.0034 0.0052 4.02 4.42 2 - D 16 2.13 4.77 D 10 @ 200
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 60 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tengah bentang

565 tulangan atas 2.7 25 35 14.23 0.0035 0.0035 0.0052 4.02 4.42 2 - D 16 0.94 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.6 25 35 13.76 0.0034 0.0034 0.0052 4.02 4.42 2 - D 16 2.12 4.77 D 10 @ 200
tengah bentang

1112 tulangan atas 1.8 25 35 9.33 0.0023 0.0033 0.0052 4.02 4.42 2 - D 16 0.50 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.5 25 35 2.76 0.0007 0.0033 0.0052 4.02 4.42 2 - D 16 1.10 4.77 D 10 @ 200
tengah bentang

1113 tulangan atas 1.8 25 35 9.43 0.0023 0.0033 0.0052 4.02 4.42 2 - D 16 0.50 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.6 25 35 2.97 0.0007 0.0033 0.0052 4.02 4.42 2 - D 16 1.13 4.77 D 10 @ 200
tengah bentang

1171 tulangan atas 1.4 25 35 7.04 0.0017 0.0033 0.0052 4.02 4.42 2 - D 16 0.73 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.6 25 35 3.28 0.0008 0.0033 0.0052 4.02 4.42 2 - D 16 0.93 4.77 D 10 @ 200
tengah bentang

1172 tulangan atas 1.4 25 35 7.14 0.0017 0.0033 0.0052 4.02 4.42 2 - D 16 0.73 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.7 25 35 3.39 0.0008 0.0033 0.0052 4.02 4.42 2 - D 16 0.94 4.77 D 10 @ 200
tengah bentang
BY3
119 tulangan atas 1.4 20 30 13.38 0.0033 0.0033 0.0077 4.02 3.59 2 - D 16 0.87 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.2 20 30 1.80 0.0004 0.0033 0.0077 4.02 3.59 2 - D 16 0.06 3.16 D 10 @ 200
tengah bentang

120 tulangan atas 0.0 20 30 0.28 0.0001 0.0033 0.0077 4.02 3.59 2 - D 16 0.14 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.1 20 30 10.34 0.0025 0.0033 0.0077 4.02 3.59 2 - D 16 0.62 3.16 D 10 @ 200
tengah bentang

121 tulangan atas 1.2 20 30 11.29 0.0028 0.0033 0.0077 4.02 3.59 2 - D 16 0.81 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.2 20 30 2.28 0.0005 0.0033 0.0077 4.02 3.59 2 - D 16 0.16 3.16 D 10 @ 200
tengah bentang

122 tulangan atas 0.0 20 30 0.00 0.0000 0.0033 0.0077 4.02 3.59 2 - D 16 0.25 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.0 20 30 9.11 0.0022 0.0033 0.0077 4.02 3.59 2 - D 16 0.57 3.16 D 10 @ 200
tengah bentang

123 tulangan atas 1.2 20 30 11.57 0.0029 0.0033 0.0077 4.02 3.59 2 - D 16 1.06 3.16 D 10 @ 125
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 61 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tumpuan
tulangan bawah- -1.0 20 30 9.87 0.0024 0.0033 0.0077 4.02 3.59 2 - D 16 0.08 3.16 D 10 @ 200
tengah bentang

124 tulangan atas 0.9 20 30 8.73 0.0021 0.0033 0.0077 4.02 3.59 2 - D 16 1.49 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.5 20 30 4.55 0.0011 0.0033 0.0077 4.02 3.59 2 - D 16 0.07 3.16 D 10 @ 200
tengah bentang

125 tulangan atas 1.2 20 30 11.76 0.0029 0.0033 0.0077 4.02 3.59 2 - D 16 1.30 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.0 20 30 9.01 0.0022 0.0033 0.0077 4.02 3.59 2 - D 16 0.40 3.16 D 10 @ 200
tengah bentang

169 tulangan atas 1.4 20 30 13.28 0.0033 0.0033 0.0077 4.02 3.59 2 - D 16 0.85 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.4 20 30 3.60 0.0009 0.0033 0.0077 4.02 3.59 2 - D 16 0.53 3.16 D 10 @ 200
tengah bentang

170 tulangan atas 2.2 20 30 20.87 0.0053 0.0053 0.0077 4.02 3.59 2 - D 16 0.14 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.2 20 30 11.38 0.0028 0.0033 0.0077 4.02 3.59 2 - D 16 1.06 3.16 D 10 @ 200
tengah bentang

171 tulangan atas 1.5 20 30 14.42 0.0036 0.0036 0.0077 4.02 3.59 2 - D 16 0.88 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.4 20 30 3.89 0.0009 0.0033 0.0077 4.02 3.59 2 - D 16 0.59 3.16 D 10 @ 200
tengah bentang

172 tulangan atas 2.5 20 30 24.10 0.0062 0.0062 0.0077 4.02 3.59 2 - D 16 0.11 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.5 20 30 13.76 0.0034 0.0034 0.0077 4.02 3.59 2 - D 16 1.18 3.16 D 10 @ 200
tengah bentang

173 tulangan atas 1.5 20 30 14.42 0.0036 0.0036 0.0077 4.02 3.59 2 - D 16 0.88 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.4 20 30 3.89 0.0009 0.0033 0.0077 4.02 3.59 2 - D 16 0.57 3.16 D 10 @ 200
tengah bentang

174 tulangan atas 2.5 20 30 23.72 0.0061 0.0061 0.0077 4.02 3.59 2 - D 16 0.11 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.4 20 30 13.38 0.0033 0.0033 0.0077 4.02 3.59 2 - D 16 1.16 3.16 D 10 @ 200
tengah bentang

203 tulangan atas 1.3 20 30 11.95 0.0029 0.0033 0.0077 4.02 3.59 2 - D 16 0.79 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 2.75 0.0007 0.0033 0.0077 4.02 3.59 2 - D 16 0.52 3.16 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 62 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )

204 tulangan atas 2.1 20 30 19.92 0.0050 0.0050 0.0077 4.02 3.59 2 - D 16 0.17 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.1 20 30 10.43 0.0026 0.0033 0.0077 4.02 3.59 2 - D 16 1.02 3.16 D 10 @ 200
tengah bentang

205 tulangan atas 1.4 20 30 13.28 0.0033 0.0033 0.0077 4.02 3.59 2 - D 16 1.17 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.2 20 30 11.38 0.0028 0.0033 0.0077 4.02 3.59 2 - D 16 0.12 3.16 D 10 @ 200
tengah bentang

206 tulangan atas 1.1 20 30 10.34 0.0025 0.0033 0.0077 4.02 3.59 2 - D 16 1.93 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.7 20 30 6.92 0.0017 0.0033 0.0077 4.02 3.59 2 - D 16 0.13 3.16 D 10 @ 200
tengah bentang

207 tulangan atas 1.4 20 30 13.57 0.0034 0.0034 0.0077 4.02 3.59 2 - D 16 1.49 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.1 20 30 10.81 0.0027 0.0033 0.0077 4.02 3.59 2 - D 16 0.52 3.16 D 10 @ 200
tengah bentang

1035 tulangan atas 1.5 20 30 13.85 0.0034 0.0034 0.0077 4.02 3.59 2 - D 16 0.71 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.5 20 30 4.55 0.0011 0.0033 0.0077 4.02 3.59 2 - D 16 1.84 3.16 D 10 @ 200
tengah bentang

1062 tulangan atas 1.7 20 30 16.51 0.0041 0.0041 0.0077 4.02 3.59 2 - D 16 1.22 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.7 20 30 6.92 0.0017 0.0033 0.0077 4.02 3.59 2 - D 16 2.29 3.16 D 10 @ 200
tengah bentang

1324 tulangan atas 1.7 20 30 16.41 0.0041 0.0041 0.0077 4.02 3.59 2 - D 16 0.88 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.2 20 30 11.38 0.0028 0.0033 0.0077 4.02 3.59 2 - D 16 1.54 3.16 D 10 @ 200
tengah bentang

1325 tulangan atas 1.9 20 30 17.55 0.0044 0.0044 0.0077 4.02 3.59 2 - D 16 0.41 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.1 20 30 10.81 0.0027 0.0033 0.0077 4.02 3.59 2 - D 16 1.15 3.16 D 10 @ 200
tengah bentang

1328 tulangan atas 1.5 20 30 14.32 0.0036 0.0036 0.0077 4.02 3.59 2 - D 16 0.66 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.0 20 30 9.87 0.0024 0.0033 0.0077 4.02 3.59 2 - D 16 1.34 3.16 D 10 @ 200
tengah bentang

1329 tulangan atas 1.6 20 30 14.80 0.0037 0.0037 0.0077 4.02 3.59 2 - D 16 0.25 3.16 D 10 @ 125
tumpuan
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 63 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tulangan bawah- -1.0 20 30 9.01 0.0022 0.0033 0.0077 4.02 3.59 2 - D 16 1.00 3.16 D 10 @ 200
tengah bentang

1454 tulangan atas 0.6 20 30 5.41 0.0013 0.0033 0.0077 4.02 3.59 2 - D 16 0.32 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.4 20 30 3.60 0.0009 0.0033 0.0077 4.02 3.59 2 - D 16 0.50 3.16 D 10 @ 200
tengah bentang

1455 tulangan atas 0.7 20 30 6.55 0.0016 0.0033 0.0077 4.02 3.59 2 - D 16 0.20 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 2.56 0.0006 0.0033 0.0077 4.02 3.59 2 - D 16 0.53 3.16 D 10 @ 200
tengah bentang

1456 tulangan atas 2.2 20 30 20.40 0.0052 0.0052 0.0077 4.02 3.59 2 - D 16 0.24 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.1 20 30 1.14 0.0003 0.0033 0.0077 4.02 3.59 2 - D 16 1.08 3.16 D 10 @ 200
tengah bentang

1457 tulangan atas 2.0 20 30 19.07 0.0048 0.0048 0.0077 4.02 3.59 2 - D 16 0.36 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 2.37 0.0006 0.0033 0.0077 4.02 3.59 2 - D 16 1.03 3.16 D 10 @ 200
tengah bentang
BX1 Dicek terhadap Lentur MZ dan lentur MY, akibat gaya horisontal dari perletakan kuda-kuda rangka baja yang juga menentukan.
28 atas tumpuan (MZ) 2.3 30 35 10.12 0.0025 0.0033 0.0043 4.02 4.47 2 - D 16 2.10 5.72 D 10 @ 125
samping tump (MY) 1.6 35 30 8.51 0.0021 0.0033 0.0044 4.02 3.75 2 - D 16 0.93
bawah midspan (MZ) -4.1 30 35 17.94 0.0045 0.0045 0.0065 6.03 6.53 3 - D 16 0.13 5.72 D 10 @ 200
samping midspan (MY) -3.7 35 30 20.06 0.0051 0.0051 0.0066 6.03 5.47 3 - D 16 1.17

29 atas tumpuan (MZ) 7.3 30 35 31.71 0.0084 0.0084 0.0086 8.04 8.47 4 - D 16 4.89 5.72 D 10 @ 125
samping tump (MY) 5.0 35 30 27.10 0.0070 0.0070 0.0088 8.04 7.08 4 - D 16 2.25
bawah midspan (MZ) -6.1 30 35 26.28 0.0068 0.0068 0.0086 8.04 8.47 4 - D 16 2.68 5.72 D 10 @ 200
samping midspan (MY) -4.0 35 30 21.79 0.0056 0.0056 0.0066 6.03 5.47 3 - D 16 3.00

30 atas tumpuan (MZ) 7.9 30 35 34.49 0.0092 0.0092 0.0108 10.05 10.28 5 - D 16 8.29 5.72 D 10 @ 125
samping tump (MY) 6.2 35 30 33.39 0.0089 0.0089 0.0110 10.05 8.60 5 - D 16 4.83
bawah midspan (MZ) -4.2 30 35 18.07 0.0045 0.0045 0.0065 6.03 6.53 3 - D 16 5.25 5.72 D 10 @ 200
samping midspan (MY) -3.7 35 30 20.00 0.0051 0.0051 0.0066 6.03 5.47 3 - D 16 6.57

37 atas tumpuan (MZ) 2.0 30 35 8.60 0.0021 0.0033 0.0043 4.02 4.47 2 - D 16 1.99 5.72 D 10 @ 125
samping tump (MY) 3.5 35 30 18.81 0.0047 0.0047 0.0066 6.03 5.47 3 - D 16 1.14
bawah midspan (MZ) -4.0 30 35 17.38 0.0044 0.0044 0.0065 6.03 6.53 3 - D 16 0.04 5.72 D 10 @ 200
samping midspan (MY) -1.7 35 30 9.05 0.0022 0.0033 0.0044 4.02 3.75 2 - D 16 0.63

38 atas tumpuan (MZ) 7.2 30 35 31.28 0.0082 0.0082 0.0086 8.04 8.47 4 - D 16 4.89 5.72 D 10 @ 125
samping tump (MY) 4.3 35 30 23.42 0.0060 0.0060 0.0066 6.03 5.47 3 - D 16 3.01
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 64 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
bawah midspan (MZ) -6.1 30 35 26.67 0.0069 0.0069 0.0086 8.04 8.47 4 - D 16 2.77 5.72 D 10 @ 200
samping midspan (MY) -4.7 35 30 25.48 0.0066 0.0066 0.0066 6.03 5.47 3 - D 16 1.87

39 atas tumpuan (MZ) 8.3 30 35 36.01 0.0097 0.0097 0.0108 10.05 10.28 5 - D 16 8.43 5.72 D 10 @ 125
samping tump (MY) 3.5 35 30 18.70 0.0047 0.0047 0.0066 6.03 5.47 3 - D 16 6.60
bawah midspan (MZ) -4.0 30 35 17.46 0.0044 0.0044 0.0065 6.03 6.53 3 - D 16 5.53 5.72 D 10 @ 200
samping midspan (MY) -6.5 35 30 34.96 0.0094 0.0094 0.0110 10.05 8.60 5 - D 16 4.34

1173 atas tumpuan (MZ) 8.0 30 35 34.84 0.0093 0.0093 0.0108 10.05 10.28 5 - D 16 5.20 5.72 D 10 @ 125
samping tump (MY) 6.2 35 30 33.50 0.0089 0.0089 0.0110 10.05 8.60 5 - D 16 6.58
bawah midspan (MZ) -4.1 30 35 17.94 0.0045 0.0045 0.0065 6.03 6.53 3 - D 16 8.32 5.72 D 10 @ 200
samping midspan (MY) -3.7 35 30 20.06 0.0051 0.0051 0.0066 6.03 5.47 3 - D 16 4.78

1174 atas tumpuan (MZ) 7.3 30 35 31.84 0.0084 0.0084 0.0086 8.04 8.47 4 - D 16 2.64 5.72 D 10 @ 125
samping tump (MY) 5.0 35 30 27.16 0.0071 0.0071 0.0088 8.04 7.08 4 - D 16 3.01
bawah midspan (MZ) -6.1 30 35 26.28 0.0068 0.0068 0.0086 8.04 8.47 4 - D 16 4.90 5.72 D 10 @ 200
samping midspan (MY) -4.0 35 30 21.79 0.0056 0.0056 0.0066 6.03 5.47 3 - D 16 2.15

1175 atas tumpuan (MZ) 3.3 30 35 14.29 0.0036 0.0036 0.0043 4.02 4.47 2 - D 16 0.50 5.72 D 10 @ 125
samping tump (MY) 1.6 35 30 8.46 0.0021 0.0033 0.0044 4.02 3.75 2 - D 16 1.17
bawah midspan (MZ) -4.2 30 35 18.07 0.0045 0.0045 0.0065 6.03 6.53 3 - D 16 2.13 5.72 D 10 @ 200
samping midspan (MY) -3.7 35 30 20.00 0.0051 0.0051 0.0066 6.03 5.47 3 - D 16 0.82

1176 atas tumpuan (MZ) 8.3 30 35 36.10 0.0097 0.0097 0.0108 10.05 10.28 5 - D 16 5.84 5.72 D 10 @ 125
samping tump (MY) 3.5 35 30 18.81 0.0047 0.0047 0.0066 6.03 5.47 3 - D 16 4.35
bawah midspan (MZ) -4.0 30 35 17.38 0.0044 0.0044 0.0065 6.03 6.53 3 - D 16 8.43 5.72 D 10 @ 200
samping midspan (MY) -6.4 35 30 34.91 0.0093 0.0093 0.0110 10.05 8.60 5 - D 16 6.61

1177 atas tumpuan (MZ) 7.3 30 35 31.49 0.0083 0.0083 0.0086 8.04 8.47 4 - D 16 2.90 5.72 D 10 @ 125
samping tump (MY) 4.3 35 30 23.42 0.0060 0.0060 0.0066 6.03 5.47 3 - D 16 1.87
bawah midspan (MZ) -6.1 30 35 26.67 0.0069 0.0069 0.0086 8.04 8.47 4 - D 16 4.90 5.72 D 10 @ 200
samping midspan (MY) -4.7 35 30 25.48 0.0066 0.0066 0.0066 6.03 5.47 3 - D 16 3.01

1178 atas tumpuan (MZ) 3.1 30 35 13.38 0.0033 0.0033 0.0043 4.02 4.47 2 - D 16 0.41 5.72 D 10 @ 125
samping tump (MY) 3.5 35 30 18.70 0.0047 0.0047 0.0066 6.03 5.47 3 - D 16 0.63
bawah midspan (MZ) -4.0 30 35 17.46 0.0044 0.0044 0.0065 6.03 6.53 3 - D 16 1.99 5.72 D 10 @ 200
samping midspan (MY) -1.6 35 30 8.84 0.0022 0.0033 0.0044 4.02 3.75 2 - D 16 1.13
BX2
31 tulangan atas 1.7 25 35 8.86 0.0022 0.0033 0.0052 4.02 4.42 2 - D 16 0.84 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.8 25 35 4.17 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 1.05 4.77 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 65 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
32 tulangan atas 1.9 25 35 9.80 0.0024 0.0033 0.0052 4.02 4.42 2 - D 16 0.88 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.5 25 35 2.55 0.0006 0.0033 0.0052 4.02 4.42 2 - D 16 1.02 4.77 D 10 @ 200
tengah bentang

33 tulangan atas 1.6 25 35 8.18 0.0020 0.0033 0.0052 4.02 4.42 2 - D 16 0.90 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.7 25 35 3.81 0.0009 0.0033 0.0052 4.02 4.42 2 - D 16 1.01 4.77 D 10 @ 200
tengah bentang

34 tulangan atas 1.5 25 35 7.61 0.0019 0.0033 0.0052 4.02 4.42 2 - D 16 0.86 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.8 25 35 3.96 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.99 4.77 D 10 @ 200
tengah bentang

35 tulangan atas 1.4 25 35 7.14 0.0017 0.0033 0.0052 4.02 4.42 2 - D 16 0.89 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.3 25 35 1.67 0.0004 0.0033 0.0052 4.02 4.42 2 - D 16 0.88 4.77 D 10 @ 200
tengah bentang

36 tulangan atas 1.7 25 35 8.76 0.0021 0.0033 0.0052 4.02 4.42 2 - D 16 0.88 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.5 25 35 2.76 0.0007 0.0033 0.0052 4.02 4.42 2 - D 16 0.98 4.77 D 10 @ 200
tengah bentang

42 tulangan atas 1.3 25 35 6.52 0.0016 0.0033 0.0052 4.02 4.42 2 - D 16 0.88 4.77 D 10 @ 125
tumpuan
tulangan bawah- -0.8 25 35 4.33 0.0010 0.0033 0.0052 4.02 4.42 2 - D 16 0.96 4.77 D 10 @ 200
tengah bentang

1126 tulangan atas 3.9 25 35 20.49 0.0052 0.0052 0.0078 6.03 6.42 3 - D 16 2.95 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.0 25 35 10.53 0.0026 0.0033 0.0052 4.02 4.42 2 - D 16 3.01 4.77 D 10 @ 200
tengah bentang
BX3
176 tulangan atas 3.2 25 35 16.52 0.0041 0.0041 0.0052 4.02 4.42 2 - D 16 2.61 4.77 D 10 @ 125
tumpuan
tulangan bawah- -3.8 25 35 19.60 0.0050 0.0050 0.0052 4.02 4.42 2 - D 16 1.25 4.77 D 10 @ 200
tengah bentang

185 tulangan atas 3.1 25 35 16.05 0.0040 0.0040 0.0052 4.02 4.42 2 - D 16 2.58 4.77 D 10 @ 125
tumpuan
tulangan bawah- -3.8 25 35 19.60 0.0050 0.0050 0.0052 4.02 4.42 2 - D 16 1.12 4.77 D 10 @ 200
tengah bentang

208 tulangan atas 2.4 25 35 12.41 0.0031 0.0033 0.0052 4.02 4.42 2 - D 16 1.80 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.9 25 35 15.32 0.0038 0.0038 0.0052 4.02 4.42 2 - D 16 0.39 4.77 D 10 @ 200
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 66 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tengah bentang

214 tulangan atas 2.4 25 35 12.41 0.0031 0.0033 0.0052 4.02 4.42 2 - D 16 1.76 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.9 25 35 15.01 0.0037 0.0037 0.0052 4.02 4.42 2 - D 16 0.33 4.77 D 10 @ 200
tengah bentang

710 tulangan atas 4.4 25 35 22.83 0.0058 0.0058 0.0078 6.03 6.42 3 - D 16 2.31 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.9 25 35 15.01 0.0037 0.0037 0.0052 4.02 4.42 2 - D 16 3.93 4.77 D 10 @ 200
tengah bentang

711 tulangan atas 4.3 25 35 22.31 0.0057 0.0057 0.0078 6.03 6.42 3 - D 16 2.33 4.77 D 10 @ 125
tumpuan
tulangan bawah- -2.9 25 35 15.32 0.0038 0.0038 0.0052 4.02 4.42 2 - D 16 3.90 4.77 D 10 @ 200
tengah bentang

1255 tulangan atas 3.4 25 35 17.72 0.0045 0.0045 0.0052 4.02 4.42 2 - D 16 1.05 4.77 D 10 @ 125
tumpuan
tulangan bawah- -3.8 25 35 19.60 0.0050 0.0050 0.0052 4.02 4.42 2 - D 16 2.68 4.77 D 10 @ 200
tengah bentang

1256 tulangan atas 3.3 25 35 17.20 0.0043 0.0043 0.0052 4.02 4.42 2 - D 16 1.04 4.77 D 10 @ 125
tumpuan
tulangan bawah- -3.8 25 35 19.60 0.0050 0.0050 0.0052 4.02 4.42 2 - D 16 2.65 4.77 D 10 @ 200
tengah bentang
BX4
126 tulangan atas 1.7 20 30 16.03 0.0040 0.0040 0.0077 4.02 3.59 2 - D 16 0.44 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.9 20 30 8.82 0.0022 0.0033 0.0077 4.02 3.59 2 - D 16 1.01 3.16 D 10 @ 200
tengah bentang

127 tulangan atas 1.8 20 30 16.89 0.0042 0.0042 0.0077 4.02 3.59 2 - D 16 1.74 3.16 D 10 @ 125
tumpuan
tulangan bawah- -2.5 20 30 23.62 0.0061 0.0061 0.0077 4.02 3.59 2 - D 16 0.47 3.16 D 10 @ 200
tengah bentang

128 tulangan atas 1.9 20 30 18.02 0.0045 0.0045 0.0077 4.02 3.59 2 - D 16 1.90 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.6 20 30 5.50 0.0013 0.0033 0.0077 4.02 3.59 2 - D 16 0.62 3.16 D 10 @ 200
tengah bentang

131 tulangan atas 2.2 20 30 20.59 0.0052 0.0052 0.0077 4.02 3.59 2 - D 16 0.21 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.6 20 30 15.08 0.0038 0.0038 0.0077 4.02 3.59 2 - D 16 1.29 3.16 D 10 @ 200
tengah bentang

132 tulangan atas 1.5 20 30 13.76 0.0034 0.0034 0.0077 4.02 3.59 2 - D 16 1.65 3.16 D 10 @ 125
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 67 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tumpuan
tulangan bawah- -2.5 20 30 23.24 0.0060 0.0060 0.0077 4.02 3.59 2 - D 16 0.37 3.16 D 10 @ 200
tengah bentang

133 tulangan atas 1.4 20 30 12.81 0.0032 0.0033 0.0077 4.02 3.59 2 - D 16 1.88 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.9 20 30 8.06 0.0020 0.0033 0.0077 4.02 3.59 2 - D 16 0.53 3.16 D 10 @ 200
tengah bentang

175 tulangan atas 1.5 20 30 14.32 0.0036 0.0036 0.0077 4.02 3.59 2 - D 16 0.54 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.1 20 30 0.85 0.0002 0.0033 0.0077 4.02 3.59 2 - D 16 0.87 3.16 D 10 @ 200
tengah bentang

177 tulangan atas 1.7 20 30 16.13 0.0040 0.0040 0.0077 4.02 3.59 2 - D 16 0.85 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 2.85 0.0007 0.0033 0.0077 4.02 3.59 2 - D 16 0.43 3.16 D 10 @ 200
tengah bentang

184 tulangan atas 1.6 20 30 15.18 0.0038 0.0038 0.0077 4.02 3.59 2 - D 16 0.65 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.1 20 30 1.14 0.0003 0.0033 0.0077 4.02 3.59 2 - D 16 0.90 3.16 D 10 @ 200
tengah bentang

186 tulangan atas 1.7 20 30 16.41 0.0041 0.0041 0.0077 4.02 3.59 2 - D 16 0.87 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 3.23 0.0008 0.0033 0.0077 4.02 3.59 2 - D 16 0.49 3.16 D 10 @ 200
tengah bentang

209 tulangan atas 2.7 20 30 25.61 0.0066 0.0066 0.0077 4.02 3.59 2 - D 16 2.38 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.1 20 30 0.47 0.0001 0.0033 0.0077 4.02 3.59 2 - D 16 1.66 3.16 D 10 @ 200
tengah bentang

215 tulangan atas 2.7 20 30 25.99 0.0067 0.0067 0.0077 4.02 3.59 2 - D 16 2.47 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.2 20 30 1.71 0.0004 0.0033 0.0077 4.02 3.59 2 - D 16 1.51 3.16 D 10 @ 200
tengah bentang

593 tulangan atas 2.9 20 30 27.51 0.0072 0.0072 0.0077 4.02 3.59 2 - D 16 1.84 3.16 D 10 @ 125
tumpuan
tulangan bawah- -2.5 20 30 23.62 0.0061 0.0061 0.0077 4.02 3.59 2 - D 16 2.93 3.16 D 10 @ 200
tengah bentang

594 tulangan atas 3.2 20 30 29.98 0.0079 0.0079 0.0116 6.03 5.12 3 - D 16 1.80 3.16 D 10 @ 125
tumpuan
tulangan bawah- -2.5 20 30 23.24 0.0060 0.0060 0.0077 4.02 3.59 2 - D 16 3.04 3.16 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 68 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )

1326 tulangan atas 1.0 20 30 9.39 0.0023 0.0033 0.0077 4.02 3.59 2 - D 16 0.57 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.5 20 30 4.84 0.0012 0.0033 0.0077 4.02 3.59 2 - D 16 0.70 3.16 D 10 @ 200
tengah bentang

1327 tulangan atas 1.2 20 30 11.29 0.0028 0.0033 0.0077 4.02 3.59 2 - D 16 0.56 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.5 20 30 4.93 0.0012 0.0033 0.0077 4.02 3.59 2 - D 16 0.81 3.16 D 10 @ 200
tengah bentang

1330 tulangan atas 1.9 20 30 18.02 0.0045 0.0045 0.0077 4.02 3.59 2 - D 16 0.29 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.6 20 30 5.50 0.0013 0.0033 0.0077 4.02 3.59 2 - D 16 1.09 3.16 D 10 @ 200
tengah bentang

1331 tulangan atas 2.4 20 30 23.05 0.0059 0.0059 0.0077 4.02 3.59 2 - D 16 0.01 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.9 20 30 8.06 0.0020 0.0033 0.0077 4.02 3.59 2 - D 16 1.36 3.16 D 10 @ 200
tengah bentang

1491 tulangan atas 0.8 20 30 7.30 0.0018 0.0033 0.0077 4.02 3.59 2 - D 16 0.09 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.5 20 30 13.85 0.0034 0.0034 0.0077 4.02 3.59 2 - D 16 1.05 3.16 D 10 @ 200
tengah bentang

1492 tulangan atas 1.8 20 30 17.45 0.0044 0.0044 0.0077 4.02 3.59 2 - D 16 0.53 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.6 20 30 5.22 0.0013 0.0033 0.0077 4.02 3.59 2 - D 16 0.96 3.16 D 10 @ 200
tengah bentang

1534 tulangan atas 0.8 20 30 7.87 0.0019 0.0033 0.0077 4.02 3.59 2 - D 16 0.61 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.9 20 30 8.63 0.0021 0.0033 0.0077 4.02 3.59 2 - D 16 0.85 3.16 D 10 @ 200
tengah bentang

1535 tulangan atas 1.2 20 30 11.67 0.0029 0.0033 0.0077 4.02 3.59 2 - D 16 1.09 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.7 20 30 15.94 0.0040 0.0040 0.0077 4.02 3.59 2 - D 16 0.37 3.16 D 10 @ 200
tengah bentang
BX5
129 tulangan atas 0.4 15 20 13.59 0.0034 0.0034 0.0111 2.65 1.40 2 - D 13 0.21 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.78 0.0012 0.0033 0.0111 2.65 1.40 2 - D 13 0.28 1.39 D 10 @ 200
tengah bentang

130 tulangan atas 0.4 15 20 13.22 0.0033 0.0033 0.0111 2.65 1.40 2 - D 13 0.20 1.39 D 10 @ 125
tumpuan
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 69 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
tulangan bawah- -0.1 15 20 4.04 0.0010 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 200
tengah bentang

178 tulangan atas 0.4 15 20 12.86 0.0032 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.41 0.0011 0.0033 0.0111 2.65 1.40 2 - D 13 0.21 1.39 D 10 @ 200
tengah bentang

179 tulangan atas 0.3 15 20 9.92 0.0024 0.0033 0.0111 2.65 1.40 2 - D 13 0.24 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.04 0.0010 0.0033 0.0111 2.65 1.40 2 - D 13 0.20 1.39 D 10 @ 200
tengah bentang

180 tulangan atas 0.4 15 20 12.86 0.0032 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 5.14 0.0012 0.0033 0.0111 2.65 1.40 2 - D 13 0.23 1.39 D 10 @ 200
tengah bentang

181 tulangan atas 0.3 15 20 11.39 0.0028 0.0033 0.0111 2.65 1.40 2 - D 13 0.25 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.04 0.0010 0.0033 0.0111 2.65 1.40 2 - D 13 0.21 1.39 D 10 @ 200
tengah bentang

182 tulangan atas 0.3 15 20 10.29 0.0025 0.0033 0.0111 2.65 1.40 2 - D 13 0.25 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.41 0.0011 0.0033 0.0111 2.65 1.40 2 - D 13 0.19 1.39 D 10 @ 200
tengah bentang

183 tulangan atas 0.4 15 20 12.86 0.0032 0.0033 0.0111 2.65 1.40 2 - D 13 0.28 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.2 15 20 5.51 0.0013 0.0033 0.0111 2.65 1.40 2 - D 13 0.22 1.39 D 10 @ 200
tengah bentang

210 tulangan atas 0.3 15 20 10.65 0.0026 0.0033 0.0111 2.65 1.40 2 - D 13 0.24 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 3.31 0.0008 0.0033 0.0111 2.65 1.40 2 - D 13 0.21 1.39 D 10 @ 200
tengah bentang

211 tulangan atas 0.3 15 20 12.49 0.0031 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.78 0.0012 0.0033 0.0111 2.65 1.40 2 - D 13 0.28 1.39 D 10 @ 200
tengah bentang

212 tulangan atas 0.3 15 20 11.02 0.0027 0.0033 0.0111 2.65 1.40 2 - D 13 0.24 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 3.31 0.0008 0.0033 0.0111 2.65 1.40 2 - D 13 0.21 1.39 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 70 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )
213 tulangan atas 0.4 15 20 12.86 0.0032 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.1 15 20 4.78 0.0012 0.0033 0.0111 2.65 1.40 2 - D 13 0.27 1.39 D 10 @ 200
tengah bentang

640 tulangan atas 0.7 15 20 26.45 0.0068 0.0068 0.0111 2.65 1.40 2 - D 13 0.14 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.4 15 20 15.06 0.0038 0.0038 0.0111 2.65 1.40 2 - D 13 0.43 1.39 D 10 @ 200
tengah bentang

641 tulangan atas 0.7 15 20 26.45 0.0068 0.0068 0.0111 2.65 1.40 2 - D 13 0.14 1.39 D 10 @ 125
tumpuan
tulangan bawah- -0.4 15 20 15.06 0.0038 0.0038 0.0111 2.65 1.40 2 - D 13 0.43 1.39 D 10 @ 200
tengah bentang
BA
269 tulangan atas 0.9 20 30 8.82 0.0022 0.0033 0.0077 4.02 3.59 2 - D 16 0.49 3.16 D 10 @ 125
tumpuan
tulangan bawah- 0.0 20 30 0.28 0.0001 0.0033 0.0077 4.02 3.59 2 - D 16 0.85 3.16 D 10 @ 125
tengah bentang

270 tulangan atas 2.3 20 30 21.53 0.0055 0.0055 0.0077 4.02 3.59 2 - D 16 2.26 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.2 20 30 2.09 0.0005 0.0033 0.0077 4.02 3.59 2 - D 16 1.57 3.16 D 10 @ 200
tengah bentang

271 tulangan atas -0.1 20 30 1.33 0.0003 0.0033 0.0077 4.02 3.59 2 - D 16 1.11 3.16 D 10 @ 200
tumpuan
tulangan bawah- -1.4 20 30 13.09 0.0032 0.0033 0.0077 4.02 3.59 2 - D 16 0.71 3.16 D 10 @ 200
tengah bentang

272 tulangan atas -1.1 20 30 9.96 0.0024 0.0033 0.0077 4.02 3.59 2 - D 16 0.10 3.16 D 10 @ 200
tumpuan
tulangan bawah- -1.4 20 30 13.19 0.0033 0.0033 0.0077 4.02 3.59 2 - D 16 0.14 3.16 D 10 @ 200
tengah bentang

273 tulangan atas -0.2 20 30 1.80 0.0004 0.0033 0.0077 4.02 3.59 2 - D 16 0.61 3.16 D 10 @ 200
tumpuan
tulangan bawah- -1.3 20 30 12.71 0.0031 0.0033 0.0077 4.02 3.59 2 - D 16 1.09 3.16 D 10 @ 200
tengah bentang

274 tulangan atas 1.9 20 30 18.21 0.0046 0.0046 0.0077 4.02 3.59 2 - D 16 1.25 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 3.13 0.0008 0.0033 0.0077 4.02 3.59 2 - D 16 1.94 3.16 D 10 @ 200
tengah bentang
Halaman
PROYEK PEMBANGUNAN FASILITAS TRANSMISI GAS 71 dari 76
DAN KOMPRESI MUSI BARAT - PAGARDEWA
DAERAH OPERASI HULU SUMBAGSEL (PAKET-II)
PERHITUNGAN : Dok. No. C-PGS2-5-1340-001-E

TABEL PENULANGAN BALOK FRAME


No. lokasi Mu lebar (b) tinggi (h) Rn r req'd r gov'n r prov'd As prov'd Mcap tulangan Vu f Vc sengkang
beam tulangan (ton m) (cm) (cm) (cm2) (t-m) (ton ) (ton )

275 tulangan atas 0.8 20 30 7.68 0.0019 0.0033 0.0077 4.02 3.59 2 - D 16 0.29 3.16 D 10 @ 125
tumpuan
tulangan bawah- 0.0 20 30 0.28 0.0001 0.0033 0.0077 4.02 3.59 2 - D 16 0.75 3.16 D 10 @ 125
tengah bentang

276 tulangan atas 2.1 20 30 19.92 0.0050 0.0050 0.0077 4.02 3.59 2 - D 16 2.18 3.16 D 10 @ 125
tumpuan
tulangan bawah- -0.3 20 30 2.85 0.0007 0.0033 0.0077 4.02 3.59 2 - D 16 1.31 3.16 D 10 @ 200
tengah bentang

277 tulangan atas -0.2 20 30 1.99 0.0005 0.0033 0.0077 4.02 3.59 2 - D 16 1.00 3.16 D 10 @ 200
tumpuan
tulangan bawah- -1.3 20 30 12.62 0.0031 0.0033 0.0077 4.02 3.59 2 - D 16 0.50 3.16 D 10 @ 200
tengah bentang

278 tulangan atas -0.6 20 30 6.07 0.0015 0.0033 0.0077 4.02 3.59 2 - D 16 0.14 3.16 D 10 @ 200
tumpuan
tulangan bawah- -1.3 20 30 12.62 0.0031 0.0033 0.0077 4.02 3.59 2 - D 16 0.37 3.16 D 10 @ 200
tengah bentang

279 tulangan atas 0.2 20 30 1.61 0.0004 0.0033 0.0077 4.02 3.59 2 - D 16 0.51 3.16 D 10 @ 125
tumpuan
tulangan bawah- -1.0 20 30 9.68 0.0024 0.0033 0.0077 4.02 3.59 2 - D 16 0.98 3.16 D 10 @ 200
tengah bentang

280 tulangan atas 1.7 20 30 16.13 0.0040 0.0040 0.0077 4.02 3.59 2 - D 16 0.89 3.16 D 10 @ 125
tumpuan
tulangan bawah- 0.0 20 30 0.09 0.0000 0.0033 0.0077 4.02 3.59 2 - D 16 1.58 3.16 D 10 @ 200
tengah bentang

Das könnte Ihnen auch gefallen