HOJA DE METRADOS

OBRA: "LABORATORIO AGROFORESTAL" DE LA UNU


PROPIETARIO : UNIVERSIDAD NACIONAL DE UCAYALI
DISTRITO : PUCALLPA
PROVINCIA: CORONEL PORTILLO FECHA: JULIO 2006
DPTO. : UCAYALI
GRUPO : ESTRUCTURAS

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

ESTRUCTURAS
01.00.00 TRABAJOS PRELIMINARES
01.01.00 Limpieza de terreno Manual laboratorios m2 1 73.60 24.60 1810.56
tanque de neutralizacion y semidentacio m2 1 10.00 3.00 30.00 1840.56
01.02.00 Trazo, Niveles y Replanteo preliminar est 1 1.00 1.00
01.03.00 Cartel de Obra und 1 1.00 1.00
01.04.00 Almacen General glb 1 1.00 1.00
01.05.00 Obras Preliminares varias (inst. agua, lu glb 1 1.00 1.00

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 Corte de terreno (ver detalle lamina U-04 m3 1 85.00 40.00 0.21 714.00 714.00
02.02.00 Relleno con material seleccionado con equipo
y compactado (area de sobrecimiento ar m3 1 48.10 29.60 0.60 854.26
area de bloque 01 m3 1 20.00 10.80 0.60 129.60
area de bloque 05 m3 1 18.00 10.00 0.60 108.00 1091.86
02.03.00 Excavación de zanjas
Cimientos
Entre Eje 2 y 3 m3 2 6.00 0.50 0.90 5.40
Entre Eje 5 y 6 m3 1 1.20 0.50 0.90 0.54
Entre Eje 6 y 7 m3 2 2.20 0.50 0.90 1.98
Entre Eje 7 y 8 m3 1 9.80 0.50 0.90 4.41
Entre Eje 9 y 10 m3 1 1.20 0.50 0.90 0.54
Entre Eje 10y 11 m3 2 2.20 0.50 0.90 1.98
Entre Eje 11 y 12 m3 1 6.40 0.50 0.90 2.88
Entre Eje 13 y 14 m3 1 2.40 0.50 0.90 1.08
Entre Eje 14 y 15 m3 1 1.20 0.50 0.90 0.54
Entre Eje 15 y 16 m3 1 1.20 0.50 0.90 0.54
Eje 17 m3 1 1.40 0.50 0.90 0.63
Eje 19 m3 1 1.40 0.50 0.90 0.63
Entre Eje 17 y 19 m3 1 3.60 0.50 0.90 1.62
m3 2 6.00 0.50 0.90 5.40
Entre Eje C y D m3 1 48.80 0.50 0.90 21.96
Entre Eje A y B m3 1 49.20 0.50 0.90 22.14
Sobrecimiento armado m3 2 48.00 0.15 0.60 8.64
eje 5 y 16 m3 2 29.55 0.15 0.60 5.32
m3 2 29.55 0.40 0.35 8.27
Vigas de cimentacion
Eje 5 m3 2 9.00 0.40 0.90 6.48
Eje 8 m3 2 9.00 0.40 0.90 6.48
Eje 9 m3 2 9.00 0.40 0.90 6.48
Eje 12 m3 2 9.00 0.40 0.90 6.48
Eje 13 m3 2 9.00 0.40 0.90 6.48
Eje 16 m3 2 9.00 0.40 0.90 6.48
Base de escaleras m3 2 1.80 0.80 0.90 2.59
Tanque cisterna m3 1 4.20 4.20 4.00 70.56
Zapatas
Z1 m3 1 48.10 7.00 1.50 505.05
Z2 m3 2 48.10 5.00 1.50 721.50
Z3 m3 1 10.80 7.00 1.50 113.40
Z4 m3 2 2.50 2.50 1.60 20.00
Z5 m3 4 2.80 2.80 1.50 47.04
Z6 m3 2 2.20 4.30 1.50 28.38
tanque de neutralizacion y sedimentacio m3 1 2.80 1.40 1.60 6.27
tanque de control y evacuacion m3 1 1.20 1.20 1.80 2.59
caja de registro m3 2 1.20 0.60 1.20 1.73
alimentacion de agua potable m3 1 125.22 0.30 1.00 37.57
buzones de desagues pluviales m3 2 1.50 1.50 1.80 8.10
Desague pluvial a via existente m3 1 193.46 0.50 1.60 154.77
Conexión desague aguas hervidas a tron m3 1 54.91 0.50 1.60 43.93
Cunetas m3 1 265.20 0.60 0.90 143.21 2040.07

02.04.00 Relleno con material propio


Resto de area de linea de corte y relleno (plano U03)
area de corte y relleno - area de relleno m3 1 2040.00 1091.86 0.20 189.63
clasificado
Cimientos
Entre Eje 2 y 3 m3 2 6.00 0.50 0.10 0.60

Página 1 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Entre Eje 5 y 6 m3 1 1.20 0.50 0.10 0.06
Entre Eje 6 y 7 m3 2 2.20 0.50 0.10 0.22
Entre Eje 7 y 8 m3 1 9.80 0.50 0.10 0.49
Entre Eje 9 y 10 m3 1 1.20 0.50 0.10 0.06
Entre Eje 10y 11 m3 2 2.20 0.50 0.10 0.22
Entre Eje 11 y 12 m3 1 6.40 0.50 0.10 0.32
Entre Eje 13 y 14 m3 1 2.40 0.50 0.10 0.12
Entre Eje 14 y 15 m3 1 1.20 0.50 0.10 0.06
Entre Eje 15 y 16 m3 1 1.20 0.50 0.10 0.06
Eje 17 m3 1 1.40 0.50 0.10 0.07
Eje 19 m3 1 1.40 0.50 0.10 0.07
Entre Eje 17 y 19 m3 1 3.60 0.50 0.10 0.18
m3 2 6.00 0.50 0.10 0.60
Entre Eje C y D m3 1 48.80 0.50 0.10 2.44
Entre Eje A y B m3 1 49.20 0.50 0.10 2.46
Sobrecimiento armado
m3 2 48.00 0.25 0.60 14.40
eje 5 y 16 m3 2 29.55 0.25 0.60 8.87
Vigas de cimentacion
Eje 5 m3 2 9.00 0.40 0.20 1.44
Eje 8 m3 2 9.00 0.40 0.20 1.44
Eje 9 m3 2 9.00 0.40 0.20 1.44
Eje 12 m3 2 9.00 0.40 0.20 1.44
Eje 13 m3 2 9.00 0.40 0.20 1.44
Eje 16 m3 2 9.00 0.40 0.20 1.44
Eje A m3 3 15.20 0.40 0.20 3.65
Eje B m3 3 15.20 0.40 0.20 3.65
Eje C m3 3 15.20 0.40 0.20 3.65
Eje D m3 3 15.20 0.40 0.20 3.65
alimentacion de agua potable m3 1 125.22 0.30 1.00 37.57
Desague pluvial a via existente m3 1 54.91 0.50 1.60 43.93
Conexión desague aguas hervidas a tron m3 1 54.91 0.50 1.60 43.93 369.58

02.05.00 Eliminación de Material Excedente D=1 kms. Aprox


+ 30% de esponjamiento
Corte de terreno (ver detalle lamina U-04 m3 1 85.00 40.00 0.21 714.00
Cimientos
Entre Eje 2 y 3 m3 2 6.00 0.50 0.90 5.40
Entre Eje 5 y 6 m3 1 1.20 0.50 0.90 0.54
Entre Eje 6 y 7 m3 2 2.20 0.50 0.90 1.98
Entre Eje 7 y 8 m3 1 9.80 0.50 0.90 4.41
Entre Eje 9 y 10 m3 1 1.20 0.50 0.90 0.54
Entre Eje 10y 11 m3 2 2.20 0.50 0.90 1.98
Entre Eje 11 y 12 m3 1 6.40 0.50 0.90 2.88
Entre Eje 13 y 14 m3 1 2.40 0.50 0.90 1.08
Entre Eje 14 y 15 m3 1 1.20 0.50 0.90 0.54
Entre Eje 15 y 16 m3 1 1.20 0.50 0.90 0.54
Eje 17 m3 1 1.40 0.50 0.90 0.63
Eje 19 m3 1 1.40 0.50 0.90 0.63
Entre Eje 17 y 19 m3 1 3.60 0.50 0.90 1.62
m3 2 6.00 0.50 0.90 5.40
Entre Eje C y D m3 1 48.80 0.50 0.90 21.96
Entre Eje A y B m3 1 49.20 0.50 0.90 22.14
Sobrecimiento armado
m3 2 48.00 0.15 0.60 8.64
eje 5 y 16 m3 2 29.55 0.15 0.60 5.32
Vigas de cimentacion
Eje 5 m3 2 9.00 0.40 0.90 6.48
Eje 8 m3 2 9.00 0.40 0.90 6.48
Eje 9 m3 2 9.00 0.40 0.90 6.48
Eje 12 m3 2 9.00 0.40 0.90 6.48
Eje 13 m3 2 9.00 0.40 0.90 6.48
Eje 16 m3 2 9.00 0.40 0.90 6.48
Eje A m3 3 15.20 0.40 0.90 16.42
Eje B m3 3 15.20 0.40 0.90 16.42
Eje C m3 3 15.20 0.40 0.90 16.42
Eje D m3 3 15.20 0.40 0.90 16.42
Base de escaleras m3 2 1.80 0.80 0.90 2.59
Tanque cisterna m3 1 4.20 4.20 4.00 70.56
Zapatas
Z1 m3 1 48.10 7.00 1.50 505.05
Z2 m3 2 48.10 5.00 1.50 721.50
Z3 m3 1 10.80 7.00 1.50 113.40
Z4 m3 2 2.50 2.50 1.60 20.00
Z5 m3 4 2.80 2.80 1.50 47.04
Z6 m3 2 2.20 4.30 1.50 28.38
tanque de neutralizacion y sedimentacio m3 1 2.80 1.40 1.60 6.27
tanque de control y evacuacion m3 1 1.20 1.20 1.80 2.59
caja de registro m3 2 1.20 0.60 1.20 1.73

Página 2 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
alimentacion de agua potable m3 1 125.22 0.30 1.00 37.57
buzones de desagues pluviales m3 2 1.50 1.50 1.80 8.10
Desague pluvial a via existente m3 1 193.46 0.50 1.60 154.77
Conexión desague aguas hervidas a tron m3 1 54.91 0.50 1.60 43.93
Cunetas m3 1 265.20 0.60 0.90 143.21
Relleno con material propio
Cimientos
Entre Eje 2 y 3 m3 -2 6.00 0.50 0.10 -0.60
Entre Eje 5 y 6 m3 -1 1.20 0.50 0.10 -0.06
Entre Eje 6 y 7 m3 -2 2.20 0.50 0.10 -0.22
Entre Eje 7 y 8 m3 -1 9.80 0.50 0.10 -0.49
Entre Eje 9 y 10 m3 -1 1.20 0.50 0.10 -0.06
Entre Eje 10y 11 m3 -2 2.20 0.50 0.10 -0.22
Entre Eje 11 y 12 m3 -1 6.40 0.50 0.10 -0.32
Entre Eje 13 y 14 m3 -1 2.40 0.50 0.10 -0.12
Entre Eje 14 y 15 m3 -1 1.20 0.50 0.10 -0.06
Entre Eje 15 y 16 m3 -1 1.20 0.50 0.10 -0.06
Eje 17 m3 -1 1.40 0.50 0.10 -0.07
Eje 19 m3 -1 1.40 0.50 0.10 -0.07
Entre Eje 17 y 19 m3 -1 3.60 0.50 0.10 -0.18
m3 -2 6.00 0.50 0.10 -0.60
Entre Eje C y D m3 -1 48.80 0.50 0.10 -2.44
Entre Eje A y B m3 -1 49.20 0.50 0.10 -2.46
Sobrecimiento armado
m3 -2 48.00 0.25 0.60 -14.40
eje 5 y 16 m3 -2 29.55 0.25 0.60 -8.87
Vigas de cimentacion
Eje 5 m3 -2 9.00 0.40 0.20 -1.44
Eje 8 m3 -2 9.00 0.40 0.20 -1.44
Eje 9 m3 -2 9.00 0.40 0.20 -1.44
Eje 12 m3 -2 9.00 0.40 0.20 -1.44
Eje 13 m3 -2 9.00 0.40 0.20 -1.44
Eje 16 m3 -2 9.00 0.40 0.20 -1.44
Eje A m3 -3 15.20 0.40 0.20 -3.65
Eje B m3 -3 15.20 0.40 0.20 -3.65
Eje C m3 -3 15.20 0.40 0.20 -3.65
Eje D m3 -3 15.20 0.40 0.20 -3.65
alimentacion de agua potable m3 -1 1.20 0.30 1.00 -0.36
buzones de desagues pluviales m3 -1 193.46 0.50 1.60 -154.77
Conexión desague aguas hervidas a tron m3 -1 193.46 0.50 1.60 -154.77
esponjamiento 30% 734.11 3181.14

03.00.00 OBRAS DE CONCRETO SIMPLE


03.01.00 Cimientos corridos de concreto 1:10 + 30% P.G
Cimientos
Entre Eje 2 y 3 m3 2 6.00 0.50 0.80 4.80
Entre Eje 5 y 6 m3 1 1.20 0.50 0.80 0.48
Entre Eje 6 y 7 m3 2 2.20 0.50 0.80 1.76
Entre Eje 7 y 8 m3 1 9.80 0.50 0.80 3.92
Entre Eje 9 y 10 m3 1 1.20 0.50 0.80 0.48
Entre Eje 10y 11 m3 2 2.20 0.50 0.80 1.76
Entre Eje 11 y 12 m3 1 6.40 0.50 0.80 2.56
Entre Eje 13 y 14 m3 1 2.40 0.50 0.80 0.96
Entre Eje 14 y 15 m3 1 1.20 0.50 0.80 0.48
Entre Eje 15 y 16 m3 1 1.20 0.50 0.80 0.48
Eje 17 m3 1 1.40 0.50 0.80 0.56
Eje 19 m3 1 1.40 0.50 0.80 0.56
Entre Eje 17 y 19 m3 1 3.60 0.50 0.80 1.44
m3 2 6.00 0.50 0.80 4.80
Entre Eje C y D m3 1 48.80 0.50 0.80 19.52
Entre Eje A y B m3 1 49.20 0.50 0.80 19.68 64.24

03.02.00 Solado f'c= 100kg/cm2 E = 4"


Zapatas
Z1 m3 1 48.10 7.00 336.70
Z2 m3 2 48.10 5.00 481.00
Z3 m3 1 10.80 7.00 75.60
Z4 m3 2 2.50 2.50 12.50
Z5 m3 4 2.80 2.80 31.36
Z6 m3 2 2.20 4.30 18.92 956.08

03.03.00 SOBRECIMIENTOS
03.03.01 Sobrecimiento, concreto 1:8 +25%P.M.
Encima de cimientos
Cimientos
Entre Eje 2 y 3 m3 2 6.00 0.10 0.40 0.48
Entre Eje 5 y 6 m3 1 1.20 0.10 0.40 0.05
Entre Eje 6 y 7 m3 2 2.20 0.10 0.40 0.18
Entre Eje 7 y 8 m3 1 9.80 0.10 0.40 0.39

Página 3 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Entre Eje 9 y 10 m3 1 1.20 0.10 0.40 0.05
Entre Eje 10y 11 m3 2 2.20 0.10 0.40 0.18
Entre Eje 11 y 12 m3 1 6.40 0.10 0.40 0.26
Entre Eje 13 y 14 m3 1 2.40 0.10 0.40 0.10
Entre Eje 14 y 15 m3 1 1.20 0.10 0.40 0.05
Entre Eje 15 y 16 m3 1 1.20 0.10 0.40 0.05
Eje 17 m3 1 1.40 0.10 0.40 0.06
Eje 19 m3 1 1.40 0.10 0.40 0.06
Entre Eje 17 y 19 m3 1 3.60 0.10 0.40 0.14
m3 2 6.00 0.10 0.40 0.48
Entre Eje C y D m3 1 48.80 0.10 0.40 1.95
Entre Eje A y B m3 1 49.20 0.10 0.40 1.97
Encima de losa de zapatas
Eje A m3 9 4.80 0.10 0.70 3.02
Eje B m3 1 46.30 0.10 0.70 3.24
Eje C m3 1 57.20 0.10 0.70 4.00
Eje D m3 9 4.80 0.10 0.70 3.02
m3 1 14.60 0.10 0.70 1.02 20.74
03.03.02 Sobrecimiento encofrado y desencofrado hasta 0.30mt
Entre Eje 2 y 3 m3 4 6.00 0.40 9.60
Entre Eje 5 y 6 m3 2 1.20 0.40 0.96
Entre Eje 6 y 7 m3 4 2.20 0.40 3.52
Entre Eje 7 y 8 m3 2 9.80 0.40 7.84
Entre Eje 9 y 10 m3 2 1.20 0.40 0.96
Entre Eje 10y 11 m3 4 2.20 0.40 3.52
Entre Eje 11 y 12 m3 2 6.40 0.40 5.12
Entre Eje 13 y 14 m3 2 2.40 0.40 1.92
Entre Eje 14 y 15 m3 2 1.20 0.40 0.96
Entre Eje 15 y 16 m3 2 1.20 0.40 0.96
Eje 17 m3 2 1.40 0.40 1.12
Eje 19 m3 2 1.40 0.40 1.12
Entre Eje 17 y 19 m3 2 3.60 0.40 2.88
m3 4 6.00 0.40 9.60
Entre Eje C y D m3 2 48.80 0.40 39.04
Entre Eje A y B m3 2 49.20 0.40 39.36
Encima de losa de zapatas
Eje A m3 18 4.80 0.70 60.48
Eje B m3 2 46.30 0.70 64.82
Eje C m3 2 57.20 0.70 80.08
Eje D m3 18 4.80 0.70 60.48
m3 2 14.60 0.70 20.44 414.78

04.00.00 OBRAS DE CONCRETO ARMADO


04.01.00 ZAPATAS
04.01.01 Concreto F'c=210 Kg/cm2
Zapatas
Z1 m3 1 48.10 7.00 0.60 202.02
Z2 m3 2 48.10 5.00 0.60 288.60
Z3 m3 1 10.80 7.00 0.60 45.36
Z4 m3 2 2.50 2.50 0.60 7.50
Z5 m3 4 2.80 2.80 0.60 18.82
Z6 m3 2 2.20 4.30 0.60 11.35 573.65
04.01.02 Acero F'y=4,200 Kg/cm2 cant. Var largo conversion
Z1 (fierro de 5/8") Kg 3 77 6.80 1.60 2513.28
Kg 3 87 15.90 1.60 6639.84
Z2 (fierro de 5/8") Kg 6 77 4.80 1.60 3548.16
Kg 6 30 15.90 1.60 4579.20
Z3 (fierro de 5/8") Kg 1 48 6.80 1.60 522.24
Kg 1 35 10.80 1.60 604.80
Z4 (fierro de 1/2") Kg 2 16 2.40 1.02 78.34
Kg 2 16 2.40 1.02 78.34
Z5 (fierro de 1/2") Kg 4 18 2.70 1.02 198.29
Kg 4 18 2.70 1.02 198.29
Z6 (fierro de 1/2") Kg 2 14 4.20 1.02 119.95
Kg 2 28 2.10 1.02 119.95
Alambre N° 16 Kg 1 960.03 20160.71

04.02.00 VIGAS DE CIMENTACION


04.02.01 Concreto F'c=210 Kg/cm2 m3
VC ejes 5 y 8 entre a A-B y C-D m3 4 9.00 0.40 0.60 8.64
VC ejes 9 y 12 entre a A-B y C-D m3 4 9.00 0.40 0.60 8.64
VC ejes 13 y 16 entre a A-B y C-D m3 4 9.00 0.40 0.60 8.64
VC ejes A entre a 5-16 m3 9 4.80 0.40 0.60 10.37
VC ejes B entre a 5-16 m3 9 4.80 0.40 0.60 10.37
VC ejes C entre a 5-16 m3 9 4.80 0.40 0.60 10.37
VC ejes D entre a 5-16 m3 9 4.80 0.40 0.60 10.37 67.39
04.02.02 Encofrado y desencofrado
VC ejes 5 y 8 entre a A-B y C-D m2 8 9.00 0.60 43.20
VC ejes 9 y 12 entre a A-B y C-D m2 8 9.00 0.60 43.20

Página 4 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
VC ejes 13 y 16 entre a A-B y C-D m2 8 9.00 0.60 43.20
VC ejes A entre a 5-16 m2 18 4.80 0.60 51.84
VC ejes B entre a 5-16 m2 18 4.80 0.60 51.84
VC ejes C entre a 5-16 m2 18 4.80 0.60 51.84
VC ejes D entre a 5-16 m2 18 4.80 0.60 51.84 336.96
04.02.03 Acero F'y=4,200 Kg/cm2 cant. Var largo conversion
VC ejes 5 y 8 (ø3/4") Kg 4 8.00 9.90 2.24 709.63
VC ejes 5 y 8 (ø5/8") Kg 4 10.00 4.20 1.60 268.80
VC ejes 5 y 8 (ø3/4") Kg 4 3.00 4.40 2.24 118.27
VC ejes 5 y 8 (ø5/8") Kg 4 1.00 4.40 1.60 28.16
Estribos (ø3/8") Kg 4 44 1.80 0.60 190.08
VC ejes 9 y 12(ø3/4") Kg 4 8.00 9.90 2.24 709.63
VC ejes 9 y 12(ø5/8") Kg 4 10.00 4.20 1.60 268.80
VC ejes 9 y 12(ø3/4") Kg 4 3.00 4.40 2.24 118.27
VC ejes 9 y 12(ø5/8") Kg 4 1.00 4.40 1.60 28.16
Estribos (ø3/8") Kg 4 44 1.80 0.60 190.08
VC ejes 13 y 16 (ø3/4") Kg 4 8.00 9.90 2.24 709.63
VC ejes 13 y 16 (ø5/8") Kg 4 10.00 4.20 1.60 268.80
VC ejes 13 y 16 (ø3/4") Kg 4 3.00 4.40 2.24 118.27
VC ejes 13 y 16 (ø5/8") Kg 4 1.00 4.40 1.60 28.16
Estribos (ø3/8") Kg 4 44 1.80 0.60 190.08
VC ejes A entre 5-16 (ø3/4") Kg 9 8.00 6.00 2.24 967.68
VC ejes A entre 5-16 (ø5/8") Kg 9 10.00 2.00 1.60 288.00
VC ejes A entre 5-16 (ø3/4") Kg 9 3.00 2.60 2.24 157.25
VC ejes A entre 5-16 (ø5/8") Kg 9 1.00 2.60 1.60 37.44
Estribos (ø3/8") Kg 9 29 1.80 0.60 281.88
VC ejes B entre 5-16 (ø3/4") Kg 9 8.00 6.00 2.24 967.68
VC ejes B entre 5-16 (ø5/8") Kg 9 10.00 2.00 1.60 288.00
VC ejes B entre 5-16 (ø3/4") Kg 9 3.00 2.60 2.24 157.25
VC ejes B entre 5-16 (ø5/8") Kg 9 1.00 2.60 1.60 37.44
Estribos (ø3/8") Kg 9 29 1.80 0.60 281.88
VC ejes C entre 5-16 (ø3/4") Kg 9 8.00 6.00 2.24 967.68
VC ejes C entre 5-16 (ø5/8") Kg 9 10.00 2.00 1.60 288.00
VC ejes C entre 5-16 (ø3/4") Kg 9 3.00 2.60 2.24 157.25
VC ejes C entre 5-16 (ø5/8") Kg 9 1.00 2.60 1.60 37.44
Estribos (ø3/8") Kg 9 29 1.80 0.60 281.88
VC ejes D entre 5-16 (ø3/4") Kg 9 8.00 6.00 2.24 967.68
VC ejes D entre 5-16 (ø5/8") Kg 9 10.00 2.00 1.60 288.00
VC ejes D entre 5-16 (ø3/4") Kg 9 3.00 2.60 2.24 157.25
VC ejes D entre 5-16 (ø5/8") Kg 9 1.00 2.60 1.60 37.44
Estribos (ø3/8") Kg 9 29 1.80 0.60 281.88
Alambre N° 16 Kg 1 543.69 11417.52

04.03.00 COLUMNAS
04.03.01 Concreto F'c=210 Kg/cm2
1er. Piso
Columna 1 m3 12 0.80 0.40 4.30 16.51
Columna 2 m3 12 0.80 0.40 4.30 16.51
Columna 3 m3 12 0.80 0.40 4.30 16.51
Columna 4 m3 12 0.80 0.40 4.30 16.51
Columna 5 m3 2 0.80 0.40 4.30 2.75
Columna 6 m3 4 0.50 0.25 4.30 2.15
m3 4 0.25 0.25 4.30 1.08
Columna 7 m3 6 0.80 0.40 4.30 8.26
2do.Piso
Columna 1 m3 12 0.80 0.40 2.60 9.98
Columna 2 m3 12 0.80 0.40 5.00 19.20
Columna 3 m3 12 0.80 0.40 5.00 19.20
Columna 4 m3 12 0.80 0.40 2.60 9.98
Columna 5 m3 2 0.80 0.40 5.00 3.20
Columna 6 m3 4 0.50 0.25 4.40 2.20
m3 4 0.25 0.25 4.40 1.10
Columna 7 m3 6 0.80 0.40 5.00 9.60
Cisterna
C-1 m3 4 0.25 0.25 11.50 2.88 157.62
04.03.02 Encofrado y Desencofrado
1er. Piso
Columna 1 m2 12 2.40 4.30 123.84
Columna 2 m2 12 2.40 4.30 123.84
Columna 3 m2 12 2.40 4.30 123.84
Columna 4 m2 12 2.40 4.30 123.84
Columna 5 m2 2 2.40 4.30 20.64
Columna 6 m2 4 1.50 4.30 25.80
m2 4 1.00 4.30 17.20
Columna 7 m2 6 2.40 4.30 61.92
2do.Piso
Columna 1 m2 12 2.40 2.60 74.88
Columna 2 m2 12 2.40 5.00 144.00
Columna 3 m2 12 2.40 5.00 144.00

Página 5 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Columna 4 m2 12 2.40 2.60 74.88
Columna 5 m2 2 2.40 5.00 24.00
Columna 6 m2 4 2.40 4.40 42.24
m2 4 1.50 4.40 26.40
Columna 7 m2 6 1.00 5.00 30.00

C-1 m2 4 1.00 11.50 46.00 1227.32

04.03.03 Acero F'y=4,200 Kg/cm2 cant. Var largo conversion


Columna 1 (ø3/4") Kg 12 14 7.70 2.24 2891.20
Estribos (ø3/8") Kg 12 63 2.60 0.60 1179.36
Columna 2 (ø3/4") Kg 12 14 11.10 2.24 4167.83
Estribos (ø3/8") Kg 12 78 2.60 0.60 1460.16
Columna 3 (ø3/4") Kg 12 18 11.10 2.24 5358.64
Estribos (ø3/8") Kg 12 78 2.60 0.60 1460.16
Columna 4 (ø3/4") Kg 12 10 7.70 2.24 2065.14
Columna 4 (ø5/8") Kg 12 8 7.70 1.60 1182.72
Estribos (ø3/8") Kg 14 63 2.60 0.60 1375.92
Columna 5 (ø3/4") Kg 2 10 11.10 2.24 496.17
Columna 5 (ø5/8") Kg 2 8 11.10 1.60 284.16
Estribos (ø3/8") Kg 2 78 2.60 0.60 243.36
Columna 6 (ø5/8") Kg 4 12 11.10 1.60 852.48
Estribos (ø3/8") Kg 4 78 2.60 0.60 486.72
Columna 7 (ø5/8") Kg 6 14 11.10 1.60 1491.84
Estribos (ø3/8") Kg 6 78 2.60 0.60 730.08
Cisterna
C-1 (ø3/4") Kg 4 4 13.5 2.24 482.76
Estribos (ø3/8") Kg 4 92 1.40 0.60 309.12
Alambre N° 16 Kg 1 1325.89 27843.70

04.04.00 PLACAS DE CONCRETO EXPUESTO


04.04.01 Concreto F'c=210 Kg/cm2
Parasoles
general m3 48 1.13 0.10 6.80 36.72
Placas en bateria de baños y escalera
m3 2 3.90 0.30 10.10 23.63
Placas en montacarga
m3 2 0.65 0.20 11.10 2.89
m3 2 1.20 0.20 11.60 5.57
m3 1 2.20 0.20 11.60 5.10
m3 1 1.60 1.60 0.20 0.51 74.42
04.04.02 Encofrado y Desencofrado con bastidores triplay y tramado modular
Parasoles
general m2 48 2.46 6.80 802.94
Placas en escalera
m2 2 8.40 10.10 169.68
Placas en montacarga
m2 2 1.30 11.10 28.86
m2 2 2.40 11.60 55.68
m2 1 4.40 11.60 51.04 1108.20

04.04.03 Acero F'y=4,200 Kg/cm2 cant. Var largo conversion


Parasoles
fierro (ø1/2") Kg 48 7 4.60 1.02 1576.51
fierro (ø3/8") Kg 48 20 1.42 0.60 817.92
Placas en escalera
Base (ø1/2") Kg 2 26 10.80 1.02 572.83
estribos (ø3/8") Kg 2 66 8.80 0.60 696.96
Alambre N° 16 Kg 1 183.21
Placas en montacarga
Base (ø3/8") Kg 1 24 2.35 0.60 33.84
Laterales (ø3/8") Kg 2 55 0.65 0.60 42.90
Kg 2 3 11.10 0.60 39.96
Kg 2 58 2.40 0.60 167.04
Kg 2 12 11.60 0.60 167.04
Kg 1 58 4.40 0.60 153.12
Kg 1 22 11.60 0.60 153.12
Alambre N° 16 Kg 1 81.86 4686.31

04.05.00 MESAS DE CONCRETO Y FILTROS - BUZONES


04.05.01 Concreto F'c=175 Kg/cm2
1ER PISO Y 2DO PISO
Mesas corridas m3 20 4.50 0.10 0.90 8.10
bases de mesas m3 20 4.50 0.10 0.90 8.10
m3 20 4.50 0.10 0.70 6.30
TECNOLOGIA DE LA MADERA
Mesas de trabajo m3 2 4.80 0.10 0.70 0.67
bases de mesas m3 5 0.60 0.10 0.90 0.27
m3 1 2.30 0.10 0.70 0.16

Página 6 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
bases de mesas m3 3 0.60 0.10 0.90 0.16
m3 1 3.00 0.10 0.70 0.21
bases de mesas m3 4 0.60 0.10 0.90 0.22
ANATOMIA DE LA VEREDA
Mesas de trabajo m3 1 4.80 0.10 0.70 0.34
bases de mesas m3 5 0.60 0.10 0.90 0.27
m3 1 6.50 0.10 0.90 0.59
bases de mesas m3 7 0.70 0.10 0.90 0.44
FISIOLOGIA VEGETAL
Mesas de trabajo m3 1 6.80 0.10 0.60 0.41
bases de mesas m3 7 0.50 0.10 0.90 0.32
SUELOS
Mesas de trabajo m3 1 2.50 0.10 1.20 0.30
bases de mesas m3 3 1.00 0.10 0.90 0.27
m3 1 3.00 0.10 1.20 0.36
bases de mesas m3 4 1.00 0.10 0.90 0.36
m3 2 2.20 0.10 0.50 0.22
bases de mesas m3 4 0.40 0.10 0.90 0.14
m3 2 0.80 0.10 0.60 0.10
bases de mesas m3 3 0.50 0.10 0.90 0.14
Tanque de neutralizacion y sedimentacion
bases m3 1 2.80 1.40 0.10 0.39
tapa m3 1 2.80 1.40 0.10 0.39
lateral m3 2 2.80 1.60 0.10 0.90
m3 2 1.40 1.60 0.10 0.45
Tanque de control y evacuación
bases m3 1 1.20 1.20 0.10 0.14
tapa m3 1 1.20 1.20 0.10 0.14
lateral m3 2 1.20 1.80 0.10 0.43
m3 2 1.20 1.80 0.10 0.43
Buzon de desague
bases m3 3 1.50 1.50 0.10 0.68
tapa m3 3 1.50 1.50 0.10 0.68
lateral m3 6 1.50 1.80 0.10 1.62
m3 6 1.50 1.80 0.10 1.62 36.30

04.05.02 Encofrado y Desencofrado de mesas de concreto


1ER PISO Y 2DO PISO
Mesas corridas m2 20 4.50 0.90 81.00
bases de mesas m2 40 4.50 0.90 162.00
m2 40 4.50 0.70 126.00
TECNOLOGIA DE LA MADERA
Mesas de trabajo m2 2 4.80 0.70 6.72
bases de mesas m2 10 0.60 0.90 5.40
m2 2 2.30 0.70 3.22
bases de mesas m2 6 0.60 0.90 3.24
m2 2 3.00 0.70 4.20
bases de mesas m2 8 0.60 0.90 4.32
ANATOMIA DE LA VEREDA
Mesas de trabajo m2 1 4.80 0.70 3.36
bases de mesas m2 10 0.60 0.90 5.40
m2 2 6.50 0.90 11.70
bases de mesas m2 14 0.70 0.90 8.82
FISIOLOGIA VEGETAL
Mesas de trabajo m2 1 6.80 0.60 4.08
bases de mesas m2 14 0.50 0.90 6.30
SUELOS
Mesas de trabajo m2 1 2.50 1.20 3.00
bases de mesas m2 6 1.00 0.90 5.40
m2 2 3.00 1.20 7.20
bases de mesas m2 8 1.00 0.90 7.20
m2 4 2.20 0.50 4.40
bases de mesas m2 8 0.40 0.90 2.88
m2 4 0.80 0.60 1.92
bases de mesas m2 6 0.50 0.90 2.70
SUM (baños)
Tablero de Concreto m2 1 1.30 0.50 0.65
bases de mesas m2 4 0.40 0.90 1.44
m2 2 0.90 0.50 0.90
bases de mesas m2 4 0.40 0.90 1.44
Bateria de Baños m2 4 2.50 0.50 5.00
bases de mesas m2 6 0.40 0.90 2.16
m2 4 4.80 0.50 9.60
bases de mesas m2 10 0.40 0.90 3.60
Tanque de neutralizacion y sedimentacion
bases m2 1 2.80 1.40 3.92
tapa m2 1 2.80 1.40 3.92
lateral m2 2 2.80 1.60 8.96
m2 2 1.40 1.60 4.48

Página 7 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Tanque de control y evacuación
bases m2 1 1.20 1.20 1.44
tapa m2 1 1.20 1.20 1.44
lateral m2 2 1.20 1.80 4.32
m2 2 1.20 1.80 4.32
Buzon de desague
bases m2 3 1.50 1.50 6.75
tapa m2 3 1.50 1.50 6.75
lateral m2 6 1.50 1.80 16.20
m2 6 1.50 1.80 16.20 573.95

04.05.03 Acero F'y=4,200 Kg/cm2 cant. Var largo conversion


Verticales (ø1/2") Kg 20 19 1.40 1.02 542.64
horizontales (ø1/2") Kg 20 4.00 4.00 1.02 326.40
Mesa (ø1/2") Kg 20 19 0.90 1.02 348.84
Kg 20 6 4.00 1.02 489.60
Base (ø1/2") Kg 20 19 0.60 1.02 232.56
Kg 20 6 4.00 1.02 489.60
Otras mesas de trabajo
mesas de trabajo (1/2") Kg 5 4 4.80 1.02 97.92
Kg 5 32 0.70 1.02 114.24
bases (1/2") Kg 22 3 0.90 1.02 60.59
Kg 22 6 0.50 1.02 67.32
Tanque de neutralizacion y sedimentacion
bases (3/8") Kg 1 9 1.80 0.60 9.72
Kg 1 4 3.10 0.60 7.44
tapa (3/8) Kg 1 9 1.80 0.60 9.72
Kg 1 4 3.10 0.60 7.44
lateral (3/8) Kg 1 9 2.00 0.60 10.80
Kg 1 4 3.10 0.60 7.44
lateral (3/8) Kg 1 9 2.00 0.60 10.80
Kg 1 4 3.10 0.60 7.44
Tanque de control y evacuación
bases (3/8") Kg 1 4 1.60 0.60 3.84
Kg 1 4 1.60 0.60 3.84
tapa (3/8) Kg 1 4 1.60 0.60 3.84
Kg 1 4 1.60 0.60 3.84
lateral (3/8) Kg 1 4 2.20 0.60 5.28
Kg 1 4 1.60 0.60 3.84
lateral (3/8) Kg 1 4 2.20 0.60 5.28
Kg 1 4 1.60 0.60 3.84
Alambre N° 16 Kg 1 143.71 3017.81

04.06.00 VIGAS
04.06.01 Vigas concreto F'c=210 Kg/cm2
1er. Piso
Eje 2 y 4
V-P 106 (0.40x0.90) m3 2 5.80 0.40 0.90 4.18
Eje 3
VP. 107 (0.40X0.90) m3 1 5.80 0.40 0.90 2.09
Eje 5 y 16
VP. 102* (0.40X0.90) m3 2 27.30 0.40 0.90 19.66
Eje 8, 9, 12 y 13
VP. 102 (0.40X0.90) m3 4 25.40 0.40 0.90 36.58
Eje 6, 10, 11 y 15
VP. 101* (0.40X0.90) m3 4 27.30 0.40 0.90 39.31
Eje 7 y 14
VP. 101 (0.40X0.90) m3 2 25.40 0.40 0.90 18.29
Eje 17 y 19
VP. 111 (0.35X0.70) m3 2 10.10 0.35 0.70 4.95
Eje 16
VS (0.15x0.25) m3 1 5.40 0.15 0.25 0.20
Eje A
VP. 103 (0.30x0.60) m3 1 48.10 0.30 0.60 8.66
VS. (0.15x0.25) m3 3 5.60 0.15 0.25 0.63
Eje B
VP. 104 (0.30x0.60) m3 1 64.20 0.30 0.60 11.56
VP. 110 (0.35x0.70) m3 1 9.60 0.35 0.70 2.35
Eje C
VP. 104 (0.30x0.60) m3 1 64.20 0.30 0.60 11.56
VP. 109 (0.35x0.70) m3 1 9.60 0.35 0.70 2.35
Eje D
VP. 103 (0.30x0.60) m3 1 48.20 0.30 0.60 8.68
VS. (0.15x0.25) m3 3 4.80 0.35 0.70 3.53
Entre Eje C y D
VP. 108 (0.35x0.70) m3 1 7.40 0.35 0.70 1.81
VS. (0.15x0.25) m3 3 4.80 0.15 0.25 0.54
VS. (0.15x0.25) Ductos m3 3 1.70 0.15 0.25 0.19
VS. (0.15x0.25) Ducto baño m3 1 4.20 0.15 0.25 0.16

Página 8 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Entre Eje B y C
VS. (0.15x0.25) m3 3 4.80 0.15 0.25 0.54
Entre Eje A y B
VS. (0.15x0.25) Ductos m3 3 1.70 0.15 0.25 0.19
2do. Piso
Eje 2 y 4
V-P 206 (0.35x0.70) m3 2 6.00 0.35 0.70 2.94
Eje 3
VP. 207 (0.35X0.70) m3 1 6.00 0.35 0.70 1.47
Eje 5 al 16
VP. 201*, 202*, 201 y 202 (0.40X0.90) m3 12 29.40 0.40 0.90 127.01
Eje 17 y 19
VP. 211 (0.35X0.70) m3 2 10.20 0.35 0.70 5.00
Eje 18
VCH. 1 (0.30X0.25) m3 1 5.80 0.30 0.25 0.44
Entre eje 2 y 3
VS. (0.15x0.25) m3 2 5.80 0.15 0.25 0.44
VCH. 1 (0.30X0.25) m3 1 5.80 0.30 0.25 0.44
Entre eje 16 y 17
VS. (0.15x0.25) m3 1 5.80 0.15 0.25 0.22
Entre eje 17 y 18
VS. (0.15x0.25) m3 1 5.80 0.15 0.25 0.22
Entre eje 18 y 19
VS. (0.15x0.25) m3 1 5.80 0.15 0.25 0.22
Eje A
VP. 203 (0.30x0.60) m3 1 48.10 0.30 0.60 8.66
VC. (0.60x1.10) m3 1 48.10 0.15 1.70 12.27
Eje B
VP. 205 (0.30x0.60) m3 1 16.00 0.30 0.60 2.88
VP. 204 (0.35x0.60) m3 3 16.00 0.35 0.60 10.08
Eje C
VP. 205 (0.30x0.60) m3 1 16.00 0.30 0.60 2.88
VP. 204 (0.35x0.60) m3 3 16.00 0.35 0.60 10.08
Eje D
VP. 203 (0.30x0.60) m3 1 48.20 0.30 0.60 8.68
VC. (0.60x1.10) m3 1 48.20 0.60 1.10 31.81
Entre Eje A y B
VS. (0.15x0.25) m3 2 4.20 0.15 0.25 0.32
VS. (0.15x0.25) m3 1 4.20 0.15 0.25 0.16
Entre Eje C y D
VP. 208 (0.35X0.70) m3 1 7.20 0.35 0.70 1.76
VS. (0.15x0.25) Ductos m3 3 1.70 0.15 0.25 0.19
VS. (0.15x0.25) Ducto baño m3 1 4.20 0.15 0.25 0.16
Entre Eje A y B
VS. (0.15x0.25) Ductos m3 3 1.70 0.15 0.25 0.19
Tanque elevado
VA (0.25x 0.30) m3 8 3.30 0.25 0.30 1.98
VA (0.25x 0.40) m3 4 3.30 0.25 0.40 1.32 409.77

04.06.02 Encofrado y Desencofrado


1er. Piso
Eje 2 y 4
V-P 106 (0.40x0.90) m2 2 5.80 2.20 25.52
Eje 3
VP. 107 (0.40X0.90) m2 1 5.80 2.20 12.76
Eje 5 y 16
VP. 102* (0.40X0.90) m2 2 27.30 2.20 120.12
Eje 8, 9, 12 y 13
VP. 102 (0.40X0.90) m2 4 25.40 2.20 223.52
Eje 6, 10, 11 y 15
VP. 101* (0.40X0.90) m2 4 27.30 2.20 240.24
Eje 7 y 14
VP. 101 (0.40X0.90) m2 2 25.40 2.20 111.76
Eje 17 y 19
VP. 111 (0.35X0.70) m2 2 10.10 1.75 35.35
Eje 16
VS (0.15x0.25) m2 1 5.40 0.65 3.51
Eje A
VP. 103 (0.30x0.60) m2 1 48.10 1.50 72.15
VS. (0.15x0.25) m2 3 5.60 0.65 10.92
Eje B m2
VP. 104 (0.30x0.60) m2 1 64.20 1.50 96.30
VP. 110 (0.35x0.70) m2 1 9.60 1.75 16.80
Eje C m2
VP. 104 (0.30x0.60) m2 1 64.20 1.50 96.30
VP. 109 (0.35x0.70) m2 1 9.60 1.75 16.80
Eje D m2
VP. 103 (0.30x0.60) m2 1 48.20 1.50 72.30
VS. (0.15x0.25) m2 3 4.80 1.75 25.20

Página 9 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Entre Eje C y D m2
VP. 108 (0.35x0.70) m2 1 7.40 1.75 12.95
VS. (0.15x0.25) m2 3 4.80 0.65 9.36
VS. (0.15x0.25) Ductos m2 3 1.70 0.65 3.32
VS. (0.15x0.25) Ducto baño m2 1 4.20 0.65 2.73
Entre Eje B y C m2
VS. (0.15x0.25) m2 3 4.80 0.65 9.36
Entre Eje A y B m2
VS. (0.15x0.25) Ductos m2 3 1.70 0.65 3.32
2do. Piso m2
Eje 2 y 4 m2
V-P 206 (0.35x0.70) m2 2 5.80 1.75 20.30
Eje 3 m2
VP. 207 (0.35X0.70) m2 1 5.80 1.75 10.15
Eje 5 al 16 m2
VP. 201*, 202*, 201 y 202 (0.40X0.90) m2 12 29.40 2.20 776.16
Eje 17 y 19 m2
VP. 211 (0.35X0.70) m2 2 10.20 1.75 35.70
Eje 18 m2
VCH. 1 (0.30X0.25) m2 1 5.80 0.65 3.77
Entre eje 2 y 3 m2
VS. (0.15x0.25) m2 2 5.80 0.65 7.54
VCH. 1 (0.30X0.25) m2 1 5.80 0.65 3.77
Entre eje 16 y 17 m2
VS. (0.15x0.25) m2 1 5.80 0.65 3.77
Entre eje 17 y 18 m2
VS. (0.15x0.25) m2 1 5.80 0.65 3.77
Entre eje 18 y 19 m2
VS. (0.15x0.25) m2 1 5.80 0.65 3.77
Eje A m2
VP. 203 (0.30x0.60) m2 1 48.10 1.50 72.15
VC. (0.60x1.10) m2 1 48.10 2.80 134.68
Eje B m2
VP. 205 (0.30x0.60) m2 1 16.00 1.50 24.00
VP. 204 (0.35x0.60) m2 3 16.00 1.55 74.40
Eje C m2
VP. 205 (0.30x0.60) m2 1 16.00 1.50 24.00
VP. 204 (0.35x0.60) m2 3 16.00 1.55 74.40
Eje D m2
VP. 203 (0.30x0.60) m2 1 48.20 1.50 72.30
VC. (0.60x1.10) m2 1 48.20 2.80 134.96
Entre Eje A y B m2
VS. (0.15x0.25) m2 2 4.20 0.15 1.26
VS. (0.15x0.25) m2 1 4.20 0.15 0.63
Entre Eje C y D m2
VP. 208 (0.35X0.70) m2 1 7.20 1.75 12.60
VS. (0.15x0.25) Ductos m2 3 1.70 0.65 3.32
VS. (0.15x0.25) Ducto baño m2 1 4.20 0.65 2.73
Entre Eje A y B m2
VS. (0.15x0.25) Ductos m2 3 1.70 0.65 3.32
Tanque elevado m2
VA (0.25x 0.30) m2 8 3.30 0.85 22.44
VA (0.25x 0.40) m2 4 3.30 1.05 13.86 2760.32

04.06.03 Acero F'y=4,200 Kg/cm2 Cant. long. kg/m


1er. Piso
Eje 2 y 4
VP 106 (ø3/4") Kg 2 8.00 6.70 2.24 240.13
VP 106 (ø3/4") Kg 2 2.00 4.40 2.24 39.42
VP 106 (ø5/8") Kg 2 1.00 5.50 1.60 17.60
Estribos (ø3/8") Kg 2 95.00 2.80 0.60 319.20
Eje 3
VP 107 (ø3/4") Kg 1 9.00 16.50 2.24 332.64
VP 107 (ø3/4") Kg 1 5.00 5.00 2.24 56.00
VP 107 (ø5/8") Kg 1 1.00 5.00 1.60 8.00
VP 107 (ø3/4") Kg 1 2.00 4.40 2.24 19.71
VP 107 (ø5/8") Kg 1 2.00 16.50 1.60 52.80
VP 107 (ø5/8") Kg 1 2.00 5.50 1.60 17.60
Estribos (ø3/8") Kg 1 95.00 2.80 0.60 159.60
Eje 5 y 16
VP 102* (ø3/4") Kg 2 6.00 28.20 2.24 758.02
VP 102* (ø5/8") Kg 2 2.00 28.20 1.60 180.48
VP 102* (ø3/4") Kg 2 8.00 5.00 2.24 179.20
VP 102* (ø5/8") Kg 2 4.00 5.00 1.60 64.00
VP 102* (ø5/8") Kg 2 2.00 4.40 1.60 28.16
VP 102* (ø3/4") Kg 4 2.00 5.00 2.24 89.60
VP 102* (ø5/8") Kg 4 1.00 2.50 1.60 16.00
Estribos (ø3/8") Kg 2 166.00 2.80 0.60 557.76
Eje 8, 9, 12 y 13

Página 10 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
VP 102 (ø3/4") Kg 4 6.00 26.30 2.24 1413.89
VP 102 (ø5/8") Kg 4 3.00 26.30 1.60 504.96
VP 102 (ø3/4") Kg 4 4.00 5.00 2.24 179.20
VP 102 (ø5/8") Kg 4 2.00 5.00 1.60 64.00
VP 102 (ø5/8") Kg 4 2.00 4.40 1.60 56.32
VP 102 (ø3/4") Kg 4 4.00 5.00 2.24 179.20
VP 102 (ø5/8") Kg 4 1.00 2.50 1.60 16.00
Estribos (ø3/8") Kg 4 166.00 2.80 0.60 1115.52
Eje 6, 10, 11 y 15
VP 101* (ø3/4") Kg 4 6.00 28.20 2.24 1516.03
VP 101* (ø5/8") Kg 4 2.00 28.20 1.60 360.96
VP 101* (ø3/4") Kg 4 10.00 5.00 2.24 448.00
VP 101* (ø5/8") Kg 4 4.00 5.00 1.60 128.00
VP 101* (ø3/4") Kg 4 4.00 4.40 2.24 157.70
VP 101* (ø3/4") Kg 4 6.00 5.00 2.24 268.80
VP 101* (ø3/4") Kg 4 3.00 2.50 2.24 67.20
Estribos (ø3/8") Kg 4 166.00 2.80 0.60 1115.52
Eje 7 y 14
VP 101 (ø3/4") Kg 2 7.00 26.30 2.24 824.77
VP 101 (ø5/8") Kg 2 2.00 26.30 1.60 168.32
VP 101 (ø3/4") Kg 2 4.00 5.00 2.24 89.60
VP 101 (ø5/8") Kg 2 2.00 5.00 1.60 32.00
VP 101 (ø3/4") Kg 2 6.00 4.40 2.24 118.27
VP 101 (ø3/4") Kg 2 4.00 5.00 2.24 89.60
VP 101 (ø3/4") Kg 2 3.00 2.50 2.24 33.60
Estribos (ø3/8") Kg 2 166.00 2.80 0.60 557.76
Eje 17 y 19
VP. 111 (0.35X0.70)
VP 111 (ø3/4") Kg 2 4.00 10.80 2.24 193.54
VP 111 (ø5/8") Kg 2 2.00 10.80 1.60 69.12
VP 111 (ø3/4") Kg 2 2.00 3.00 2.24 26.88
VP 111 (ø5/8") Kg 2 2.00 2.40 1.60 15.36
VP 111 (ø3/4") Kg 2 2.00 2.20 2.24 19.71
Estribos (ø3/8") Kg 2 74.00 2.80 0.60 248.64
Viga intermedia
VP 111 (ø3/4") Kg 2 4.00 5.80 2.24 103.94
VP 111 (ø5/8") Kg 2 2.00 5.80 1.60 37.12
Estribos (ø3/8") Kg 2 36.00 2.80 0.60 120.96
Eje 16
VP S (ø5/8") Kg 1 4.00 6.00 1.60 38.40
Estribos (ø3/8") Kg 1 36.00 1.00 0.60 21.60
Eje A
VP 103 (ø5/8") Kg 1 4.00 48.70 1.60 311.68
VP 103 (ø5/8") Kg 1 2.00 1.80 1.60 5.76
VP 103 (ø5/8") Kg 1 2.00 3.50 1.60 11.20
Estribos (ø3/8") Kg 1 118.00 2.00 0.60 141.60
VP S (ø5/8") Kg 3 4.00 6.20 1.60 119.04
Estribos (ø3/8") Kg 3 37.00 1.00 0.60 66.60
Eje B
VP 104 (ø5/8") Kg 1 4.00 60.00 1.60 384.00
VP 104 (ø5/8") Kg 1 2.00 1.80 1.60 5.76
VP 104 (ø5/8") Kg 1 2.00 3.50 1.60 11.20
Estribos (ø3/8") Kg 1 92.00 2.00 0.60 110.40
VP 110 (ø5/8") Kg 1 4.00 10.20 1.60 65.28
VP 110 (ø5/8") Kg 1 2.00 10.20 1.60 32.64
VP 110 (ø3/4") Kg 1 2.00 4.30 2.24 19.26
VP 110 (ø5/8") Kg 1 2.00 3.80 1.60 12.16
VP 110 (ø3/4") Kg 1 1.00 3.20 2.24 7.17
Estribos (ø3/8") Kg 1 55.00 2.30 0.60 75.90
Eje C
VP 104 (ø5/8") Kg 1 4.00 60.00 1.60 384.00
VP 104 (ø5/8") Kg 1 2.00 1.80 1.60 5.76
VP 104 (ø5/8") Kg 1 2.00 3.50 1.60 11.20
Estribos (ø3/8") Kg 1 92.00 2.00 0.60 110.40
VP 109 (ø3/4") Kg 1 2.00 10.30 2.24 46.14
VP 109 (ø5/8") Kg 1 2.00 10.30 1.60 32.96
VP 109 (ø3/4") Kg 1 2.00 4.30 2.24 19.26
VP 109 (ø5/8") Kg 1 2.00 4.30 1.60 13.76
VP 109 (ø3/4") Kg 1 2.00 3.80 2.24 17.02
Estribos (ø3/8") Kg 1 55.00 2.30 0.60 75.90
Eje D
VP 103 (ø5/8") Kg 1 4.00 48.80 1.60 312.32
VP 103 (ø5/8") Kg 1 2.00 1.80 1.60 5.76
VP 103 (ø5/8") Kg 1 2.00 3.50 1.60 11.20
Estribos (ø3/8") Kg 1 117.00 2.00 0.60 140.40
VS (ø5/8") Kg 3 4.00 5.40 1.60 103.68
Estribos (ø3/8") Kg 3 32.00 1.00 0.60 57.60
Entre Eje C y D
VP 108 (ø5/8") Kg 1 2.00 10.30 1.60 32.96

Página 11 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
VP 108 (ø5/8") Kg 1 2.00 10.30 1.60 32.96
VP 108 (ø5/8") Kg 1 2.00 4.30 1.60 13.76
VP 108 (ø5/8") Kg 1 1.00 4.30 1.60 6.88
VP 108 (ø3/4") Kg 1 2.00 3.80 2.24 17.02
Estribos (ø3/8") Kg 1 40.00 2.30 0.60 55.20
VS (ø5/8") Kg 3 4.00 5.40 1.60 103.68
Estribos (ø3/8") Kg 3 32.00 1.00 0.60 57.60
VS. (0.15x0.25) Ductos
VS (ø1/2") Kg 3 4.00 2.30 1.02 28.15
Estribos (ø3/8") Kg 3 11.00 1.00 0.60 19.80
VS. (0.15x0.25) Ducto baño
VS (ø1/2") Kg 1 4.00 4.80 1.02 19.58
Estribos (ø3/8") Kg 1 28.00 1.00 0.60 16.80
Entre Eje B y C
VS. (0.15x0.25)
VS (ø5/8") Kg 3 4.00 5.40 1.60 103.68
Estribos (ø3/8") Kg 3 32.00 1.00 0.60 57.60
Entre Eje A y B
VS. (0.15x0.25) Ductos
VS (ø1/2") Kg 3 4.00 2.30 1.02 28.15
Estribos (ø3/8") Kg 3 11.00 1.00 0.60 19.80
2do. Piso Cant. long. kg/m
Eje 2 y 4
VP 206 (ø5/8") Kg 2 6.00 7.40 1.60 142.08
VP 206 (ø5/8") Kg 2 2.00 7.40 1.60 47.36
Estribos (ø3/8") Kg 2 36.00 1.90 0.60 82.08
Eje 3
VP 207 (ø5/8") Kg 1 6.00 7.40 1.60 71.04
VP 207 (ø5/8") Kg 1 2.00 7.40 1.60 23.68
Estribos (ø3/8") Kg 1 36.00 1.90 0.60 41.04
Eje 5 y 16
VP 202* (ø3/4") Kg 2 4.00 29.40 2.24 526.85
VP 202* (ø5/8") Kg 2 2.00 29.40 1.60 188.16
VP 202* (ø3/4") Kg 2 8.00 5.00 2.24 179.20
VP 202* (ø5/8") Kg 2 4.00 5.00 1.60 64.00
VP 202* (ø5/8") Kg 2 2.00 4.40 1.60 28.16
VP 202* (ø3/4") Kg 4 2.00 5.00 2.24 89.60
VP 202* (ø5/8") Kg 4 1.00 2.50 1.60 16.00
Estribos (ø3/8") Kg 2 156.00 2.80 0.60 524.16
Eje 8, 9, 12 y 13
VP 202 (ø3/4") Kg 4 6.00 29.40 2.24 1580.54
VP 202 (ø5/8") Kg 4 3.00 29.40 1.60 564.48
VP 202 (ø3/4") Kg 4 4.00 5.00 2.24 179.20
VP 202 (ø5/8") Kg 4 2.00 5.00 1.60 64.00
VP 202 (ø5/8") Kg 4 2.00 4.40 1.60 56.32
VP 202 (ø3/4") Kg 4 4.00 5.00 2.24 179.20
VP 202 (ø5/8") Kg 4 1.00 2.50 1.60 16.00
Estribos (ø3/8") Kg 4 156.00 2.80 0.60 1048.32
Eje 6, 10, 11 y 15
VP 201* (ø3/4") Kg 4 6.00 29.40 2.24 1580.54
VP 201* (ø5/8") Kg 4 2.00 29.40 1.60 376.32
VP 201* (ø3/4") Kg 4 10.00 5.00 2.24 448.00
VP 201* (ø5/8") Kg 4 4.00 5.00 1.60 128.00
VP 201* (ø3/4") Kg 4 4.00 4.40 2.24 157.70
VP 201* (ø3/4") Kg 4 6.00 5.00 2.24 268.80
Estribos (ø3/8") Kg 4 156.00 2.80 0.60 1048.32
Eje 7 y 14
VP 101 (ø3/4") Kg 2 6.00 29.40 2.24 790.27
VP 101 (ø5/8") Kg 2 2.00 29.40 1.60 188.16
VP 101 (ø3/4") Kg 2 4.00 5.00 2.24 89.60
VP 101 (ø5/8") Kg 2 2.00 5.00 1.60 32.00
VP 101 (ø3/4") Kg 2 6.00 4.40 2.24 118.27
Estribos (ø3/8") Kg 2 156.00 2.80 0.60 524.16
Eje 17 y 19
VP 211 (ø5/8") Kg 2 8.00 10.80 1.60 276.48
Estribos (ø3/8") Kg 2 71.00 2.80 0.60 238.56
Eje 18
VCH.1 (ø5/8") Kg 1 4.00 6.05 1.60 38.72
Estribos (ø3/8") Kg 1 38.00 1.30 0.60 29.64
Entre eje 2 y 3
VS. (0.15x0.25)
VS (ø5/8") Kg 2 4.00 6.05 1.60 77.44
Estribos (ø3/8") Kg 2 38.00 1.00 0.60 45.60
VCH. 1 (0.30X0.25)
VCH (ø5/8") Kg 1 4.00 6.05 1.60 38.72
Estribos (ø3/8") Kg 1 38.00 1.00 0.60 22.80
Entre eje 16 y 17
VS. (0.15x0.25)
VS (ø5/8") Kg 1 4.00 6.05 1.60 38.72

Página 12 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Estribos (ø3/8") Kg 1 38.00 1.00 0.60 22.80
Entre eje 17 y 18
VS. (0.15x0.25)
VS (ø5/8") Kg 1 4.00 6.05 1.60 38.72
Estribos (ø3/8") Kg 1 38.00 1.00 0.60 22.80
Entre eje 18 y 19
VS. (0.15x0.25)
VS (ø5/8") Kg 1 4.00 6.05 1.60 38.72
Estribos (ø3/8") Kg 1 38.00 1.00 0.60 22.80
Eje A
VP. 203 (0.30x0.60)
VP 203 (ø5/8") Kg 2 4.00 48.70 1.60 623.36
Estribos (ø3/8") Kg 2 114.00 2.00 0.60 273.60
VC. (0.60x1.10)
VC (ø1/2") Kg 1 4.00 48.70 1.02 198.70
VC (ø1/2") verticales Kg 1 243.50 1.10 1.02 273.21
VC (ø1/2") horizontales Kg 1 7.33 48.70 1.02 364.28
Estribos (ø3/8") Kg 1 114.00 3.60 0.60 246.24
Eje B
VP. 205 (0.30x0.60)
VP 205 (ø5/8") Kg 1 4.00 16.60 1.60 106.24
Estribos (ø3/8") Kg 1 118.00 2.00 0.60 141.60
VP. 204 (0.35x0.60)
VP 204 (ø5/8") Kg 3 4.00 16.60 1.60 318.72
Estribos (ø3/8") Kg 3 118.00 2.00 0.60 424.80
Eje C
VP. 205 (0.30x0.60)
VP 205 (ø5/8") Kg 1 4.00 16.60 1.60 106.24
Estribos (ø3/8") Kg 1 118.00 2.00 0.60 141.60
VP. 204 (0.35x0.60)
VP 204 (ø5/8") Kg 3 4.00 16.60 1.60 318.72
Estribos (ø3/8") Kg 3 118.00 2.00 0.60 424.80
Eje D
VP. 203 (0.30x0.60)
VP 205 (ø5/8") Kg 1 4.00 48.70 1.60 311.68
Estribos (ø3/8") Kg 1 354.00 2.00 0.60 424.80
VC. (0.60x1.10)
VC (ø1/2") Kg 1 4.00 48.70 1.02 198.70
VC (ø1/2") verticales Kg 1 243.50 1.10 1.02 273.21
VC (ø1/2") horizontales Kg 1 7.33 48.70 1.02 364.28
Estribos (ø3/8") Kg 1 114.00 3.60 0.60 246.24
Entre Eje A y B
VS. (0.15x0.25)
VS (ø5/8") Kg 2 4.00 4.45 1.60 56.96
Estribos (ø3/8") Kg 2 28.00 1.00 0.60 33.60
VS. (0.15x0.25)
VS (ø5/8") Kg 1 4.00 4.45 1.60 28.48
Estribos (ø3/8") Kg 1 28.00 1.00 0.60 16.80
Entre Eje C y D
VP. 208 (0.35X0.70)
VP 208 (ø5/8") Kg 1 6.00 7.90 1.60 75.84
VP 208 (ø5/8") Kg 1 1.00 3.80 1.60 6.08
VP 208 (ø3/4") Kg 1 1.00 3.80 2.24 8.51
Estribos (ø3/8") Kg 1 40.00 2.30 0.60 55.20
VS. (0.15x0.25) Ductos
VS (ø1/2") Kg 3 4.00 2.30 1.02 28.15
Estribos (ø3/8") Kg 3 11.00 1.00 0.60 19.80
VS. (0.15x0.25) Ducto baño
VS (ø1/2") Kg 1 4.00 4.45 1.02 18.16
Estribos (ø3/8") Kg 1 28.00 1.00 0.60 16.80
Entre Eje A y B
VS. (0.15x0.25) Ductos
VS (ø1/2") Kg 3 4.00 2.30 1.02 28.15
Estribos (ø3/8") Kg 3 11.00 1.00 0.60 19.80
Tanque elevado
VA (0.25x 0.30)
VA (ø5/8") Kg 8 4.00 3.60 1.60 184.32
Estribos (ø3/8") Kg 8 20.00 1.30 0.60 124.80
VA (0.25x 0.40)
VA (ø5/8") Kg 4 4.00 3.60 1.60 92.16
Estribos (ø3/8") Kg 4 20.00 1.30 0.60 62.40
Alambre N° 16 Kg 1 253.48 253.48 36201.69

04.07.00 LOSAS ALIGERADAS


04.07.01 Concreto F'c=210 Kg/cm2
1er. Piso
bloque 01
entrepiso m3 1 10.80 5.20 0.05 2.81
viguetas m3 12 10.80 0.10 0.20 2.59

Página 13 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
bloque 02, 03 y 04
entrepiso m3 3 24.20 14.40 0.05 52.27
viguetas m3 162 14.40 0.10 0.20 46.66
ductos de iluminacion m3 -3 4.80 2.00 0.05 -1.44
viguetas m3 -5 4.80 0.10 0.20 -0.48
bloque 05
entrepiso m3 1 9.05 6.50 0.05 2.94
viguetas m3 21 6.50 0.10 0.20 2.73
Intermedia
bloque 05
entrepiso m3 1 4.40 6.50 0.05 1.43
viguetas m3 16 4.40 0.10 0.20 1.41
2do. Piso
bloque 01
entrepiso pasadizo m3 1 10.80 5.80 0.05 3.13
entrepiso escalera m3 1 4.20 6.00 0.05 1.26
viguetas pasadizo m3 12 10.80 0.10 0.20 2.59
viguetas escalera m3 13 4.20 0.10 0.20 1.09
bloque 02, 03 y 04
entrepiso m3 3 27.90 14.40 0.05 60.26
viguetas m3 177 16.05 0.10 0.20 56.82
techo de policarbonato m3 -3 16.05 4.30 0.05 -10.35
viguetas m3 -10 16.05 0.10 0.20 -3.21
bloque 05
entrepiso pasadizo m3 1 9.60 6.20 0.05 2.98
viguetas pasadizo m3 11 9.60 0.10 0.20 2.11
entrepiso baño m3 1 7.20 5.60 0.05 2.02
viguetas baño m3 11 7.20 0.10 0.20 1.58
entrepiso escalera m3 1 4.00 6.40 0.05 1.28
viguetas escalera m3 13 4.00 0.10 0.20 1.04 233.52

04.07.02 Encofrado y Desencofrado


1er. Piso
bloque 01
entrepiso m2 1 10.80 5.20 56.16
bloque 02, 03 y 04
entrepiso m2 3 24.20 14.40 1045.44
ductos de iluminacion m2 -3 4.80 2.00 -28.80
bloque 05
entrepiso m2 1 9.05 6.50 58.83
Intermedia
bloque 05
entrepiso m2 1 4.40 6.50 28.60
2do. Piso
bloque 01
entrepiso pasadizo m2 1 10.80 5.80 62.64
entrepiso escalera m2 1 4.20 6.00 25.20
bloque 02, 03 y 04
entrepiso m2 3 27.90 14.40 1205.28
techo de policarbonato m2 -3 16.05 4.30 -207.05
bloque 05
entrepiso pasadizo m2 1 9.60 6.20 59.52
entrepiso baño m2 1 7.20 5.60 40.32
entrepiso escalera m2 1 4.00 6.40 25.60 2371.74

04.07.03 Acero F'y=4,200 Kg/cm2 Cant. long. kg/m


1er. Piso
bloque 01
fierro (ø5/8") Kg 24 5.2 1.60 199.68
fierro (ø1/2") Kg 24 2.8 1.02 68.54
fierro (ø5/8") Kg 24 3.6 1.60 138.24
temperatura (ø1/4") Kg 36 5.8 0.25 52.20
bloque 02, 03 y 04
fierro (ø5/8") Kg 162 14.4 1.60 3732.48
fierro (ø1/2") Kg 324 2.8 1.02 925.34
fierro (ø5/8") Kg 324 2.1 1.60 1088.64
fierro (ø5/8") Kg 324 3.6 1.60 1866.24
temperatura (ø1/4") Kg 54 25 0.25 337.50
ductos (ø5/8") Kg -15 4.8 1.60 -115.20
volados (ø5/8") Kg 6 5.3 1.60 50.88
volados (ø5/8") Kg 12 2.1 1.60 40.32
Bloque 05
fierro (ø5/8") Kg 16 9.6 1.60 245.76
fierro (ø1/2") Kg 32 2.1 1.02 68.54
fierro (ø1/2") Kg 16 3.6 1.02 58.75
temperatura (ø1/4") Kg 37 7.20 0.25 66.60
fierro (ø5/8") Kg 16 10.1 1.60 258.56
fierro (ø1/2") Kg 32 2.1 1.02 68.54
temperatura (ø1/4") Kg 6 5.40 0.25 8.10

Página 14 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
Intermedia
bloque 05
fierro (ø5/8") Kg 16 7.61 1.60 194.82
temperatura (ø1/4") Kg 17 7.20 0.25 30.60
2do. Piso
bloque 01
fierro (ø1/2") Kg 12 10.8 1.02 132.19
fierro (ø1/2") Kg 12 2.6 1.02 31.82
fierro (ø5/8") Kg 12 3.6 1.60 69.12
temperatura (ø1/4") Kg 46 6.4 0.25 73.60
fierro (ø1/2") Kg 13 5.8 1.02 76.91
fierro (ø5/8") Kg 13 1.4 1.60 29.12
temperatura (ø1/4") Kg 16 6.6 0.25 26.40
bloque 02, 03 y 04
fierro (ø1/2") Kg 174 14.4 1.02 2555.71
fierro (ø1/2") Kg 324 2.8 1.02 925.34
fierro (ø5/8") Kg 324 2.1 1.60 1088.64
fierro (ø5/8") Kg 324 3.6 1.60 1866.24
temperatura (ø1/4") Kg 54 25 0.25 337.50
techo de policarbonato (ø5/8") Kg -30 16.05 1.60 -770.40
volados (ø5/8") Kg 18 5.3 1.60 152.64
volados (ø5/8") Kg 18 3.8 1.60 109.44
fierro (ø1/2") Kg 36 2.2 1.02 80.78
Bloque 05
fierro (ø5/8") Kg 16 9.6 1.60 245.76
fierro (ø1/2") Kg 32 2.1 1.02 68.54
fierro (ø1/2") Kg 16 3.6 1.02 58.75
temperatura (ø1/4") Kg 37 7.20 0.25 66.60
fierro (ø5/8") Kg 16 10.7 1.60 273.92
fierro (ø1/2") Kg 32 2.1 1.02 68.54
temperatura (ø1/4") Kg 6 5.40 0.25 8.10
Alambre N° 16 Kg 1 848.02 17808.45

04.07.04 Bloque de ladrillo .30x.30x.20


1er. Piso
bloque 01
entrepiso und 1 10.80 5.00 9.00 486.00
bloque 02, 03 y 04
entrepiso und 3 24.20 14.85 9.00 9702.99
ductos de iluminacion und -3 4.80 2.00 9.00 -259.20
bloque 05
entrepiso und 1 9.05 6.50 9.00 529.43
Intermedia
bloque 05
entrepiso und 1 3.70 6.50 9.00 216.45
2do. Piso
bloque 01
entrepiso pasadizo und 1 10.80 5.00 9.00 486.00
entrepiso escalera und 1 4.20 5.00 9.00 189.00
bloque 02, 03 y 04
entrepiso und 3 24.20 15.25 9.00 9964.35
techo de policarbonato und -3 16.05 4.30 9.00 -1863.41
bloque 05
entrepiso pasadizo und 1 9.05 5.50 9.00 447.98
entrepiso baño und 1 6.50 4.90 9.00 286.65
entrepiso escalera und 1 4.00 6.40 9.00 230.40 20416.64

04.08.00 ESCALERA
04.08.01 Concreto F'c=210 Kg/cm2
tramo 01 m3 2 4.90 1.80 0.25 4.41
descanso m3 2 1.90 3.80 0.25 3.61
tramo 02 m3 2 4.90 1.80 0.25 4.41
pasos m3 54 0.05 2.00 1.46 13.89
04.08.02 Encofrado y Desencofrado
tramo 01 m2 2 4.90 2.60 25.48
descanso m2 2 1.90 4.40 16.72
tramo 02 m2 2 4.90 2.30 22.54
pasos m2 54 1.80 0.25 24.30 89.04
04.08.03 Acero F'y=4,200 Kg/cm2 Cant. long. kg/m
tramo 01
fierro (ø1/2") Kg 2 14.39 1.02 29.36
malla (ø3/8") Kg 2 48 1.80 0.60 103.68
malla (ø3/8") Kg 2 18 4.00 0.60 86.40
tramo 02
fierro (ø1/2") Kg 2 15.9 1.02 32.44
malla (ø3/8") Kg 2 40 1.80 0.60 86.40
Alambre N° 16 Kg 1 16.91 355.19

04.09.00 TANQUE CISTERNA Y ELEVADO

Página 15 Estructuras
ELEMENTO DIMENSIONES METRADO
PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL
04.09.01 Concreto F'c=210 Kg/cm2
Tanque Cisterna
placas laterales m3 4 2.40 3.30 0.25 7.92
base m3 1 4.20 4.20 0.35 6.17
tapa m3 1 3.30 3.30 0.25 2.72
Tanque elevado
placas laterales m3 4 1.05 3.00 0.15 1.89
base m3 1 3.30 3.30 0.20 2.18
tapa m3 1 3.30 3.30 0.15 1.63
ingreso para limpieza m3 4 0.60 0.35 0.15 0.13
m3 1 0.80 0.80 0.15 0.10 22.74
04.09.02 Encofrado y Desencofrado
Tanque Cisterna
placas laterales m2 8 2.40 3.30 63.36
base m2 1 4.20 4.20 17.64
tapa m2 1 3.30 3.30 10.89
Tanque elevado
placas laterales m2 8 1.05 3.00 25.20
base m2 1 3.30 3.30 10.89
tapa m2 1 3.30 3.30 10.89
ingreso para limpieza m2 8 0.60 0.35 1.68
1 0.80 0.80 0.64 141.19
04.09.03 Acero F'y=4,200 Kg/cm2 Cant. long. kg/m
Tanque cisterna
placas laterales
fierro de 1/2" Kg 4 22 2.60 1.02 233.38
fierro de 3/8" Kg 4 40 3.50 0.60 336.00
base
fierro de 1/2" Kg 1 28 4.40 1.02 125.66
fierro de 1/2" Kg 1 42 4.40 1.02 188.50
tapa
fierro de 3/8" Kg 1 26.4 3.50 0.60 55.44
fierro de 3/8" Kg 1 26.4 3.50 0.60 55.44
tapa de ingreso
fierro de 1/2" Kg 4 8 1.50 1.02 48.96
Tanque cisterna
placas laterales
fierro de 3/8" Kg 4 6 3.20 0.60 44.80
fierro de 3/8" Kg 4 15 1.25 0.60 45.00
base
fierro de 3/8" Kg 1 30 3.00 0.60 54.00
fierro de 3/8" Kg 1 15 3.00 0.60 27.00
tapa
fierro de 3/8" Kg 1 13.2 3.50 0.60 27.72
fierro de 3/8" Kg 1 13.2 3.50 0.60 27.72
tapa de ingreso
fierro de 1/2" Kg 4 8 1.50 1.02 48.96
Alambre N° 16 Kg 1 65.93 1384.50

04.10.00 SOBRECIMIENTO ARMADO


04.10.01 Concreto F'c=210 Kg/cm2 m3 2 48.00 0.15 0.60 8.64
eje 5 y 16 m3 2 29.55 0.15 0.80 7.09
m3 2 29.55 0.40 0.35 8.27 24.01
04.10.02 Encofrado y Desencofrado
m2 4 48.00 1.20 230.40
eje 5 y 16 m2 4 29.55 1.60 189.12 419.52
04.10.03 Acero F'y=4,200 Kg/cm2 Cant. long. kg/m
horizontales
fierro de 1/2" Kg 2 6 48.00 1.02 587.52
verticales
fierro de 1/2" Kg 2 192 1.60 1.02 626.69
horizontales
fierro de 1/2" Kg 2 9 29.55 1.02 542.54
verticales
fierro de 1/2" Kg 2 120 2.10 1.02 514.08
Alambre N° 16 Kg 1 113.54 2384.37

04.11.00 CONTROL DE CALIDAD CONCRETO


04.11.01 Rotura de Concreto Und. 180 1.00 180.00 180.00

05.00.00 COBERTURA
05.01.00 Cobertura de plancha de policarbonato t und 1 1.00 1.00

Página 16 Estructuras
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
Arquitectura!#REF!
12

10

6 Arquitectura!#REF!

0
1 2 3 4 5 6 7 8 9 10 11
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

01.02.02 ARQUITECTURA
01.02.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA
01.02.02.01.01 MURO DE CABEZA DE LADRILLO ARCILLA KK 18 HUECOS C/M 1:5 x 1.5CM. m2 109.97
PRIMER PISO
EJE A ENTRE EJE 5-7 2 3.325 2.68 17.85
2 area 1.97 3.94
EJE E ENTRE EJE 5-7 2 area 2.75 5.49
1 2.150 2.45 5.27
1 0.825 2.45 2.02
1 1.550 2.45 3.80
EJE F ENTRE EJE 5-6 2 area 2.75 5.49
1 2.150 2.45 5.27
1 1.550 2.45 3.80
1 0.825 2.45 2.02
EJE H ENTRE EJE 5-7 2 3.325 2.68 17.85
2 area 1.97 3.94
EJE 5 ENTRE A-H 1 3.900 1.00 3.90
1 3.850 1.00 3.85
2 3.200 1.00 6.40
EJE 7 ENTRE A-H 2 3.200 1.00 6.40
1 1.525 1.00 1.53
1 0.650 2.65 1.72
1 1.700 1.00 1.70
1 0.800 0.20 0.16
1 3.850 0.98 3.77
1 3.900 0.98 3.82

01.02.02.01.02 MURO DE SOGA DE LADRILLO K.K. 18 HUECOS C/M 1:5 X 1.5CM. m2 52.84
PRIMER PISO
ENTRE EJE E-F TRAMO 5-7 1 2.400 2.45 5.88
1 area 3.29 3.29
1 1.732 2.45 4.24
1 area 2.22 2.22
1 0.680 2.45 1.67
1 area 1.07 1.07
ENTRE EJE 5-7 TRAMO E-F 2 0.525 2.45 2.57
2 0.525 0.67 0.70
2 0.685 1.45 1.99
2 0.800 0.67 1.07
1 5.000 2.45 12.25
1 5.000 1.56 7.80
1 2.500 2.45 6.13
1 2.500 0.79 1.97

01.02.02.02 REVOQUES Y REVESTIMIENTO


01.02.02.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 320.20
1er. Piso
AULA
eje A 1 8.05 3.37 27.13
eje 7 2 3.55 3.10 22.01
ventana 05 -2 3.55 1.80 -12.78
eje E 1 8.05 3.37 27.13
eje 5 2 3.55 3.10 22.01
ventana 05 -2 3.55 1.80 -12.78

ss.hh. Niños 1 2.43 3.95 9.58


ventana 01 -1 0.85 0.85 -0.72
puerta 02 -1 0.80 2.65 -2.12
1 2.43 4.60 11.15
2 2.50 4.36 21.82

ss.hh. N1ñas 1 2.43 3.95 9.58


ventana 01 -1 0.85 0.85 -0.72
puerta 02 -1 0.80 2.65 -2.12
1 2.43 4.60 11.15
2 2.50 4.36 21.82
depósito 1 2.35 3.80 8.93
1 2.35 3.24 7.62
2 1.73 3.53 12.17
puerta 02 -1 0.80 2.65 -2.12
alacena 1 2.35 3.90 9.17
1 2.35 3.37 7.92
ventana 04 -1 1.55 1.80 -2.79
2 1.73 3.65 12.60
puerta -1 0.80 2.65 -2.12
cocina 1 2.50 3.80 9.50
1 2.50 3.37 8.43
ventana 04 -1 1.55 1.80 -2.79

Página 23 Arquitectura
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

2 3.60 3.96 28.50


puerta 02 -2 0.80 2.65 -4.24
sum 2 8.05 3.37 54.26
puerta 03 -1 1.20 2.65 -3.18
ventana 03 -2 4.20 1.80 -15.12
ventana 06 -2 4.25 1.80 -15.30
2 4.20 3.35 28.15
2 4.25 3.35 28.48

01.02.02.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA m2 113.31


posterior 1 22.05 3.30 72.77
ventana 05 -2 2.55 1.80 -9.18
ventana 04 -2 1.55 1.80 -5.58
ventana 03 -1 4.20 1.80 -7.56
ventana 06 -1 4.25 1.80 -7.65
frontal 1 7.85 3.30 25.91
1 9.20 3.30 30.36
ventana 05 -2 2.55 1.80 -9.18
ventana 03 -1 4.20 1.80 -7.56
ventana 06 -1 4.25 1.80 -7.65
2 1.90 3.60 13.68
puerta 03 -1 1.20 2.65 -3.18
1 5.00 3.91 19.55
ventana 01 -2 0.85 0.85 -1.45
puerta 02 -2 0.80 2.65 -4.24
laterales 2 8.55 0.84 14.28

01.02.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 7.50


primer piso
aula 2 0.57 3.35 3.82
sum 2 0.55 3.35 3.69

01.02.02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 39.74


primer piso
aula 1 7.66 1.25 9.57
sum 1 7.66 1.25 9.57
hall 1 5.00 1.25 6.25
viga borde 2 14.35 0.5 14.35

01.02.02.02.05 TARRAJEO EN CIELO RASO m2 203.00


primer piso
aula 1 8.468 8.05 68.17
ss.hh. Niños 1 2.63 2.425 6.38
deposito -1 1.815 2.35 -4.27
alacena -1 1.815 2.35 -4.27
ss.hh. Niñas 1 2.63 2.425 6.38
cocina 1 3.787 2.5 9.47
sum 1 8.468 4.2 35.57
1 8.468 4.25 35.99
ingreso ss.hh. 1 1.924 5 5.00
volado frontal 1 1.924 21.55 21.55
2 area 0.225 0.45
2 area 0.52 1.04
volado posterior 1 1.283 21.55 21.55

01.02.02.02.06 VESTIDURA DE DERRAMES CON CEMENTO ml 160.80


Puertas
Primer Piso
p-02 6 0.80 2.65 36.60
p-03 2 1.20 2.65 13.00
Ventanas
Primer Piso
v-1 2 0.85 0.85 6.80
v-03 2 4.20 1.80 24.00
v-04 2 1.55 1.80 13.40
v-05 4 3.55 1.80 42.80
v-06 2 4.25 1.80 24.20

01.02.02.02.07 TARRAJEO CON IMPERMEABILIZANTE ml 279.24


LOSA INCLINADA 1 11.78 22.05 259.84
VIGA CANAL 2 0.44 22.05 19.40

Página 24 Arquitectura
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

01.02.02.02.08 BRUÑAS DE 1.00 CM ml 371.51


frontal-posterior 2 6.36 12.72
2 6.31 12.62
8 5.60 44.80
8 14.13 113.03
4 5.66 22.63
2 16.59 33.18
2 6.31 12.62
2 6.36 12.72
2 0.85 1.70
2 4.20 8.40
2 1.55 3.10
4 3.55 14.20
2 4.25 8.50
lateral 4 11.83 47.33
ss.hh. Niños 1 6.18 6.18
ss.hh. Niñas 1 6.18 6.18
cocina 1 9.95 9.95
1 1.65 1.65

01.02.02.03 COBERTURAS
01.02.02.03.01 COBERTURA CON PLANCHA TIPO TEJA ANDINA m2 165.50
1 11.00 15.05 165.50

01.02.02.03.02 CORREA DE MADERA 2"x3" ml 195.65


13 15.05 195.65

01.02.02.04 PISOS Y PAVIMENTOS


01.02.02.04.01 CONTRAPISOS
01.02.02.04.01.01 CONTRAPISO DE 48 mm m2 171.28
Ier Piso
aula 1 area 59.43 59.43
ss.hh. Niños 1 area 6.183 6.18
ss.hh. Niñas 1 area 6.183 6.18
deposito 1 area 4.254 4.25
alacena 1 area 4.174 4.17
cocina 1 area 9.4 9.40
sum 1 area 70.26 70.26
hall 1 area 9.5 9.50
base mueble de cocina bloque aulas 1 area 0.36 0.36
1 area 1.54 1.54

01.02.02.04.01.02 FALSO PISO DE 4" DE CONCRETO 1:8 m2 169.38


Ier Piso
aula 1 area 59.43 59.43
ss.hh. Niños 1 area 6.183 6.18
ss.hh. Niñas 1 area 6.183 6.18
deposito 1 area 4.254 4.25
alacena 1 area 4.174 4.17
cocina 1 area 9.4 9.40
sum 1 area 70.26 70.26
hall 1 area 9.5 9.50

01.02.02.04.02 PISOS
01.02.02.04.02.01 PISO DE CERAMICA 30x30 CM. ALTO TRANSITO ANTIDESLIZANTE m2 159.88
Ier Piso
aula 1 area 59.43 59.43
ss.hh. Niños 1 area 6.183 6.18
ss.hh. Niñas 1 area 6.183 6.18
deposito 1 area 4.254 4.25
alacena 1 area 4.174 4.17
cocina 1 area 9.4 9.40
sum 1 area 70.26 70.26

01.02.02.04.02.02 PISO DE CEMENTO FROTACHADO m2 9.50


hall 1 area 9.5 9.50

01.02.02.05 ZOCALOS Y CONTRAZOCALOS


01.02.02.05.01 ZOCALOS
01.02.02.05.01.01 ZOCALO DE CERAMICA DE COLOR 30X20 CM m2 37.72

Página 25 Arquitectura
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

1er. Piso
ss.hh. Niños 1 9.35 1.80 16.83
ss.hh. Niñas 1 9.03 1.80 16.25
cocina 1 9.95 0.4 3.98
1 1.65 0.40 0.66

01.02.02.05.02 CONTRAZOCALOS
01.02.02.05.02.01 CONTRAZOCALO DE CERAMICO DE 10X30 cm m2 77.73
1er. Piso
aulas 1 25.33 25.33
1 4.28 4.28
depósito 1 7.85 7.85
alacena 1 7.68 7.68
sum 1 5.00 5.00
1 27.60 27.60

01.02.02.05.02.02 CONTRAZOCALO SANITARIO DE TERRAZO PULIDO m2 3.00


ss.hh. Niños 1 9.35 0.10 0.94
ss.hh. Niñas 1 9.03 0.10 0.90
cocina 1 9.95 0.1 1.00
1 1.65 0.10 0.17

01.02.02.05.02.03 CONTRAZOCALO DE CEMENTO PULIDO Y BRUÑADO H = 10 cm m 60.21


1er. Piso
hall 1 1.94 1.94
1 1.93 1.93
1 0.15 0.15
2 0.40 0.80
exteriores 1 56.20 56.20
-1 0.80 -0.80

01.02.02.06 CARPINTERIA DE MADERA


01.02.02.06.01 PUERTA APANELADA DE MADERA m2 92.55
Puertas
Primer Piso
p-02 6 0.80 2.65 36.60
p-03 2 1.20 2.65 13.00
p-04 4 0.60 1.80 16.80
modulo inodoro 4 0.59 1.80 16.75
2 1.10 1.80 9.40

01.02.02.06.02 MUEBLE BAJO DE MELAMINE PARA COCINA glb 1.00


1 1.00

01.02.02.07 CARPINTERIA ALUMINIO


01.02.02.07.01 VENTANA DE ALUMINIO INCLUYE VIDRIO TEMPLADO DE 6mm m2 63.01
Ventanas
Primer Piso
v-1 2 0.85 0.85 1.45
v-03 2 4.20 1.80 15.12
v-04 2 1.55 1.80 5.58
v-05 4 3.55 1.80 25.56
v-06 2 4.25 1.80 15.30

01.02.02.08 JUNTAS
01.02.02.08.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ml 347.54
frontal-posterior 2 6.36 12.72
2 6.31 12.62
8 5.60 44.80
8 14.13 113.03
4 5.66 22.63
2 16.59 33.18
2 6.31 12.62
2 6.36 12.72
2 0.85 1.70
2 4.20 8.40
2 1.55 3.10
4 3.55 14.20
2 4.25 8.50
lateral 4 11.83 47.33

Página 26 Arquitectura
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

01.02.02.09 CERRAJERIA
01.02.02.09.01 BISAGRA CAPUCHINA und 12 3.00 36.00 36.00
01.02.02.09.02 CERRADURA TIPO PESADA CON MANIJA DE 4"DE DOS GOLPES und 8 8.00 8.00
01.02.02.09.03 CERROJO DE 3" und 4 4.00 4.00

01.02.02.10 PINTURA
01.02.02.10.01 PINTURA LATEX EN MUROS INTERIORES m2 174.22
1er. Piso
AULA
eje A 1 8.05 3.37 27.13
eje 7 2 3.55 3.10 22.01
ventana 05 -2 3.55 1.80 -12.78
eje E 1 8.05 3.37 27.13
eje 5 2 3.55 3.10 22.01
ventana 05 -2 3.55 1.80 -12.78

ss.hh. Niños 1 2.43 3.95 9.58


ventana 01 -1 0.85 0.85 -0.72
puerta 02 -1 0.80 2.65 -2.12
1 2.43 4.60 11.15
2 2.50 4.36 21.82

ss.hh. N1ñas 1 2.43 3.95 9.58


ventana 01 -1 0.85 0.85 -0.72
puerta 02 -1 0.80 2.65 -2.12
1 2.43 4.60 11.15
2 2.50 4.36 21.82
depósito 1 2.35 3.80 8.93
1 2.35 3.24 7.62
2 1.73 3.53 12.17
puerta 02 -1 0.80 2.65 -2.12
alacena 1 2.35 3.90 9.17
1 2.35 3.37 7.92
ventana 04 -1 1.55 1.80 -2.79
2 1.73 3.65 12.60
puerta -1 0.80 2.65 -2.12
cocina 1 2.50 3.80 9.50
1 2.50 3.37 8.43
ventana 04 -1 1.55 1.80 -2.79
2 3.60 3.96 28.50
puerta 02 -2 0.80 2.65 -4.24
sum 2 8.05 3.37 54.26
puerta 03 -1 1.20 2.65 -3.18
ventana 03 -2 4.20 1.80 -15.12
ventana 06 -2 4.25 1.80 -15.30
2 4.20 3.35 28.15
2 4.25 3.35 28.48

Zocalo de Mayolica de color 20x30 m2


1er. Piso
ss.hh. Niños -1 9.35 1.80 -16.83
ss.hh. Niñas -1 9.03 1.80 -16.25
cocina -1 9.95 0.4 -3.98
-1 1.65 0.40 -0.66

Contrazocalo de Mayolica de color 10x30 m2


1er. Piso
aulas -1 25.33 0.10 -2.53
-1 4.28 0.10 -0.43
depósito -1 7.85 0.10 -0.79
alacena -1 7.68 1.10 -8.45
sum -1 5.00 2.10 -10.50
-1 27.60 3.10 -85.56

01.02.02.10.02 PINTURA LATEX EN MUROS EXTERIORES m2 56.95


posterior 1 22.05 3.30 72.77
ventana 05 -2 2.55 1.80 -9.18

Página 27 Arquitectura
HOJA DE METRADOS ARQUITECTURA

OBRA : “INSTALACIÓN DEL SERVICIO EDUCACIÓN INICIAL ESCOLARIZADO EN LA I.E.I. 2035 DEL CENTRO POBLADO ALTO TIWINZA, DISTRITO DE PANGOA,
PROVINCIA DE SATIPO, REGIÓN JUNÍN”

DISTRITO : SAN MARTIN PANGOA


PROVINCIA : SATIPO
DEPARTAMENTO : JUNIN FECHA : DICIEMBRE 2014
GRUPO : BLOQUE EDUCATIVO HECHO : ANDEZU

ELEMENTO DIMENSIONES METRADO


PARTIDA DESCRIPCION UND. N°VEC. LARGO ANCHO ALTO PARCIAL TOTAL

ventana 04 -2 1.55 1.80 -5.58


ventana 03 -1 4.20 1.80 -7.56
ventana 06 -1 4.25 1.80 -7.65
frontal 1 7.85 3.30 25.91
1 9.20 3.30 30.36
ventana 05 -2 2.55 1.80 -9.18
ventana 03 -1 4.20 1.80 -7.56
ventana 06 -1 4.25 1.80 -7.65
2 1.90 3.60 13.68
puerta 03 -1 1.20 2.65 -3.18
1 5.00 3.91 19.55
ventana 01 -2 0.85 0.85 -1.45
puerta 02 -2 0.80 2.65 -4.24
laterales 2 8.55 0.84 14.28
zocalo
1er. Piso
hall -1 1.94 -1.94
1 1.93 1.93
-1 0.15 -0.15
-2 0.40 -0.80
exteriores -1 55.40 -55.40

01.02.02.10.03 PINTURA LATEX EN COLUMNAS m2 7.50


primer piso
aula 2 0.57 3.35 3.82
sum 2 0.55 3.35 3.69

01.02.02.10.04 PINTURA LATEX EN VIGAS m2 39.74


primer piso
aula 1 7.66 1.25 9.57
sum 1 7.66 1.25 9.57
hall 1 5.00 1.25 6.25
viga borde 2 14.35 0.5 14.35

01.02.02.10.05 PINTURA CON OLEO MATE EN CIELORRASO 2 MANOS m2 74.55


primer piso
aula 1 8.468 8.05 68.17
ss.hh. Niños 1 2.63 2.425 6.38

01.02.02.10.06 PINTURA LATEX EN SUPERFICIE DE DERRAMES m2 160.80


Puertas
Primer Piso
p-02 6 0.80 2.65 36.60
p-03 2 1.20 2.65 13.00
Ventanas
Primer Piso
v-1 2 0.85 0.85 6.80
v-03 2 4.20 1.80 24.00
v-04 2 1.55 1.80 13.40
v-05 4 3.55 1.80 42.80
v-06 2 4.25 1.80 24.20

01.02.02.10.07 PINTURA BARNIZ EN PUERTAS DE MADERA 2 MANOS m2 92.55


Puertas
Primer Piso
p-02 6 0.80 2.65 36.60
p-03 2 1.20 2.65 13.00
p-04 4 0.60 1.80 16.80
modulo inodoro 4 0.59 1.80 16.75
2 1.10 1.80 9.40

01.02.02.11 VARIOS
01.02.02.11.01 EXTINTORES DE POLVO QUIMICO SECO DE 6 lb und
Primer Piso 1 1.00 1.00

01.02.02.11.02 SEÑALIZACION DE SEGURIDAD und


6 6.00 6.00