Valle Dulce Phase 2: Caroline Model

Requirements
Scope of Work
Material Size Details
ROOFING Metal Sheets .40 mm thk
Purlins 100X50x15x1.5
Purlin Support 100X50x15x1.2

Sag rod 10mmø Plain round bar bolted on each Purlin

Metal Joist 25x25x4mm

Fascia Board 9mm thk Fiber Cement Hardie Senepa

Roof Beam

1/2" perforation air vent


Eaves Ceiling 4.5mm thk Riveted to steel angle ceiling joist (verify
location of air vent)

350 psi CHB wall; smooth face paint


finish; treated with masonry neutralizer
( 1.)Boysen
permacoat #701") with 2.)masonry putty
EXTERIOR WALLS CHB 6"CHB (Boysen # 7311 or approved equal)
3.) top coat with
semigloss latex paint ( Boysen Permacoat
# 715) 4.) Boysen
B44 or approved equal

350 psi CHB wall; smooth face paint


finish; treated with masonry neutralizer
1.) Boysen
Firewall 6"CHB B44 or approved equal 2.) 3 coats of
elastomeric paint "flexseal" or approved
equivalent.

Clear gkass on steel


casement w/
Window Casing 6mmx6mm security
grilles , paint Finish
Installation Process Remarks