IS 12232 (Part
50mm / 63 mm / 75mm / 90mm Engineering
b 1):1996 & No 138.24
(Plastic) Plastic
(Part 2): 1987
Sump size-25m3 Total MIS Cost 32223 33322 34360 38282 41956 44698 44266 50907 55888 65797 73684 86695 98453 117466
12 mm Sump size-20m3 Total MIS Cost 30098 31197 32235 36157 39831 42573 42141 48782 53763 63672 71559 84570 96328 115341
Sump size-13m3 Total MIS Cost 26823 27922 28960 32882 36556 39298 38866 45507 50488 60397 68284 81295 93053 112066
Total MIS Cost Excluding Sump Cost 15748 16847 17885 21807 25481 28223 27791 34432 39413 49322 57209 70220 81978 100991
Sump size-40m3 Total MIS Cost 39491 40950 42349 46373 50971 54330 54923 63616 68598 80863 91135 108019 122896 146513
Sump size-25m3 Total MIS Cost 33966 35425 36824 40848 45446 48805 49398 58091 63073 75338 85610 102494 117371 140988
16 mm Sump size-20m3 Total MIS Cost 31841 33300 34699 38723 43321 46680 47273 55966 60948 73213 83485 100369 115246 138863
Sump size-13m3 Total MIS Cost 28566 30025 31424 35448 40046 43405 43998 52691 57673 69938 80210 97094 111971 135588
Total MIS Cost Excluding Sump Cost 17491 18950 20349 24373 28971 32330 32923 41616 46598 58863 69135 86019 100896 124513
Note:
1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or second
lateral line in case of wider spacing ( 8 x 8 and above) or selection of components from within the approved list with variable dimention or components other than considered for
working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost. GGRC will consider 10% deviation in the above cost for the
purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearest plant spacing. The
assistance amount shall be calculated as per the unit cost of the nearest spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter for the purpose of calculation of Govt. Contribution
4. Cost of Micro Tube will be considered in place of online emitter wherever needed and prefered by farmer.
4.1 Use of Micro tube is allowed throughout Gujarat across the MIS Suppliers, if irrigation water is of bad quality and meets anyone or all water analysis parameter as described
below
i) Irrigation water having Fe content equal to or more than 0.1 Mg/litre ii) Irrigation water with TSS (TDS) level equal to or more than 2000 PPM. iii) Irrigation water with Residual
Sodium Carbonate (RSC) equal to or more than 2.5 Meq./litre
Annexure - B
Sump size-40m3 Total MIS Cost 80155 86805 98142 104070 116735
Sump size-25m3 Total MIS Cost 74630 81280 92617 98545 111210
25 mm
Sump size-20m3 Total MIS Cost 72505 79155 90492 96420 109085
Sump size-13m3 Total MIS Cost 69230 75880 87217 93145 105810
Total MIS Cost Excluding Sump Cost 58155 64805 76142 82070 94735
Sump size-40m4 Total MIS Cost 87926 95345 107629 114738 128115
Sump size-25m4 Total MIS Cost 82401 89820 102104 109213 122590
32 mm Sump size-20m4 Total MIS Cost 80276 87695 99979 107088 120465
Sump size-13m4 Total MIS Cost 77001 84420 96704 103813 117190
Total MIS Cost Excluding Sump Cost 65926 73345 85629 92738 106115
Note:
1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be
irrigated, due to this requirement of PVC / HDPE pipe or selection of components from within the approved list
with variable dimensions or components other than considered for working out unit cost per ha may be needed
due to requirement of design consequently exceeding the above unit cost. GGRC will consider 10% deviation in the
above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be
calculated on the pro rata bases of the nearest plant spacing. The assistance amount shall be calculated as per the
unit cost of the nearest spacing of plants.
Annexure - C
Gujarat Green Revolution Company Ltd.
ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost (Jantri) for Porous pipe based Micro Irrigation System with & without inclusion of water sump cost w.e.f. 07.10.2010 (Figures in Rs.)
Crop Spacing / Lateral Spacing (Mtr.)
Lateral
Particular 12 x 12
Size 1.25 X
and 10 x 10 9X9 8X8 6X6 5X5 4X4 3X3 3 X 1.5 2.5 X 2.5 2X2 1.5 X 1.5 1X1
1.25
above
Sump size-40m3 Total MIS Cost 52669 55130 56913 59072 65650 71083 72505 92063 123736 105611 95324 113755 128487 150596
Sump size-25m3 Total MIS Cost 47144 49605 51388 53547 60125 65558 66980 86538 118211 100086 89799 108230 122962 145071
9 mm Sump size-20m3 Total MIS Cost 45019 47480 49263 51422 58000 63433 64855 84413 116086 97961 87674 106105 120837 142946
Sump size-13m3 Total MIS Cost 41744 44205 45988 48147 54725 60158 61580 81138 112811 94686 84399 102830 117562 139671
Total MIS Cost Excluding Sump Cost 30669 33130 34913 37072 43650 49083 50505 70063 101736 83611 73324 91755 106487 128596
Sump size-40m3 Total MIS Cost 54660 57503 59566 62038 69598 75829 76906 99613 137262 115103 106110 128138 145745 172168
Sump size-25m3 Total MIS Cost 49135 51978 54041 56513 64073 70304 71381 94088 131737 109578 100585 122613 140220 166643
12 mm Sump size-20m3 Total MIS Cost 47010 49853 51916 54388 61948 68179 69256 91963 129612 107453 98460 120488 138095 164518
Sump size-13m3 Total MIS Cost 43735 46578 48641 51113 58673 64904 65981 88688 126337 104178 95185 117213 134820 161243
Total MIS Cost Excluding Sump Cost 32660 35503 37566 40038 47598 53829 54906 77613 115262 93103 84110 106138 123745 150168
Sump size-40m3 Total MIS Cost 56661 59888 62233 65020 73566 80599 81328 107201 150856 124643 116950 142592 163090 193849
Sump size-25m3 Total MIS Cost 51136 54363 56708 59495 68041 75074 75803 101676 145331 119118 111425 137067 157565 188324
16 mm Sump size-20m3 Total MIS Cost 49011 52238 54583 57370 65916 72949 73678 99551 143206 116993 109300 134942 155440 186199
Sump size-13m3 Total MIS Cost 45736 48963 51308 54095 62641 69674 70403 96276 139931 113718 106025 131667 152165 182924
Total MIS Cost Excluding Sump Cost 34661 37888 40233 43020 51566 58599 59328 85201 128856 102643 94950 120592 141090 171849
Sump size-40m3 Total MIS Cost 62224 66427 69472 73107 84188 93276 94453 127434 181431 149619 139169 172082 198394 237877
Sump size-25m3 Total MIS Cost 56699 60902 63947 67582 78663 87751 88928 121909 175906 144094 133644 166557 192869 232352
22 mm Sump size-20m3 Total MIS Cost 54574 58777 61822 65457 76538 85626 86803 119784 173781 141969 131519 164432 190744 230227
Sump size-13m3 Total MIS Cost 51299 55502 58547 62182 73263 82351 83528 116509 170506 138694 128244 161157 187469 226952
Total MIS Cost Excluding Sump Cost 40224 44427 47472 51107 62188 71276 72453 105434 159431 127619 117169 150082 176394 215877
Note:
1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or second lateral line in case of wider spacing ( 8 x 8 and above) or
selection of components from within the approved list with variable dimention or components other than considered for working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost.
GGRC will consider 10% deviation in the above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearst plant spacing. The assistance amount shall be calculated as per the unit cost of the
nearst spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter for the purpose of calculation of Govt. Contribution
Annexure - D
Gujarat Green Revolution Company Ltd.
ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost/Ha. (Jantri) for Drip Tape w.e.f. 07.10.2010 (Figures in Rs.)
Sump size-40m3 Total MIS Cost 44648 45619 46279 47088 49539 51486 54425 59319 59319 63214 69065 78844 86638 98380
Sump size-25m3 Total MIS Cost 39123 40094 40754 41563 44014 45961 48900 53794 53794 57689 63540 73319 81113 92855
12.5 mm
(wall
thickness Sump size-20m3 Total MIS Cost 36998 37969 38629 39438 41889 43836 46775 51669 51669 55564 61415 71194 78988 90730
0.40 mm)
Sump size-13m3 Total MIS Cost 33723 34694 35354 36163 38614 40561 43500 48394 48394 52289 58140 67919 75713 87455
Total MIS Cost Excluding Sump Cost 22648 23619 24279 25088 27539 29486 32425 37319 37319 41214 47065 56844 64638 76380
Sump size-40m3 Total MIS Cost 46244 47531 48405 49477 52726 55309 59205 65693 65693 70860 78624 91589 101931 117497
15.875
Sump size-25m3 Total MIS Cost 40719 42006 42880 43952 47201 49784 53680 60168 60168 65335 73099 86064 96406 111972
mm (wall
thickness Sump size-20m3 Total MIS Cost 38594 39881 40755 41827 45076 47659 51555 58043 58043 63210 70974 83939 94281 109847
0.508
mm)
Sump size-13m3 Total MIS Cost 35319 36606 37480 38552 41801 44384 48280 54768 54768 59935 67699 80664 91006 106572
Total MIS Cost Excluding Sump Cost 24244 25531 26405 27477 30726 33309 37205 43693 43693 48860 56624 69589 79931 95497
Sump size-40m3 Total MIS Cost 47475 49005 50044 51320 55183 58258 62890 70609 70609 76758 85995 101418 113725 132240
15.875
Sump size-25m3 Total MIS Cost 41950 43480 44519 45795 49658 52733 57365 65084 65084 71233 80470 95893 108200 126715
mm (wall
thickness Sump size-20m3 Total MIS Cost 39825 41355 42394 43670 47533 50608 55240 62959 62959 69108 78345 93768 106075 124590
0.635
mm)
Sump size-13m3 Total MIS Cost 36550 38080 39119 40395 44258 47333 51965 59684 59684 65833 75070 90493 102800 121315
Total MIS Cost Excluding Sump Cost 25475 27005 28044 29320 33183 36258 40890 48609 48609 54758 63995 79418 91725 110240
Sump size-40m3 Total MIS Cost 45439 46566 47332 48271 51117 53380 56793 62477 62477 67001 73800 85157 94212 107849
Sump size-25m3 Total MIS Cost 39914 41041 41807 42746 45592 47855 51268 56952 56952 61476 68275 79632 88687 102324
16.5 mm
(wall
thickness Sump size-20m3 Total MIS Cost 37789 38916 39682 40621 43467 45730 49143 54827 54827 59351 66150 77507 86562 100199
0.40 mm)
Sump size-13m3 Total MIS Cost 34514 35641 36407 37346 40192 42455 45868 51552 51552 56076 62875 74232 83287 96924
Total MIS Cost Excluding Sump Cost 23439 24566 25332 26271 29117 31380 34793 40477 40477 45001 51800 63157 72212 85849
Note:
1. In some cases the location of water source (Bore well / Open well) is found to be far away from the field to be irrigated, due to this requirment of PVC / HDPE pipe or second lateral line in case of wider spacing ( 8 x 8 and above) or selection of
components from within the approved list with variable dimention or components other than considered for working out unit cost per ha may be needed due to requirement of design consequently exceeding the above unit cost. GGRC will consider
10% deviation in the above cost for the purpose of calculation of Government Contribution.
2. In case of crops with plant spacing other than those mentioned above, the amount of assistance could be calculated on the pro rata bases of the nearst plant spacing. The assistance amount shall be calculated as per the unit cost of the nearst
spacing of plants.
3. In case of Disc / Screen filter, the cost will be calculated considering the rate of Screen filter fot the purpose of calculation of Govt. Contribution
Annexure - E
Gujarat Green Revolution Company Ltd.
ADC Building, P. O. Fertilizernagar - 391 750
Revised Unit Cost (Jantri) for sprinkler irrigation system for 1 Ha. & 2 Ha. Set. w.e.f. 07.10.2010 (Figures
in Rs.)
Coupler Diameter
Particular
63 MM (1 Hac) 75 mm (2 Hac)
Note:
For every increase in Hectare unit above 2 hac. Installation for Sprinkler Irrigation System, addition of Rs. 4000 /
- will be considered.
Annexure - F
Gujarat Green Revolution Company Ltd.
ADC Building, P. O. Fertilizernagar - 391 750
Unit Cost (Jantri) for Rain Gun Sprinkler Set for 1 Ha. & 2 Ha. w.e.f. 07.10.2010
(Figures in Rs.)
MIS cost will be reduced proportionately to area and reference MIS cost will be existing MIS
cost of 1 Ha. per Set.
For working out MIS cost, differential amount between existing MIS cost of 1 Ha. per set and 2
Ha. per set will be added in 1 Ha. set, proportionate to increase in area from 1 Ha. to 2 Ha.