Start

Site Survey

No

Approval

Yes

Marking Work Area

Start clearing,
stripping, grabbing

Finish

Site clearing
Start

Preparation

Setting out of border


and elevation

Excavation

Inspection of material

Used for common Transport to disposal


embankment area

Finish

excavation
Start

Preparation

Clearing Location

Marking Pile Location

Setting Hammer

Pile Driving

Check required
depth, hard soil

Finish

Pile driving
Start

Preparation

Excavation

Blinding Stone

Lean Concrete

Cut off piles

Stake out position

Installation of Side Formwork (Phase 1)

Install reinforcement bar

Installation of Side Formwork (Phase 2)

Pouring Concrete

Curing

Finish

Footing remove formwork belum checking belum


Start

Preparation

Install reinforcement bar

Installation of Formwork

Checking and
measuring

Pouring concrete

Remove Formwork

Backfill

Curing

Finish

Column
Start

Preparation

Install Scaffolding

Installation of base formwork

Installation of side formwork

Install Reinforcement
Bar

Installation of whole
formwork

Checking and
measuring

Pouring Concrete

Removing formwork

Removing formwork

Finish

Pier head