Beruflich Dokumente
Kultur Dokumente
WWW.SCMPROFIT.COM
Table of Contents
Login Screen................................................................................................................................. 3
Home Page................................................................................................................................... 3
Booking Creation for Inbound........................................................................................................ 4
Booking Module ....................................................................................................................... 4
Prepare the XML file for booking upload .................................................................................... 4
Excel file format for Booking .................................................................................................. 4
Generating XML file from Excel file ......................................................................................... 5
Booking Upload ........................................................................................................................ 6
Booking Confirmation............................................................................................................ 6
Warehouse Inbound ..................................................................................................................... 8
Execute the Warehouse Inbound service .................................................................................... 8
Workflow ................................................................................................................................. 9
Receiving ............................................................................................................................ 10
GRN .................................................................................................................................... 21
Putaway .............................................................................................................................. 23
Damaged Putaway ............................................................................................................... 32
1. User enters the URL in browser and it will load the login screen as below.
2. User has to provide valid Login and password to access the application.
Home Page
1. Once the user provides the valid Login details, the Home screen will be loaded.
2. Home screen have the links for ToDo, Alerts, Exceptions and Quick Links.
3. On click of the list shown in the various sections, details Jobs or Booking list is displayed.
Booking is an entry point for any shipment in SCMProFit. A unique booking no will be generated
from system which will be used for the tracking of the shipment all over the SCMProFit. There are
two methods for creating new Booking in SCMProFit as below,
1. Booking module.
2. Booking upload.
Booking Module
1. To create the new booking in SCMProFit using Booking module please refer the booking
manual ver. 1.0 document.
1. User has to generate the XML file from the Excel format provided with the training material.
2. User need to fill the required section details of the booking in order to generate the XML file
1. User need to fill the mandatory columns marked in red colour such as Booking Type, booking
Date, client name etc.
2. Group ID is unique for each booking user need to maintain this key across the sheets to
make a link.
3. All master data fields client name, name etc. should be created well in advance in order to
avoid failure of the booking upload.
1. User enter parties involved in the shipment like trucker, agent etc.
2. Parties sheet is an optional but if user want to enter the parties then he need to enter
mandatory fields like Group Id, party name and Party type.
Products Sheet:
1. User enters the product details for the inbound job like product code, Quantity, UOM
dimension etc.
2. Product code and product profile should be created in the system well in advance.
Services Sheet:
1. User must enter the services details in the services sheet like Warehouse, Road etc. For
Inbound job Service type should be Warehouse and process type is Inbound.
2. Other columns like “owner office sit name” and “executing office site name” is also
mandatory. If executing office is different from the owner office then invoice will be created
only in owner office.
1. From the home screen select the Booking tab and click on the <Booking Upload> option.
2. Upload booking screen appears, Browse the XML file from <Browse> button and click on
<Upload>.
3. System will validate the XML file and populate the result in “Upload Result” section.
4. If validation is successfully done then “Booking no” generated.
5. If validation fails then System will give the issue list with status as failed.
Booking Confirmation
1. Once all the information is entered the user can confirm the booking by clicking the “Action”
button and type as “Confirm”
4. “DK- INBOUND” is the default workflow attached to the inbound job for KLOG warehouse
and Daikin Client. Default workflow will be different for different warehouse and client
combination. It will configured in the administrator module
2. Workflow Search screen will appears, Select the appropriate workflow from the master and
click on <OK> button.
3. Workflow contains the activity details need to be performed during the inbound process.
This work flow may be changed based on client, product category etc. User need to confirm
correct workflow is selected before starting the inbound process.
4. Normal inbound is default workflow for the KLOG warehouse below are activity details.
a. Receiving (Daikin Receiving n Pack)
2. Activity monitor screen will appear. This screen display Pie chart of activity and column chart
of planned, complete and pending quantity.
3. The user can search the Warehouse jobs based on the various filters and parameter.
4. The user can save the search parameter to generate the required Warehouse job list at later
point in time.
5. Search Result will show the required warehouse job grouped by the activities.
6. Click the <Receiving n Pack> link in the activity section of Search result.
8. Select the job no from the grid and click on the <Allocate Resource> button. Allocation
resource screen will appear.
on < > Add resource and quantity button from allocate resource column. It will load new
screen with multiple resource selection option.
13. Click on the <Save> button to create multiple receiving task split based on quantity.
14. Now receiving task will appear on Operators screen for further action. WH Manager can see
these jobs by click <Allocated jobs> link
15. Manager will print the Receiving task from the <Generate Slip> Button.
4. Click on <Generate Label> button to show the Printing screen. Select the label
template from the dropdown list and click on <Search> Button.
5. Pallet UOM will show with the Conv. Qty. Enter the no of Pallets ID label to print.
And click on <Label Preview> button
6. Label will be previewed as below, click on print button to print the label.
5. Activity list screen appear with the task details. Click on the Task Number to open details of
the inbound job.
6. Task details screen will appear with the product details. Operator need to enter the product
details like quantity; Batch no etc. as per the information available in the Actual row of the
product.
5. Select the warehouse from drop down and click on <OK> Button or <Back> Button.
6. To see the activities assign to the user click on the <Warehouse> link.
7. Activity list screen will be loaded in HHT. This screen will group the all task based on the
activity.
10. For the Daikin client below scanning field are configured
a. UOM: Operator will select the UOM for the product. Default value will be “PLT”
if operator want to change the UOM then he will select from the dropdown.
b. Pallet ID: This will be scanned field. Operator need to scan the Pallet id from the
pallet.
11. After scanning all the details, operator will confirm the task. Click <Menu> and select the
<Confirm> option.
12. Once the operator confirm the receiving task Manager need to complete the Receiving
task. Click on the <Complete> button in receiving task screen to complete the receiving
task.
13. Once receiving is completed then no other action will perform for receiving activity
3. GRN activity will be display in the search result sections. Click on the <GRN> link; it will load
the inbound jobs with pending GRN activities.
4. Click on the inbound job no link. Warehouse inbound job details screen will appear.
5. Manager will check and select the product line items in the job.
6. Click <Confirm> button to confirm received quantity and status of the product.
7. GRN confirm screen will appear. User need to select the GRN date in the screen and click on
<YES> button.
10. To print the GRN document go to <GRN Details> view and click on <Final GRN> Button.
11. GRN document screen appears, Select the appropriate template from the “Report template”
dropdown and click <Generate> button.
12. GRN report will be display on screen. User can print the GRN report from Print options.
a. Based on Product - System suggest the location which are reserve for the
SKU.
b. Location Specific – if full pallet then allocate to High rack zone.
c. Space utilization – If pallet less than full quantity then go to pick phase.
d. Area Type – select Pick/Buffer etc. area for Put-away
e. Category – select locations which are allocated for given category. For ex.
Locations electronics category, Laptop category, etc.
f. Storage Class – select Locations for Hazardous, Non-Hazardous, Pharma
cargo etc.
10. To assign the movement task to resource go to Activity Monitor screen and click on
<Movement> activity link.
11. Movement task screen appears, Click on <Group and Allocate Resource> to distribute task
based on Drop zone.
13. Based on the group criteria task splits. Manager will select the resource from the allocation
resource column and click on <Save> button. Putaway task is created with unique Task No.
14. This task move product from staging area to To Location id. Manager will print the putaway
task slip and hand over to the operator.
15. Select <Allocated Job> view from movement activity screen, Movement job details will
loaded.
16. Click on the <Task Number> link Movement Task screen appear.
11. To Print the labels select the check box from the grid and click on <Label Preview>
button to view the pallet label. Click on print button to print the lables.
4. Click on the activity link <Movement> to open the list of the movement task assign to the
operator.
5. Activity list screen appear with the task details in allocated job view. Click on the Task
Number to open details of the Movement task.
7. After all product moved to the respective location operator need to confirm the movement
task. Click on <Confirm> button to confirm the Movement task.
5. Activity list screen will be loaded in HHT. This screen will group the all task based on the
activity.
7. Click on the <Movement Task no> from the list which need to be perform.
8. Scanning field screen will be display on HHT. This screen contain the Palletid , From
location, To Location and Quantity field.
Damaged Putaway
1. Repeat the putaway section steps for the damaged putaway Activity.
2. System will take care of the Damaged putaway strategy in the suggest location event.